Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GENERAL INFORMATION SECTION INFORMATION
ST. LUCIE WORKS Section A (General Information) Master Permit No. Process No. Contractors Name: Q1 &wCL,,r& �\,.%n License tf __ CCc_ l33 ! 3r Job Address o ROOF CATEGORY ❑ LL" Slope ❑ Mechanically Fastened Tile ElMortar/Adhesive Set Tiles ®'Asphaltic Shingles ❑ Metal Panel/Shingles []Wood Shingles/Shakes 0 Prescriptive BUR-RAS 150 ROOF ROOF TYPE_ �� 0 New roof 17 Repair El Maintenance ®'Reroofing ❑ Recovering ROOF SYSTEM INFORMATION Low Slope Roof Area (SF) 3IR Steep Sloped Roof Area (SF) Total (SF) Section B (Roof Plan) Sketch Roof Plan: illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets. ST. LUCIE WORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer:�._��a�sc Product Approval Ncoo..: L 1,541 Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': — Zone 1: Zone 2: _Zone 3: Max. Design Pressure, from the specific product approval system; _��Q_ c[7- Deck: Type: p Gauge Thickness: i.{yti,,. 1M asr 11 Slope: fl �/ Anchor/Base Sheet & No. df Ply(s):� ip ZScQ Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material! Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':—" oc @ Lap, # Rows @ "©c Zone 1:—" oc @ Lap, # Rows @ "oc Zone 2:—" oc @ Lap, # Rows — @ " oc Zone 3:—" oc @ Lap, # RowS @ "oc Number of Fasteners Per Insulation Board: Zone 1': Zane 1: Zone 2: Zane 3:� Iliustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc, Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. i FT. ST. LUCIE WORKS Section D (Steep Slope Roof Systern) Roof System Manufacturer: s C!0 r f\% Notice of Acceptance Number: — IF l Minimum Design Wind Pressures, if Applicable (From RAS 127 or Calculations): Zone 1::! Zone 2e: Zone 2n: I�zone 2r: Zone 3e-. Zone 3r: Deck Type: U Type deriayment:ISO� Roof S ape: n� 12 Insulation: Fire Barrier: RidgeVentflation? Fastener Type & Spacing: Adhesive Type. Type Cap Sheet: —� PIC _ I Mean hoof Height: �j 1 Roof Covering: 0 Type & Size Drip Edge:0.efort— W r.1 lm U U z to r U) LU w ❑ ❑ H Q Q c Q 0 J J d W UJLU ( } a a d z CD (D Z �/ Z Z ❑ z �w Q ; 1 A- U ZZ -1� ; z U)� a n Z � r J LO CN J 00 CV J C) �— J L.L Z G � CO z r�I1 -J O E Z O2E 0_ � x Z) c /0 C� U ¢ w C) Z Q O z o U o N N OD C n � C a � Q C m N N m a rm w c � a C O N m N N 44 o o a IL C c C7 [a s ai �- 0 m a o a v rn 41 7 a }s li w V5 , Li a y