Loading...
HomeMy WebLinkAbout13 Concrete Placement - North Building (12-15-21)Florida 34986 A L Phone: 772 924-3575 Fax: 772 924-3580 ENGINEERING SCIENCES GFA PROJECT# 3310.2100348.0000 PROJECT Cristelle Cay Condos 4804 N. Al LOCATION Fort Pierce, FL 34949 PERMIT NO. North Building - 1908-0214 OWNER Cardinal Ocean Development, LLC WEATHER CONTRACTOR Cardinal Ocean Development, LLC TEMPERATURE ARCHITECT Frank C Snedaker WIND ENGINEER Stirling & Wilbur Engineering HUMIDITY CONCRETE PLACEMENT INSPECTION REPORT DATE Wednesday, December 15 2021 S I M I T I W TH F S DAY x BRIGHT SUN CLEAR OVERCAST RAIN x BELOW 60 60-75 75-90 ABOVE90 x LOW MODERATE HIGH Report No x LOW MODERATE HIGH 13 x MEMBERS/AREA INSPECTED: Area (1) Concrete Placement Monitoring / North Building Slab on Grade. THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED CONTRACT DOCUMENTS AND ACCEPTED PRACTICES. COMPLIES YES NO N/A x 1 SPARE VIBRATOR ON HAND x 2 FORMS WETTED/OILED x 3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW) x 4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW) x 5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAY'S POUR x 6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME x 7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET x 8 SUFFICIENT VIBRATION PERFORMED x 9 STEEL REMAINED IN PLACE DURING POUR x 10 P/T CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS Disposition of Inspection x Section / Area Observed Re -Inspection Work In Progress HRe-Inspection Required COMMENTS/ACTION REQUIRED: Slump taken every 50 CY within spells _ _ Inspection Performed B'y_-' 2Mar9, ,.. ,�H 61754* Inspection Certified B t•`c ]�/r Zr Paul n o E. Registered Professional N P 3 Certified Special Inspector No: SI 1103 FBPE Certificate No:. Q30 I n F _.•.� EW,onmental • Gsotectinical • Construction Materials Tasting • Special & Threshold Inspections a Plan Review &C.Wtpa pIll Florida's Leading Engineering Source III I I ! A