HomeMy WebLinkAboutDrawing7 .�
1
ST. LUCIE COUNTY
PLAN REVIEW
BLDG:
DATE:
ELE
DATE:
PLUMB:
DATE:
MECH:
DATE:
5,6
Step 1. Begin with installing any logos (left or right Exxon or Mobil):
back skin, side return, LED tray, power supplies and face.
Step 2. Install logo corner panels on either side of the logo and the ends of each run.
Step 3. Install mounting brackets and 120" ACM panels, cutting one panel per side to fit.
Step 4. Install LED corners first, then install 118" LED downlignt starting with ACM panel next to the
logo. Install short downlight, cut to length or overlap as required on each side for site conditions.
Step S. Install (1) power supplies every other panel and connect to LEDs. Each corner downlight
comes with their own power supply.
Step 6. Install junction box power circuits every 200 feet for each side as required by site layout.
Electrician to connect to 120VAC.
Step 7. Install end caps.
3„
4
MIN. SETBACK REQ.
FRONT
SIDES
CNR SIDES
REAR
ZNG._
TECH.
*See installation guide
Who F E
REV1E Mph\A C
CD�E CC E CnuN�
g? , LV laOGC
Jownlighter
tall
on logo
tel with
ninated
ers
—►f !-2. projection
of Exxon ACM
fascia from
existing fascia
Project Name
PBL #
Customer
Created by
ExxonMobil
328546
ExxonMobil
Brand Book
B.Dighero
Page # ,.
Revision #
Date
Scale
R1
07 14 2021
NA
7 OF 18
f — lull-1 rn"' t—L. ea—k anA rroiYrinnlul hiertwec �ntmn�lv�n If maw nn11w rnr.ul n �hLdV.rl rc XicenminalM in env manror wiMw �f fhn wnXon ann..wal of Cite Imru �lafo��le �I �iNnn�nro all rrnnee rwnnron a.re wnn naw..r ..vum�r., inn
691"
Wf.>
lam