HomeMy WebLinkAbout21-145A - OHS Condos-N Bldg-Bldg A- SLCPermit 2106-0287 - Report 07 12.27.21 DSIGNEDM L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-145A Report No. 7
Project Manager:
Building Official:
Contractor:
File:
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure-Con
Page 1 of 3
THRESHOLD INSPECTION REPORT
OCEAN HARBOR SOUTH CONDOMINIUMS – 2021 BALCONY REPAIRS
4250 N. HWY A1A – (NORTH BLDG – BLDG. A) – FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2106-0287
PROJECT NAME: Ocean Harbor South Condos – 2021
Balcony Repairs – N. Bldg. / Bldg. A DATE: December 27, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Units 808/708
OBSERVATIONS:
Units 808/708
• The PT cables have been spliced with new cables and encapsulated anchors.
• The PT cable casings were replaced under the exterior sliding glass doors.
• There are (3) barrel splices under the exterior window at the south wall and another (3) splice connections
under the SGD.
• The PT uniform cable running north to south to the balcony edge could not be relocated to the top of the slab
due to the existing reinforcing in the way, so it will be placed at its original location.
• A surface spall which occurred in the balcony slab when the broken cables were removed has repaired.
• All bars are cleaned and coated as per specs.
• All edge, bursting bars, and hair pins are in place as per specs.
RECOMMENDATIONS:
• Lift and re-tie (1) bottom reinforcing bar under the door to achieve the minimum concrete coverage.
• Cut approximately 1-inch of the existing top bar that is up in the top of the slab under the door.
• Clean and remove all debris from the areas to be poured.
• Tape all exposed PT cables to prevent bonding.
• Pour the slab spall repair area on the balcony in preparation to re-stress the cables.
• Stress the cables after the concrete has achieved a minimum of 3,000 psi.
• Re-pour the remaining areas after the cables have been tensioned.
______________________________
Michael Lue, P.E.
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-145A Report No. 7
Project Manager:
Building Official:
Contractor:
File:
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure-Con
Page 2 of 3
Pic 1
New cable anchors along balcony edge.
Pic 2
Bursting bars and hair pins behind anchors.
Pic 3
Surface spalled area to be poured first.
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-145A Report No. 7
Project Manager:
Building Official:
Contractor:
File:
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure-Con
Page 3 of 3
Pic 4
Full depth area under south SGD track with (6) PT
bands.
Pic 5
Current location of cables prior to stressing but will be
less after the cables are stressed.
Pic 6
Barrel splice connections in the slab under the exterior
CMU wall. The slab will have to be upturned under the
wall to cover the cables.