HomeMy WebLinkAboutP01 STAMPED PLUMBING GENERAL NOTES:
PLUMBING MATERIALS - DOMESTIC WATER: n4)
1. FIELD VERIFY DIMENSIONS PRIOR TO START OF WORK. DO NOT SCALE DRAWINGS. �✓
1. WATER PIPING SHALL BE SCHEDULE 80 PVC COMPLIANT WITH ASTM D 1785 WITH FITTINGS DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL LAYOUT OF PLUMBING SYSTEMS.
COMPLIANT WITH ASTM D 2467. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND ELEVATIONS OF ALL
PLUMBING FIXTURES.
FITTINGS SHALL BE ANY OF THE FOLLOWING: 2. ALL PLUMBING WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT EDITION
JOINTS AND FITTINGS SHALL BE COMPLIANT WITH 2O20 FBC-PLUMBING SECTIONS 605.14.1 THRU OF THE FLORIDA PLUMBING, ENERGY CONSERVATION, ACCESSIBILITY AND ALL APPLICABLE
LOCAL AMENDMENTS, CODES AND ORDINANCES.
6.5.14.5. ui
3. PROVIDE REDUCED PRESSURE BACK FLOW PREVENTERS, IF NOT ALREADY SHOWN, AT ALL o
WATER VALVES 2" AND SMALLER SHALL BE A BRONZE BALL VALVE, TWO-PIECE BODY, DOMESTIC WATER CONNECTIONS TO MECHANICAL EQUIPMENT, VENDING EQUIPMENT, AND
600 PSI WORKING PRESSURE, NIBCO MODEL S-585-80-LF (NSF-61 LEAD FREE) OR OTHER CONNECTIONS AS REQUIRED BY LOCAL CODE AND AUTHORITIES. W
APPROVED EQUAL. THE USE OF GATE VALVES SHALL BE PROHIBITED. p
4. PROVIDE A MANUFACTURED EXPANSION DEVICE OR FABRICATED EXPANSION LOOP .— 0-
2. NEW OR REPAIRED POTABLE WATER SYSTEMS SHALL BE PURGED OF DELETERIOUS MATTER ON ALL PIPING SYSTEMS TO COMPENSATE FOR EXPANSION AND CONTRACTION.
AND WHERE REQUIRED BY THE ADMINISTRATIVE AUTHORITY, DISINFECTED PRIOR TO UTILIZATION. 5. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR ALL EQUIPMENT AT ONE TIME, BOUND IL
THE METHOD TO BE FOLLOWED SHALL BE AS PER 2020 FBC-PLUMBING SECTION 610. IN THREE-RING BINDERS, INDEXED IN A NEAT AND ORDERLY MANNER. PARTIAL CO
SUBMITTALS WILL NOT BE ACCEPTED. PLUMBING CONTRACTOR SHALL NOT ORDER ANY o
3. PROVIDE ANGLE STOPS ON ALL WATER SERVICE LINES TO FIXTURES FOR INDIVIDUAL EQUIPMENT WITHOUT APPROVAL FROM PLUMBING ENGINEER, ARCHITECT, OWNER, AND
SHUT-OFF. INTERIOR DESIGNER (IF APPLICABLE). O v
N
4. INSTALL VACUUM BREAKERS ON ALL HOSE BIBBS AND HYDRANTS. 6. ALL PLUMBING EQUIPMENT AND MATERIALS SHALL BE INSTALLED ACCORDING TO ( W
MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT, - c�
5. DO NOT PENETRATE DOMESTIC WATER PIPING USED FOR ELECTRICAL GROUNDING THROUGH MATERIALS, AND WORKMANSHIP TO BE FREE OF DEFECTS. MATERIALS AND EQUIPMENT > � ��-
AND INTO THE ELECTRICAL ROOMS. TERMINATE THE PIPE OUTSIDE OF THE ELECTRICAL SHALL MEET THE REQUIREMENTS OF THE NATIONAL BOARD OF FIRE UNDERWRITERS, ASTM m LL Q)
ROOM AND PROVIDE GROUND STRAPS. & ANSI SPECIFICATIONS, LOCAL BUILDING CODES. CORRECTION OF ANY DEFECTS SHALL BE m
COMPLETED WITHOUT CHARGE. O E o 0 w
N
7. PRIOR TO PURCHASING ANY MATERIALS OR STARTING ANY WORK, CONTRACTOR SHALL ( m co v
FIELD VERIFY ALL EXISTING CONDITIONS, PIPING SIZES AND LOCATIONS, cz PLUMBING LEGEND ETC. SHOWN
ON THEEARCHITIECT. OR AFFECTING THIS WORK AND SHALL W LO � U U)
SYMBOL ABBREVIATION DESCRIPTION W
04 BALL VALVE IN VERTICAL 8. ALL WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST co m U*) 2 U
DQ BALL VALVE CLASS, WORKMANLIKE MANNER, AND COMPLETED SYSTEM SHALL BE FULLY OPERATIONAL.
G DN PIPING TURNING DOWN 9. CONTRACTOR SHALL PROVIDE A COMPLETE PLUMBING INSTALLATION INCLUDING ALL
0— UP PIPE TURNING UP WORK CUSTOMARILY INCLUDED EVEN IF NOT SPECIFICALLY CALLED OUT.
0 DN PIPING TURNING DOWN
N CV CHECK VALVE 10. CONTRACTOR SHALL NOT DO ANY CORE DRILLING THROUGH CONCRETE JOIST OR BEAMS.
3 CAPPED END OF PIPE CONTRACTOR SHALL REVIEW STRUCTURAL DRAWINGS BEFORE ANY CORE DRILLING SO AS
-- -- CW COLD WATER PIPING TO AVOID CUTTING ANY REINFORCING STEEL.
�-• HB HOSE BIBB 11 . CONTRACTOR SHALL VISIT THE EXISTING SITE (IF APPLICABLE) PRIOR TO BIDDING AND
SHALL INVESTIGATE ALL CONDITIONS THAT AFFECT HIS WORK; VERIFY LOCATIONS, SIZES,
DIMENSIONS, AND INVERT ELEVATIONS OF ALL ON-SITE SANITARY SEWERS, STORM
DRAINS, WATER MAINS AND NATURAL GAS MAINS, AND MAKE CERTAIN THAT ALL
CONNECTIONS CAN BE MADE. THE CONTRACTOR SHALL MAKE THE ARCHITECT/ENGINEER
AWARE OF ANY CONFLICTS.
12.. CONTRACTOR SHALL REVIEW ARCHITECTURAL, STRUCTURAL, MECHANICAL AND OTHER
DRAWINGS PRIOR TO BID AND SHALL COORDINATE ALL TRADES TO PROVIDE A
COMPLETE PRODUCT TO AVOID CONFLICTS BETWEEN THE TRADES, AND TO
DETERMINE WHICH TRADE IS TO PERFORM THE NECESSARY WORK.
RESOLVE ALL QUESTIONS OR CONFLICTS WITH THE ENGINEER IN THE FORM OF A REQUEST
FOR INFORMATION (RFI) DOCUMENT BEFORE ANY EQUIPMENT IS ORDERED, MATERIALS
FABRICATED OR SYSTEMS INSTALLED. CONSULT THE ARCHITECT'S DRAWINGS FOR ALL
GRADE AND FINISH FLOOR ELEVATIONS.
13. CONTRACTOR SHALL PROVIDE STAINLESS STEEL HANGERS & STRAPS FOR ALL PIPING. ( '
HANGER RODS AND DEVICES SHALL BE USED FOR SUPPORT OF ALL PIPING. MAKESHIFT
DEVICES WILL NOT BE ACCEPTABLE. PROVIDE STAINLESS STEEL SADDLES AS REQUIRED.
PIPING SUPPORT SPACING SHALL COMPLY WITH THE FLORIDA PLUMBING CODE-2020. j to
WITH THE FLORIDA PLUMBING CODE-2020. a 4 Q
o
14. CONTRACTOR SHALL PROVIDE ACCESS PANELS FOR ALL CONCEALED VALVES. z w 0
15. DOMESTIC WATER PIPING SHALL BE TESTED IN ACCORDANCE WITH SECTION 312 OF THE Q O
FLORIDA BUILDING CODE PLUMBING-2020.
W � zO
PLUMBING SHEET INDEX Cn W U-
U �� p =
P0.1 PLUMBING LEGENDS, NOTES & SHEET INDEX O
P1.1 PLUMBING SITE PLAN O U
P1.2 ENLARGED PLANS - TERMINAL PLATFORM (n# 2 Q w w
� wm
p v
8z
z w �
O co
Z �
w �
Q �
p
JQ
lil
Angelo L. da Silva P.E.
Florida Reg. No. 78400
X
W
C) PROJECT NO.: 210091
z ISSUE DATE: MAY 17 2021
PLOT DATE:
FILE NO.:
DRAWN BY. DJM
W
W REVISIONS:
06
N
W
O
z
V)
0
z
W
TO THE BEST OF MY KNOWLEDGE THE PLANS AND �
SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM
BUILDING CODES AS DETERMINED BY THE LOCAL AUTHORITY z
IN ACCORDANCE WITH THE 2020 FLORIDA BUILDING CODE, m
ALL AMENDMENTS AND SECTION 633 OF THE FLORIDA
STATUTES. 2 0o
J