Loading...
HomeMy WebLinkAbout5380-F85FB-v20.0 - Sheet - M2 - HVAC ROOF PLAN1 2 3 7 7.8 8 F E D FACTORY INSTALLED SMOKE DETECTOR IN MAIN SUPPLY AND RETURN OF EACH ROOFTOP UNIT. INSTALL ROOF MOUNTED EXHAUST FAN PER DETAIL ON SHEET M3. COORDINATE EXACT LOCATION OF FAN PENETRATION WITH ARCHITECTURAL ROOF PLAN. TRANSITION GALVANIZED DUCTWORK AS NECESSARY FROM FAN INTO CEILING/JOIST SPACE. SEE SHEET M1 FOR CONTINUATION. PROVIDE FLEXIBLE CONNECTIONS BETWEEN ALL DUCTWORK AND MECHANICAL UNITS. ROUTE SCH. 40 PVC CONDENSATE DRAIN PIPING ALONG ROOF. SUPPORT PIPING PER DETAIL ON SHEET M3. MAINTAIN A MINIMUM 10' CLEARANCE BETWEEN OUTSIDE AIR INTAKES AND EXHAUST TERMINATIONS ON ROOF. FOOD SERVICE REFRIGERATION EQUIPMENT PROVIDED BY OTHERS. FOOD SERVICE REFRIGERATION EQUIPMENT MOUNTED ON PRE-ENGINEERED RACK. REFER TO "CONDENSING UNIT ROOFING SUPPORT DETAIL" ON ARCHITECTURAL SHEETS FOR FLORIDA PRODUCT APPROVAL INFORMATION. FOR SPECIFIC WIND LOADING REQUIREMENTS NOT TO EXCEED 180 MPH, SEE STRUCTURAL DRAWINGS. MECHANICAL CONTRACTOR TO PROVIDE SHEET METAL CURB CAP FOR REFRIGERATION EQUIPMENT CURB. SEE ARCHITECTURAL DRAWINGS FOR SPECIFIC REQUIREMENTS. 1 2 3 4 5 6 CONTRACTOR RESPONSIBLE FOR USING CURBS PLUS CLIPS ON ALL RTUS. CLIPS ARE DELIVERED TO SITE AS SEPARATE PACKAGE. 2 5 1 3 1 3 1 3 4 6 PIPE HOOD. REFERENCE ARCHITECTURAL PLANS. 7 7 4 4 6 RTU-1 RTU-3 8 8 C B A 3.5 4 5 6 1 1/ 4"øKEY NOTES: SHEET GENERAL NOTE: RTU- 2 9 9 1 1/ 4" ø1 1/ 4"ø1 1/ 4"ø1 1/4"øEF- 1 EF-3 2