Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST AND DUCT SEALING CERT g Planning&Development Services Building&Code Regulation Division 2300 Virginia Ave,Rm 201 • Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method Date: Permit#: SAC' �Uc,�5- U3 14 Contractor: �3tNntj JNLV Job Address: I ILA u a inu ow- Construction: ( ul"N'ew Construction—Complete ( ) Existing—After Addition House Infiltration Test esults SLC Climate Zone 2 CFM(50)= Test Date: Volume= 2 0 ACH (50)=CFM(50)x 60/Volume= 3• Mech Pcal Ventilation required less than 3 ACH Passing results must be&ACH (50)or less ( Pass ( ) Fail FBC,Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7), Florida Statutes or individuals licensed as set forth in Section.489.105 (3)(f), (g)or(i)or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building, thermal envelope. FBC,Residential Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w.c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling.unit shall be provided with whole-house mechanical ventilation in accordance with Section M1507.3. Testing Company Company Name: �S vS `� Address: gaaon ,ei+e 'Ue I6l I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requirements in accordance ith Section R402.4.1.2 Climate Zone 2. Signature: Printed Name: �V����v� .f►''1�?.f/�i License/Certification#: Planning&Development Services Building&Code Regulation Division ; 2300 Virginia Ave,Rm 201 Fort Pierce,FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method �y Date: �� a� 170a1 Permit#: �� 1 00 Lot'#: Contractor: lwj Mu Address: +�b% irm, %ve Construction: ❑Post Construction Test ❑Rough-in Test Test Conditions: Date: Floor Area(ft2): Time: _):I�QY't Primary Location of Supply Ductwork Z Indoor Temperature(F): . Primary Location of Return Ductwork Outdoor Temperature(F): 2s8y__'3 Total Leakage Test(Outside) Duct Leakage: ❑Default drop,Leak Free ❑Proposed On= Test Pressure: (Pa) Baseline Duct Pressure(optional) (Pa) Duct Press.(Pa) Flow Ring Fan Press Flow(cfm) Results: ass ❑Fail Installed Pa Total Leakage(cfm): (� Total Leakage per 100.sgft: v '�U CFM25 x 100 divided by the CFA=Duct Leakage CFM/100 sqft. Testing Comaany L I Company Name: Address: I hereby certify that the above D Sealing Leakage results demonstrate compliance with 5V Edition FBC Energy Conservation requirements in accordance with Section R40 .2. . Signature: Printed Name: av %VQ✓4/ License/Certificate#: G tA jj�X r �• Certificate of Achi*evement .V 4 THIS ACKNOWLEDGES THAT } Alexander Rivera .. HAS MET THE STANDARD REQUIRED BY RESNET, AS A k CERTIFIED RATING FIELD INSPECTOR R F I # E LA7 EX Certi f ication Date: June 7, 2019 Certi f ication Expires: June 7, 2022' .121 Tim Smith, RESNET Quality Assurance eW Q y Designee L s 3 A 15 1 h rs RESNET W RESIDENTIAL ENERGY SERVICES NETWORK - RESNET QA Provider # (1998-199)