Loading...
HomeMy WebLinkAboutTermite treatmentPlanning & Development Services Building & Code Regulation Division i 2300 Virginia Ave Emus Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: I2J I(L� 34 JOB ADDRESS: BUILDER/CONTRACTOR: PEST CONTROL CONTRA{ PEST CONTROL LICENSE We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: - Chemicals used: %l C f . �' Percentage of solution: Total aa!lons used Date of Treatment: lc� ._ l Li�' 9 l Footing Is'Treatment Re -Treat Driveway 21�' Treatment Re -Teat f J 1" Treatment Re -Treat Time of Treatment: 1 . r 30 Slab — 1't Treatment Re -Treat Pools 1't Treatment Re -Treat —Perimeter f al Inspectign t r natureZof Exterminator Date Nate: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to e pii ked up by the inspector at time of each inspection or the scheduledinspectfon will fail and a rewispection fee charged FBC104.2.6 Certificate ofPmtectrve Treatment for prevention of termites, A weather resistantjobsfte posting board Shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another COPY for the building permit files The Treatment Certificate shallprovide the product used, ldenbty of the applicator, time and date of the treatment site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record of protective treatment. If the $oil chemical barrier method for termite prevention is used, fine/exterior treat mentshall be completed prior to final building approval, St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014