Loading...
HomeMy WebLinkAboutKingspermit4 ED ATE FPS Electric Service Standards PREPARED BY SUBJECT SECTION: PAGE Delivery uran - IV. SERVICE and METER CONNECTIONS IV: 6 of 24 Design u pport FIGURE E IV 1 Temporary/Construction Service - from Overhead System (typical ) 101 Direction of FPL pal For prompt electric service, set temporary pole as d etaEl d Service Drop 4�' Pole Cable Brace Attachment Point of attachment shall provide clearances as shown in Fig. I - Meter 1U 0 Disconnec in Min ' Means an t i n ' Min (Weatherproof ' Max rith ) T 1 " Min , ' Min Ground Wire enclosed in I r PVC conduit where required ' J Ground lid Driven minimum of 8 Notes : 1 . Before servi a n be run , Company must have an electrical inspection ; necessary tree trimming shall be done by the customer; and the deposit and non-refundable temporary service charge shall be paid. . Service pole shall not be within 25 ft. of swimming pool and must provide clearances shown ire Fig. l w . . Unspliced timbers are required (minimum length of 12 ft. for 2x4 braces and 1 ft. for 4x4 posts. Use ten penny 1 Od nails (3" long ). 4. Special arrangements scull be made with FFL if service drop exceeds 80 ft. or is larger than 00-amp capacity. 5. Minimum typical requirements are shown . If local code requirements are more stringent, they shall be adhered to. . The surface the meter o I t is mounted on shall be plumb so the meter socket jaws are truly vertical . The meter enclosure must be on FPL's approved list. . Where acceptable to the inspecting authority, an 18 ft. treated pole t' rain . diameter t the top may be substituted for the 4 4 timber and braces, provided the pole is set 5 ft. deep and well tamped . All other requirements remain the same. O 2021 , Florida Poorer & Light Company Page 6 of 24