HomeMy WebLinkAboutProject Information 1y
CSM ENGINEERING, LLC
20B SW OCEAN BOULEVARD
STUART, FLORIDA 34994
-csm O: 772-220-4601
ENGINEERING w: www.CSM-E.NET
CIVIL STRUCTURAL • MARINE
GRAND ISLES CONDOMINIUM
INSPECTION CLOSE-OUT REPORT
i f
o
j
t
�1
z
a
Located At: Grand Isles
3702 North AlA
Fort Pierce, Florida 34949
Prepared For: Board of Directors& County
No ,6^io.
FILE COPY
4
Charles A. Darden Jr.
Florida Registered Professional Engine r#76910
1 OF 6
TABLE OF CONTENTS
Title Page Page 1
Table of Contents Page 2
Photos with Discussion Page 3
Close-out Letter Page 4
Calibration Test Results Page 5-6
'.
J, i i 1 A
l
Charfes A. b6den Jr.
Florida Registered Professional Engineer#76910
2 OF6
l
l
t
New Post Tension Cable
Note:Inspected&passed post tension cable install,
qmpmr
t�3
f 1 ,
s
$ $'
8 `
Pressure Gage Reading
Note: Post tension cable tensioning gage. Inspected&passed.
3 of 6
GSM ENGINEERING, LLC
20S SW OCEAN BOULEVARD
STUART, FLORIDA 34994
o: 772-220-4501
ENGINEERING w: www.CSM-E.NET
CIVIL • STRUCTURAL • MARINE
GRAIN® ISLES CONDOMINIUM
FINAL CLOSEOUT INSPECTION LETTER
Located At: Grand Isles Condominium
3702 North AIA
Fort Pierce,Florida 34949
Prepared For: St.Lucie County
2300 Virginia Ave.
Fort Pierce,Florida 34982
Permit#: 1901-0635
Re:Final Certification by the Engineer of Record
Dear Building Official,
This letter is to certify that the Contractor, General Building Services, Inc., has satisfactorily completed the restoration work at the
above-referenced location per the drawings and specifications; dated 1-18-19, submitted by CSM Engineering, LLC (Engineer of
Record).
CSM Engineering, LLC performed the ongoing inspections at the Grand Isles Condominium during demolition, for final concrete
placement, and for final post tension cable testing. All concrete was poured 24 hours after each inspection as per ICRI code
requirements. Inspections were performed during the months of February, March and April 2019. Inspections have been completed
as of 4-4-19.
We document�dl Be e pairs with digital photographs per the attached Inspection Report.
In the event any'_g1 o1ir cc� �fis,pie a con ct me.
Sinc ear,_ IJo_76" 0-
Charles 2?: Dar en Jr.
WE_-0F_ '
Florida Reisted;Prp�fl;Engzner 7 10
4OFG
G
M
L
�,Q IC af� S sulti Sakes
r-eral Sus` g Services Augmt 25,2017
FA so.Verm QQ4 Joh No, 17IN-629
Tendon% em1
b-5000 Is 1
- SO=
1 1 SON
0 Soo I'm 1500
PSI
Acceptable
a Accunwy .l,G°'a, X-1: .'l.n COM 4 50103.1 017 1 1
BuLromnental Comdi-doay.7 ,ate. .
The accumq ar-d cabbanon of tips imtr=em are u=able tG the Ngdonal of
Den Ca nted 6=20-18
Date:Due 6=21019
a70 SdrHng.}t l oLL ywo 4-rj. -1199 ' ,5,, (9,54) `-5742
E-Main =tm
5 of 6
GENERAL
wild' Services
Projectr _ _ eOol A V ell
Post Tension Stesslas Lqq
Tin Twidan ukM AqWW
Came Premra P too
t 1IV14 0 g. 3- 1
60Fa