Loading...
HomeMy WebLinkAbout5380-F85FB-v20.0 - Sheet - P4 - RISER DIAGRAMS4" SANITARY I.E. = -3.25 @ 5'-0" OUTSIDE BUILDING 4" GREASE I.E. = -3.25 @ 5'-0" OUTSIDE BUILDING 4" SANITARY I.E. = -3.25 @ 5'-0" OUTSIDE BUILDING 2" VENT TO BE CONNECTED WITH GREASE INTERCEPTOR AT THE INLET AND OUTLET. 6 "ø S T 6 "ø S T ECO ECO 6 "ø S T 6 "ø S T ECO ECO 6" ø ST ECO 6" ø ST ECO 6" ø ST ECO 6 "ø S T ECO 6 "ø S T ECO ROOF AREA = 30 SF WALL AREA = 186/2 SF TOTAL AREA = 123 SF ROOF AREA = 29 SF WALL AREA = 32/2 SF WALL AREA =178/2 SF TOTAL AREA = 134 SF ROOF AREA = 156 SF WALL AREA =188/2 SF WALL AREA =160/2 SF TOTAL AREA = 330 SF ROOF AREA = 201 SF WALL AREA =178/2 SF TOTAL AREA = 280 SF ROOF AREA = 198 SF WALL AREA =170/2 SF TOTAL AREA = 283 SF ROOF AREA = 194 SF WALL AREA =228/2 SF TOTAL AREA = 308 SF ROOF AREA = 121 SF WALL AREA =142/2 SF TOTAL AREA = 192 SF 6 "ø S T ECO2" ø V2 "ø V 2 "ø V 2" ø V2" ø VFD- 1 HUB- 1 FD-3 HUB- 1 3"ø S2"ø S3"ø SFCO 4 "ø S HUB- 1 HUB- 1 4 "ø S FCO 3"ø S 1 1/2"ø V2 1 /2 "øV 2 " ø V 6 " ø S T 2" øV2 " ø V2 1/ 2" ø V 2 1/2"ø V2"ø V2 1/2"ø V 2 1/2" ø V21/2" ø V2 1/ 2" ø V 2 "øV 2 " ø V 2" ø V2" ø V4 "ø S FCO 4 " ø S FD- 1 3"ø S4 "ø S 4" ø S 4" ø S 3" ø S3"ø S3"ø S3" ø S4" ø S 2"ø V FCO FD- 1 3" ø S3" ø S3"ø S4 "ø S 3" ø S 3"ø S HUB-1 HUB-1 3 "ø S 2 1/ 2" ø V1 1/ 2" ø V3" ø GR 3 "øS3"ø S3 "ø S 3"ø S 3 " ø S 3"ø SFCO HUB-1 HUB- 1 3" ø S HUB- 1 HUB-1 HUB- 1 HUB- 1HUB-1 3" ø S 3" ø S3" ø S4 " ø G R ECO 3"ø GR 3" ø GR3" ø GR 3" ø GR 1 1/2" ø V1 1/ 2"ø V3 "ø G R 3"ø GR2"ø VFS-1 FD- 13" ø GR FS-1 3"ø GR4 "ø G R 4 " ø G R HUB- 1 3"ø GR 3 "ø G R FS-1 FD-12"ø GR3"ø GR3" ø GRFS-1 3"ø GR 3"ø GR 3"øGR3" ø GR1 1/2" ø V1 1/2"ø VFCO 4 "ø G R FS-5 FS-5 FS- 5 HUB- 1 3"ø GR3"ø GR2 1/2" ø V1 1/2" ø V2"ø V 2 "ø V2"ø V3"ø GR3"ø GRWC-1 LAV-2 WC-1 LAV-1 WC-1 UR- 1 1 1/2"ø V LAV-2 EWC-1 MR-1 F5 F3 F5 F5 F5 F5 F5 2" VTR MIN. OF 36" ABOVE ROOF 2 1/2" VTR MIN. OF 36" ABOVEROOF 2 1/2" VTR MIN. OF 36" ABOVE ROOF 3 " ø S4"ø GRROOF AREA = 115 SF WALL AREA = 42/2 SF TOTAL ROOF AREA = 136 SF TOTAL ROOF AREA = 3686 SF TOTAL ROOF AREA = 1235 SF TOTAL ROOF AREA = 2365 SF 1 1/2" PVC FOR 1/ 2" HW 2" PVC FOR 3/4" CSRX 3) 2" PVC FOR 3/4" CSRX, 3/ 4" HW, & 3/4" CW 2) 1 1/2" PVC FOR 1/2" HWR, & 1/2" CSR AAV AAV AAV AAV3"ø S3" ø S 4"ø S4"ø S3"ø S ECO ECO ECO 1 1/2"ø V3"ø S3"ø S3"ø GR1 1/ 2" ø V 3"ø GR3"ø GR2 1/2"ø V2"ø V2 "ø V 3"ø GR 3"ø GR3" ø GR MW4 MW4 MW9. 1 3"ø GR1 1/2" ø V4"ø S LAV-1 MW5.4 4"ø S(2) 2" PVC FOR 1/ 2" HW & 1/2" CW AAV FS-5 3"ø GR 2" DOMESTIC WATER SERVICE. METER LOCATED IN EXTERIOR PIT. SEE CIVIL PLAN FOR CONTINUATION BOOSTER PUMP CONTROLLER ACI PRESSURE TRANSDUCER,PART # A/GP- 100-20 2" DOMESTIC WATER MANIFOLD 1/2" UNSOFTENED CW TO FREESTYLE FILTER 3/4" CW TO WALL WCH 3/ 4" CW TO ROOF WCH 1 1/2" CW TO STORE 1" CW TO CSR SYSTEM 2" CW TO TOILET ROOMS 3/4" CW TO CANOPY WCH 2" ø CW WCH WATER PRESSURE GAUGE FOR 2" MAIN WATER, USE 1-1/2" WATER SUB- METER WITH 10 GALLON DRY CONTACT PULSE FOR INTERLINK TO BAS SYSTEM.WATER SUB-METER:MANUFACTURER: MASTER METER MODEL M22-A00- A04-0412A-1, 1-1/ 2" MAIN WATER SUB-METER DOMESTIC WATER PIPING:USE FLOWGUARD GOLD CTS CPVC PIPING AND FITTINGS. CSR SURGE TANK MOUNT @ 7'-10" A.F.F.)WCH 3/4" COLD WATER LINE RUN DOWN IN WALL AND THEN UNDERGROUND. CONTINUECOLDWATER LINE UNDERGROUND TO WALLHYDRANT ( WCH) LOCATEDIN TRASH COMPOUND WALL. REFER TO TRASH COMPOUND SHEET A10. USE BLACK POLY.1/2" CW UNSOFTENED WATER FOR FREESTYLE SYSTEM 2" CW BY- PASSNORMALLY CLOSED WCH PROVIDEWATERTANKER HOOK UP INSIDE WATER SERVICE ROOM. TIE IN BEFORE SOFTENER.3/ 4"ø C W EWH-1 WATER SERVICE SHALL COME DIRECTLY INTO BUILDING WITH NO FITTING PER SITE ENGINEERING PLAN SE-1. ( DEEP LONG SWEEP IS REQUIRED TO GET INTO BUILDING)1 /2 " øC W3 / 4 " ø C W 3 /4 "ø C W 1 " øC W 1 1/ 2"ø CW 2"ø C W 1 /2 "ø C W 2 "ø C W 1 "ø H W 1"ø CW1"ø CWSA SA 1/2"ø TW1" ø CW1/2"ø TW3/ 4"ø CWSA SA 1/2" ø TW1/ 2"ø TW MX- 1MX-1 3/4" ø CSRX3/4" ø CSR1/2"ø FW 1/ 2"ø FW1/ 2" ø CSRX1/2" ø FW1/ 2" ø CSRX1 / 2 "ø F W 1 /2 "ø C S R X 1 /2 "ø C S R 1/2"ø CSR1/2"ø CSR3/ 4"ø CSRX1/2"ø CSR MX-1MX-1 3 /4 "ø C W MX-2 MX-2 MX-2 MX- 2 MX-2 MX- 2 BELOW SINK MX-2 BELOW SINK MX-2 BELOW SINK MX-2 MX- 2 INSTALL SWINGING CHECK VALVE BEFORE MIXING VALVE ON THE HOT WATER PIPING (TYP.) 1/2"ø HWR3/4" ø HW3/4"ø CW1/2"ø CSR1/ 2"ø HW 1/2"ø TW1/2" ø CW3/4" ø CSRX 3/4"ø CSRX1/2"ø TW1/ 2"ø CW3/4" ø CW3/4"ø HW3/4"ø CW1 1/2"ø HW3/4"ø HW1 /2 " ø C W 1/2"ø TW1/2"ø CW1 1/ 4"ø H W 1 / 2 "ø H W 1 /2 "ø C W 1/2"ø HW3/ 4"ø CSR1/2"ø FW1/2" ø TW1/ 2" ø CW1 / 2 " ø H W R 1/2" ø TW1/2"ø CW1/2"ø CW 1/ 2" ø TW 4" PVC SLEEVE PIPE FOR WATER HOOK UP. CAP BOTH ENDS.WC-1 WC-1LAV-2 LAV-1WC-1 LAV-2 UR- 1 EWC-1 SRX FREESTYLE BOOSTER PUMP ON BIB RACK FREESTYLE FILTER MOUNTED TO WALL F5 F5 MR- 1 F5 F3 F5 F5 F5RP-1 CSR SYSTEMEQC22 (FREESTYLE)1/2" BALL VALVE 3/8" WATTS SD-3 EQ C28 (ICE MAKER) 1/2" BALL VALVE 3/ 8" WATTS SD- 3 EQ C21 (ICED TEA)1/2" BALL VALVE 3/8" WATTS SD-3 EQ C23 (FCB) 1/2" BALL VALVE 3/8" WATTSSD- 3 EQ B40 (ESPRESSO) W/ FILTER 1/2" BALL VALVE 3/8" WATTS SD-3 EQ B37. 1 (ICE MACHINE) 1/ 2" BALL VALVE 3/ 8" WATTS SD-