HomeMy WebLinkAboutAPPROVED PLUMBING 5380-F85FB-v20.0 - Sheet - P1 - WASTE PIPING PLANDIMENSION REFERENCE LINE.
ESTABLISHED FROM EDGE OF SLAB)
I.E. = -2.00'
@ EDGE OF
BUILDING
DIMENSION REFERENCE
LINE. (ESTABLISHED
FROM EDGE OF SLAB)
DIMENSION REFERENCE LINE.
ESTABLISHED FROM EDGE
OF SLAB)
I.E. = -2.38'
@ EDGE OF
BUILDING
4" SANITARY I.E. = -3.25
@ 5'-0" OUTSIDE BUILDING
4" SANITARY
I.E. = -3.25'
@ 5'-0"
OUTSIDE
BUILDING
STAGING
WOMEN'S RESTROOM
WATER SERVICE
ROOM
ASSOCIATE
OFFICE
VESTIBULE
B12.2
F3
F5
2" COPPER PIPING FITTINGS TO ADAPT TO UNIT AND EXTEND TO THE FLOOR DRAIN.
MAKE THE FIRST 10' OF GREASE PIPING FROM FLOOR SINK AT THE B12.2 RETHERMALIZER
EXTRA HEAVY CAST IRON INSTEAD OF PVC.
MAKE THE FIRST 10' OF GREASE PIPING FROM FLOOR SINK AT THE B9.1 HOT FOOD TABLE
EXTRA HEAVY CAST IRON INSTEAD OF PVC.
FLOOR DRAIN GRATE TO BE SET FLUSH WITH TOP OF CONCRETE AND CENTERED UNDER
PARTITIONS.
FLOOR CLEANOUT TOP TO BE SET FLUSH WITH TOP OF FINISH FLOOR. SEE DETAIL 7/P5.
2" VENT TO BE CONNECTED WITH GREASE INTERCEPTOR AT THE INLET AND OUTLET.
1-1/2" PVC BELOW FLOOR FOR 1/2" HW LINE TO B9.1.
MAKE FIRST 10' DOWNSTREAM OF PIPING FROM FLOOR SINK AT THE B42.2 (BREAD OVEN)
EXTRA HEAVY CAST IRON INSTEAD OF PVC.
RUN IN WALL, TERMINATE 6" ABOVE THE CEILING.
EACH MULTI-COMPARTMENT SINK SHALL DISCHARGE INDEPENDENTLY TO AN INDIRECT
WASTE RECEPTOR WITH AN AIR GAP.
ROUTE CONDENSATE LINE THRU WALL TO HUB DRAIN.
2" PVC BELOW FLOOR FOR 3/4" CSRX LINE TO (2) EQ B37.1 & EQ B40
1-1/2" PVC BELOW FLOOR FOR 1/2" HWR, 2" PVC BELOW FLOOR FOR 3/4" CSRX, 2" PVC BELOW
FLOOR FOR 3/4" HW, 2" PVC BELOW FLOOR FOR 3/4" CW, 1-1/2" PVC BELOW FLOOR FOR 1/2"
CSR.
2" PVC BELOW FLOOR FOR 1/2'' HW, 2'' PVC BELOW FLOOR FOR 1/2'' CW.
ROOF DRAINAGE NOTE:
PROVIDE ROOF DRAIN (RD-1, TYPICAL OF 7) AND ROOF DRAIN OUTLET PIPE. ROUTE PIPE TO
DOWNSPOUT AND INTO DOWNSPOUT. SEE SHEET P3 FOR ROOF PLAN DRAINS AND DETAILS
ON SHEET A3.1 FOR ROOF DRAIN AND PIPING INSTALLATION.
SANITARY INVERT NOTE:
3.25' I.E. AT 5'-0" OUTSIDE BUILDING IS A COMMON ELEVATION FOR REFERENCE. COORDINATE
ACTUAL ELEVATIONS WITH SITE CONTRACTOR WITH REGARDS TO SITE SANITARY MAIN
INVERT.
1
2
3
4
5
6
7
8
9
10
11
12
13
PLUMBING KEYNOTES
EWC-1
LAV-2
MR-1
ECO 6"
øSTECO6"
ø STECO6"ø
ST
6"ø ST ECO
6"ø
ST ECO
6"ø STECO6"ø
STECO 6"ø ST6"
ø STECO ECO ROOF
TOTAL = 192 SFROOFTOTAL = 308 SF
ROOF TOTAL = 283SFROOFTOTAL = 280
SFROOF
TOTAL = 330 SF ROOF TOTAL = 134 SFROOF
TOTAL = 123 SF 6"
ø
STECO 4"
GREASE I.
E. = -3.25'
@ 5'-0" OUTSIDE
BUILDING DIMENSION REFERENCE
LINE.
ESTABLISHED
FROM
EDGE
OF SLAB)
I.E. = -3.10'
@ EDGE
OF
BUILDING
F5 B24
F5 B1.
1 B1.
2 B1.
2
B9.1
F5 F5 ELECTRICAL
ROOM WASH
ROOM FOOD SERVICE
FOOD
SERVICE COFFEE
RETAIL AREA
MEN'S RESTROOM
REAR VESTIBULE RETAIL
WALK-IN REFRIG.
DELIVERY VESTIBULE
SELF SERVICE
WALK-
IN REFRIG.
WALK-IN
FREEZER
WALK-
IN
REFRIG.B1.
2 C17.
3 B41
B37.1
B37.1 C22C28
C22 C28 C23C21
UR-1WC-
1 LAV-2
WC-1 EWH-
16"øST3"
ø S 3"
ø S4"ø
S4"ø S3"
ø S 3"
ø S 3"
ø S3"ø S3"ø S3"øS3"ø S3"
ø GR3"ø GR
3"ø GR 3"ø
GR3"ø
S4"
ø GR4"
ø
GR3"ø
GR3"ø GR4"
ø GR3"ø GR
3"ø
GR3"ø
GR4"ø
S4"ø
S 4"
ø S4"
ø S
3"ø
S1 1/
2"
ø V2
1/2"
ø V
FD-1WC-
1 FCO FD-1 FCO
FCOLAV-1 3"
ø S4"ø S4"ø
S2"ø
V 4"
ø S3"ø
SHUB-1 HUB-
1 FD-3
HUB-1 FD-
1 HUB-
1 HUB-1
HUB-1 HUB-1 HUB-1
HUB-1FCO
HUB-1 C3.
4 C3.3 3"ø GRHUB-1 2 1/2"
ø VTR 2"ø VTR 2
1/2"ø VTR C19.
1 HUB-1 3"ø
S 2"ø V2"ø
V4"ø S3"
ø S3"ø S3"ø
S3"ø S 3"ø
S3"ø S3"ø S4"
ø
S3"ø
S3"
ø S3"
ø S3"
ø GR
3"ø
GRFD-1
3"ø
GR 3"
ø GR3"
ø GR
3"ø GR3"
ø GR3"
ø GR2
1/2"
ø V1
1/2"
ø V2"
ø V2"
ø V
2"ø
V2"ø
V2 1/
2"ø
V 2"
ø V2
1/2"
ø V2
1/2"
ø V
2"ø
V2"ø
V2"ø
V 1
1/2"
ø V2"
ø V
1 1/
2"ø
V 1
1/2"
ø V
1 1/
2"ø
V 2"
ø V2"
ø V
1 1/
2"ø
V 1
1/2"
ø V
2 1/
2"ø
V1 1/
2"ø
V F5
FD-1
ECO HUB-
1 FS-
1 FS-
1 HUB-
1 FS-
1 FS-
1 FS-
5 FS-
5
FS-5
AAV0'-
0"2'-5"7'-
9"9'-1"10'-
4"11'-6"12'-0"14'-6"
19'-1"26'-
3"
27'-
11"
29'-
6"
32'-
6"
34'-
4"
35'-
7"
36'-11"37'-11"
43'-
2"
45'-
2"
46'-
3"
0'-
0"
2'-
0"
7'-
7"
10'-
10"
12'-
2"15'-
10"16'-8"
16'-10"17'-7"
35'-3"35'-
9"43'-
4"46'-
3"
0'-
0"
0'-1"2'-
6"4'-
3"5'-
0"6'-
2"7'-
11"9'-6"
9'-
8"9'-11"
11'-8"12'-11"14'-
0"21'-3"22'-