HomeMy WebLinkAbout5380-F85FB-v20.0 - Sheet - P4 - RISER DIAGRAMS4" SANITARY
I.E. = -3.25
@ 5'-0" OUTSIDE
BUILDING
4" GREASE
I.E. = -3.25 @
5'-0" OUTSIDE
BUILDING
4" SANITARY
I.E. = -3.25
@ 5'-0" OUTSIDE
BUILDING
2" VENT TO BE
CONNECTED
WITH GREASE
INTERCEPTOR
AT THE INLET
AND OUTLET.
6 "ø S T
6 "ø S T
ECO
ECO
6 "ø S T
6 "ø S T
ECO
ECO
6"
ø
ST
ECO
6"
ø
ST
ECO
6"
ø
ST
ECO
6 "ø S T
ECO
6 "ø S T
ECO
ROOF AREA = 30 SF
WALL AREA = 186/2 SF
TOTAL AREA = 123 SF
ROOF AREA = 29 SF
WALL AREA = 32/2 SF
WALL AREA =178/2 SF
TOTAL AREA = 134 SF
ROOF AREA = 156 SF
WALL AREA =188/2 SF
WALL AREA =160/2 SF
TOTAL AREA = 330 SF
ROOF AREA = 201 SF
WALL AREA =178/2 SF
TOTAL AREA = 280 SF
ROOF AREA = 198 SF
WALL AREA =170/2 SF
TOTAL AREA = 283 SF
ROOF AREA = 194 SF
WALL AREA =228/2 SF
TOTAL AREA = 308 SF
ROOF AREA = 121 SF
WALL AREA =142/2 SF
TOTAL AREA = 192 SF
6 "ø S T
ECO2"
ø V2 "ø
V 2 "ø
V 2"
ø V2"
ø VFD-
1 HUB-
1
FD-3
HUB-
1 3"ø
S2"ø
S3"ø
SFCO 4 "ø
S
HUB-
1
HUB-
1 4 "ø S FCO
3"ø S
1 1/2"ø
V2 1 /2 "øV
2 "
ø
V
6 "
ø
S
T
2"
øV2 "
ø
V2
1/
2"
ø
V
2
1/2"ø
V2"ø V2
1/2"ø
V
2 1/2"
ø V21/2"
ø
V2
1/
2"
ø
V
2 "øV
2 "
ø
V
2"
ø
V2"
ø
V4 "ø
S FCO 4 "
ø
S
FD-
1 3"ø
S4 "ø
S 4"
ø S 4"
ø
S
3"
ø S3"ø
S3"ø S3"
ø
S4"
ø
S 2"ø
V
FCO FD-
1 3"
ø
S3"
ø
S3"ø
S4 "ø
S 3"
ø S
3"ø
S HUB-1
HUB-1 3 "ø
S
2
1/
2"
ø
V1
1/
2"
ø
V3"
ø GR 3 "øS3"ø
S3 "ø
S 3"ø
S 3 "
ø S 3"ø
SFCO HUB-1 HUB-
1 3"
ø
S
HUB-
1 HUB-1 HUB-
1 HUB-
1HUB-1 3"
ø
S
3"
ø
S3"
ø
S4 "
ø G R ECO
3"ø
GR 3"
ø GR3"
ø GR
3"
ø
GR 1 1/2"
ø
V1
1/
2"ø
V3 "ø
G R
3"ø
GR2"ø
VFS-1
FD-
13"
ø
GR
FS-1
3"ø
GR4 "ø
G
R
4 "
ø
G
R
HUB-
1 3"ø GR
3 "ø G
R FS-1 FD-12"ø
GR3"ø GR3"
ø GRFS-1 3"ø GR
3"ø GR
3"øGR3"
ø GR1 1/2"
ø V1 1/2"ø
VFCO 4 "ø G R
FS-5
FS-5 FS-
5 HUB-
1 3"ø
GR3"ø GR2 1/2"
ø V1 1/2"
ø V2"ø V
2 "ø V2"ø V3"ø
GR3"ø GRWC-1 LAV-2 WC-1 LAV-1 WC-1 UR-
1 1 1/2"ø V LAV-2 EWC-1 MR-1
F5
F3 F5
F5
F5 F5 F5
2"
VTR
MIN.
OF
36"
ABOVE
ROOF 2 1/2" VTR
MIN.
OF
36"
ABOVEROOF
2 1/2"
VTR
MIN.
OF
36"
ABOVE
ROOF
3 "
ø
S4"ø
GRROOF
AREA = 115 SF
WALL
AREA =
42/2
SF TOTAL
ROOF AREA = 136 SF TOTAL ROOF AREA = 3686 SF TOTAL
ROOF
AREA = 1235
SF
TOTAL
ROOF
AREA = 2365 SF 1
1/2" PVC FOR 1/
2" HW 2" PVC FOR
3/4" CSRX
3) 2" PVC
FOR 3/4" CSRX, 3/
4" HW, & 3/4"
CW 2) 1 1/2" PVC FOR
1/2" HWR, & 1/2" CSR
AAV AAV AAV AAV3"ø S3"
ø S 4"ø S4"ø
S3"ø S ECO ECO
ECO 1 1/2"ø
V3"ø S3"ø S3"ø
GR1
1/
2"
ø
V 3"ø
GR3"ø GR2 1/2"ø V2"ø
V2 "ø V 3"ø
GR 3"ø GR3"
ø GR MW4 MW4 MW9.
1 3"ø
GR1 1/2"
ø V4"ø S LAV-1 MW5.4 4"ø S(2) 2"
PVC FOR 1/
2" HW & 1/2" CW AAV FS-5
3"ø GR
2" DOMESTIC WATER SERVICE. METER LOCATED IN
EXTERIOR
PIT. SEE CIVIL PLAN FOR CONTINUATION BOOSTER PUMP CONTROLLER ACI
PRESSURE TRANSDUCER,PART # A/GP-
100-20 2" DOMESTIC WATER MANIFOLD
1/2" UNSOFTENED CW TO FREESTYLE FILTER
3/4" CW TO WALL WCH 3/
4" CW TO ROOF WCH
1 1/2"
CW TO STORE 1" CW TO
CSR
SYSTEM 2" CW TO
TOILET ROOMS 3/4" CW
TO CANOPY WCH 2"
ø
CW
WCH
WATER
PRESSURE
GAUGE FOR
2" MAIN WATER, USE
1-1/2" WATER SUB-
METER WITH 10 GALLON
DRY CONTACT PULSE FOR INTERLINK TO BAS
SYSTEM.WATER SUB-METER:MANUFACTURER:
MASTER METER MODEL M22-A00-
A04-0412A-1, 1-1/
2" MAIN WATER SUB-METER
DOMESTIC WATER PIPING:USE
FLOWGUARD
GOLD
CTS
CPVC
PIPING
AND
FITTINGS.
CSR
SURGE
TANK MOUNT @ 7'-10"
A.F.F.)WCH
3/4" COLD WATER
LINE
RUN
DOWN
IN
WALL
AND
THEN
UNDERGROUND.
CONTINUECOLDWATER
LINE
UNDERGROUND
TO
WALLHYDRANT (
WCH)
LOCATEDIN
TRASH
COMPOUND
WALL. REFER TO TRASH COMPOUND
SHEET A10. USE BLACK POLY.1/2"
CW UNSOFTENED WATER FOR FREESTYLE SYSTEM
2"
CW
BY-
PASSNORMALLY
CLOSED
WCH
PROVIDEWATERTANKER
HOOK UP INSIDE WATER SERVICE
ROOM. TIE
IN BEFORE
SOFTENER.3/
4"ø
C W
EWH-1 WATER SERVICE
SHALL COME DIRECTLY INTO
BUILDING WITH NO FITTING
PER SITE
ENGINEERING PLAN
SE-1. (
DEEP LONG SWEEP
IS REQUIRED TO GET
INTO BUILDING)1 /2 "
øC W3 /
4 "
ø
C
W
3 /4 "ø C W
1 "
øC
W
1
1/
2"ø CW 2"ø
C W 1 /2 "ø
C W 2 "ø C W
1 "ø H W
1"ø CW1"ø
CWSA SA 1/2"ø TW1"
ø CW1/2"ø TW3/
4"ø
CWSA SA
1/2"
ø TW1/
2"ø
TW MX-
1MX-1
3/4"
ø
CSRX3/4"
ø CSR1/2"ø
FW 1/
2"ø FW1/
2"
ø
CSRX1/2"
ø
FW1/
2"
ø
CSRX1 /
2 "ø
F W
1 /2 "ø
C S R X
1 /2 "ø C S
R 1/2"ø
CSR1/2"ø CSR3/
4"ø CSRX1/2"ø
CSR MX-1MX-1
3 /4 "ø C
W MX-2 MX-2
MX-2 MX-
2 MX-2 MX-
2 BELOW SINK MX-2
BELOW SINK MX-2 BELOW
SINK MX-2 MX-
2 INSTALL SWINGING CHECK VALVE
BEFORE MIXING VALVE ON THE
HOT WATER PIPING (TYP.)
1/2"ø HWR3/4"
ø HW3/4"ø
CW1/2"ø CSR1/
2"ø HW 1/2"ø TW1/2"
ø CW3/4"
ø CSRX 3/4"ø
CSRX1/2"ø TW1/
2"ø CW3/4"
ø CW3/4"ø HW3/4"ø CW1
1/2"ø
HW3/4"ø HW1 /2 "
ø C W 1/2"ø
TW1/2"ø CW1 1/
4"ø H W 1 /
2 "ø
H W
1 /2 "ø C W 1/2"ø HW3/
4"ø CSR1/2"ø FW1/2"
ø
TW1/
2"
ø
CW1 /
2 "
ø
H
W R 1/2"
ø TW1/2"ø
CW1/2"ø CW
1/
2"
ø
TW
4"
PVC
SLEEVE
PIPE FOR WATER HOOK UP. CAP
BOTH ENDS.WC-1 WC-1LAV-2 LAV-1WC-1 LAV-2 UR-
1 EWC-1 SRX
FREESTYLE BOOSTER PUMP ON
BIB RACK FREESTYLE
FILTER
MOUNTED
TO
WALL
F5
F5
MR-
1
F5
F3 F5 F5 F5RP-1 CSR SYSTEMEQC22 (FREESTYLE)1/2"
BALL VALVE 3/8" WATTS
SD-3 EQ C28 (ICE
MAKER)
1/2"
BALL
VALVE
3/
8"
WATTS
SD-
3 EQ C21 (ICED
TEA)1/2" BALL
VALVE 3/8" WATTS SD-3 EQ C23 (FCB)
1/2" BALL VALVE 3/8" WATTSSD-
3 EQ
B40 (ESPRESSO)
W/ FILTER 1/2"
BALL VALVE 3/8" WATTS SD-3 EQ
B37.
1 (ICE MACHINE)
1/
2" BALL VALVE
3/
8" WATTS SD-