HomeMy WebLinkAbout5380-F85FB-v20.0 - Sheet - E7 - SINGLE LINE DIAGRAMS, DETAILS AND NOTESSINGLE LINE NOTES:
RTU
3
RTU
2
RTU
1
GENERAL ELECTRICAL NOTES
M
REFRIGERATION
UNIT(
RE: "MDP" PANEL SCHEDULE)GE SPECTRA SERIES PANELBOARD 3Ø, 4W, 120/208V, 42kAIC, 1200 AMP BUS -MAIN
BREAKER COMBINED WITH THE BRANCH CIRCUIT BREAKERS, PROVIDES A SERIES
RATING
OF 65 KAIC.REMOTE 1. ELECTRICAL CONTRACTOR SHALL FURNISH ALL LICENSES, PERMITS, ETC. REQUIRED TO
PERFORM THE WORK. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL REQUIREMENTS
OF THE LANDLORD, LOCAL AUTHORITIES, THE UTILITY COMPANY, THE NATIONAL ELECTRICAL CODE AND
ALL OTHER AUTHORITIES HAVING JURISDICTION. UPON COMPLETION OF WORK, ELECTRICAL CONTRACTOR SHALL FURNISH TO
OWNER A CERTIFICATE OF APPROVAL ISSUED BY LOCAL AUTHORITIES OR BY AN ELECTRICAL INSPECTION AGENCY
LICENSED BY LOCAL AUTHORITIES TO PERFORM SUCH INSPECTIONS, ALL ELECTRICAL ITEMS FURNISHED AND/OR
INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE UNCONDITIONALLY GUARANTEED FOR BOTH PARTS AND LABOR FOR A PERIOD OF ONE YEAR
FROM DATE OF FINAL ACCEPTANCE BY OWNER. LIGHT BULBS AND LAMPS SHALL BE EXEMPT FROM THIS GUARANTEE; HOWEVER,
ON THE DATE OF FINAL ACCEPTANCE BY OWNER, ALL LIGHT BULBS AND LAMPS SHALL BE IN WORKING ORDER. WHERE
AN ITEM HAS BEEN FURNISHED BY OTHERS AND INSTALLED BY ELECTRICAL CONTRACTOR, ONLY THE INSTALLATION
AND WIRING SHALL BE GUARANTEED BY ELECTRICAL CONTRACTOR; GUARANTEE ON THE ITEM SHALL BE PROVIDED BY
THE
PARTY FURNISHING THE ITEM.2. GENERALLY, ALL WIRING SHALL BE INSTALLED IN ELECTRICAL METALLIC TUBING (EMT). SET SCREW FITTINGS
MAY BE USED IN AREAS NOT SUBJECT TO MOISTURE; USE WEATHERPROOF COMPRESSION FITTINGS IN
ALL LOCATIONS SUBJECT TO MOISTURE. FINAL CONNECTIONS TO RECESSED LIGHTING FIXTURES, VIBRATING EQUIPMENT, ETC.
SHALL BE MADE WITH FLEXIBLE METALLIC CONDUIT ("GREENFIELD") IN LENGTHS NOT TO EXCEED 5 FEET; WHERE SUCH
CONNECTIONS ARE MADE IN LOCATIONS SUBJECT TO MOISTURE, USE WEATHERPROOF FLEXIBLE METALLIC CONDUIT ("SEALTITE")
IN LENGTHS NOT TO EXCEED 5 FEET. IF PERMITTED BY LANDLORD AND LOCAL AUTHORITIES, CONCEALED BRANCH
CIRCUIT WIRING MAY BE INSTALLED IN METALLIC CABLE ("MC"). MC CABLE SHALL BE INSTALLED IN A WORKMANLIKE MANNER.
NO SUCH CABLE SHALL BE INSTALLED IN FRONT OF WALL OR PARTITION FROM CEILING SPACE DOWN INTO PANEL.
SUCH CABLES SHALL BE INSTALLED WITHIN WALL OR PARTITION IF POSSIBLE. IF SUCH CABLES ARE INSTALLED IN FRONT OF
WALL OR PARTITION, USE CONDUIT SLEEVES OR ENTER CABLES INTO A JUNCTION BOX INSTALLED ABOVE CEILING
AND SPLICE ONTO WIRING INSTALLED IN CONDUIT DOWN INTO PANEL. IF LATTER METHOD IS USED, INSTALLATION MUST BE
IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE AMPACITY TABLES. FOR THIS PURPOSE, #12 AWG TYPE THHN WIRE SHALL
BE RATED AT NOT MORE THAN 25 AMPERES. ALL EXPOSED WIRING, PANEL FEEDERS, HVAC EQUIPMENT FEEDERS, ETC.
SHALL BE INSTALLED IN ELECTRICAL METALLIC TUBING (EMT). NO EXPOSED NON-METTALIC
CABLE SHALL BE PERMITTED. 3. WIRING IN EARTH OR CONCRETE SHALL BE INSTALLED IN GRC CONDUIT, IMC CONDUIT OR PVC
CONDUIT (SCHEDULE 40). EACH CONDUIT RUNNING OUT TO OR THRU THE GAS CANOPY OR TANKS AREA SHALL BE GRC FOR THE
ENTIRE RUN OF CONDUIT. WHERE PVC CONDUIT IS USED, AN ADDITIONAL GROUND WIRE SHALL BE INSTALLED AS
REQUIRED BY THE NATIONAL ELECTRICAL CODE. THERE SHALL BE NO EXPOSED PVC CONDUITS. ALL STUB UPS, EXTENSIONS
ABOVE GRADE, ETC. SHALL BE IN METAL RACEWAY. USE GRC CONDUIT, IMC CONDUIT OR EMT. (THERE SHALL BE NO EMT
INSTALLED IN CONTACT WITH EARTH OR CONCRETE.) ALL UNDERGROUND CABLE SHALL BE INSTALLED IN RACEWAY. NO DIRECT
BURIAL CABLE OF ANY KIND SHALL BE USED UNLESS SPECIFICALLY NOTED. ALL UNDERGROUND WIRING SHALL BE
INSTALLED AT DEPTHS AS PRESCRIBED BY THE NATIONAL ELECTRICAL CODE. WHERE REQUIRED BY THE N.E.C.,
INSTALL A CONCRETE ENVELOPE AROUND CONDUITS. FOR UNDERGROUND WIRING IN EXCESS OF 600 VOLTS, A CONTINUOUS
WARNING RIBBON SHALL BE INSTALLED 24" ABOVE CONDUITS STATING "CAUTION BURIED HIGH VOLTAGE LINE BELOW".
RIBBON SHALL BE DETECTABLE TYPE AND SHALL BE LEM PRODUCTS #DET-609 OR EQUAL. ELECTRICAL CONTRACTOR SHALL
BE RESPONSIBLE FOR ALL CUTTING OF FINISHED SURFACES, EXCAVATION, CONCRETE ENVELOPES, TAMPING,
BACKFIELD, ETC. REQUIRED FOR INSTALLATION OF UNDERGROUND WIRING. IT SHALL BE THE RESPONSIBILITY OF
THE ELECTRICAL CONTRACTOR TO DETERMINE THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES, FACILITIES, ETC.
PRIOR TO STARTING ANY EXCAVATION. ELECTRICAL CONTRACTOR SHALL HAVE TOTAL RESPONSIBILITY FOR ANY DAMAGE
DONE TO ANY EXISTING UNDERGROUND UTILITIES OR OTHER FACILITIES BY HIS WORK. COLORS AND FINISHES
OF ALL SWITCHES, RECEPTACLES, DIMMERS, COVER PLATES, ETC. WILL BE SELECTED BY ARCHITECT. VERIFY ALL SUCH COLORS
AND FINISHES PRIOR TO
INSTALLING ANY WIRING DEVICES.4. SWITCHES AND RECEPTACLES SHALL BE SPECIFICATION GRADE (NOT "COMMERCIAL GRADE"). ALL
WIRING DEVICES SHALL BE RATED AT 20 AMPS AT THE VOLTAGE AT WHICH THEY WILL BE USED. WIRING DEVICES
SHALL UTILIZE CLAMP TYPE TERMINALS; BACK WIRED "PRESSURE TYPE" INSERT TERMINALS ARE NOT ACCEPTABLE. SINGLE
POLE SWITCHES SHALL BE HUBBELL #1221 SERIES (OR EQUAL); 3 WAY SWITCHES SHALL BE HUBBELL #1223 SERIES (OR
EQUAL). FOUR WAY SWITCHES SHALL BE HUBBELL #1224 SERIES (OR EQUAL). DUPLEX RECEPTACLES SHALL BE HUBBELL #
5362 SERIES (OR EQUAL). DIMMERS SHALL BE AS SPECIFIED ON DRAWINGS. WHERE SWITCHES AND DIMMERS ARE SHOWN
ADJACENT TO EACH OTHER, DO NOT INSTALL IN COMMON "GANG BOXES". SWITCHES MAY BE IN COMMON BOXES AND DIMMERS
MAY BE IN COMMON BOXES. HOWEVER, IF SWITCHES AND DIMMERS ARE INSTALLED IN SAME COMMON BOX, COVER
PLATES WILL NOT ALIGN PROPERLY. ALLOW 1" SPACE BETWEEN SWITCH BOXES AND DIMMER BOXES. CAUTION: USE
SEPARATE NEUTRALS FOR EACH DIMMER CIRCUIT. USE OF A COMMON NEUTRAL MAY CAUSE DIMMERS TO MALFUNCTION.
WHERE SWITCHES ARE SHOWN GANGED TOGETHER, LOCATIONS ARE DIAGRAMMATIC ONLY. ARRANGE SWITCHES IN ROWS
AS FIELD CONDITIONS DICTATE.5. ISOLATED GROUND CIRCUITS SHALL CONTAIN FULL SIZE, INSULATED, ISOLATED GROUND WIRE
WHICH SHALL RUN DIRECTLY FROM RECEPTACLE GROUND TERMINAL TO THE SERVICE ENTANCE EQUIPMENT GROUND BUS IT
SHALL BE CONNECTED AT NO OTHER POINT. WIRING FOR SUCH CIRCUITS SHALL NOT SHARE A NEUTRAL WITH NOR BE IN
THE SAME CABLE OR RACEWAY WITH WIRING FOR ANY OTHER CIRCUIT. AT EACH LOCATION SHOWN, FURNISH AND INSTALL
A 20 AMP, DUPLEX, ISOLATED GROUND RECEPTACLE IN PRECISE LOCATION AS DIRECTED IN FIELD. ISOLATED
GROUND RECEPTACLES SHALL BE HUBBELL #IG5362 OR EQUAL. WHERE SUCH CIRCUITS ARE IN CLOSE PROXIMITY, ONE COMMON
ISOLATED GROUND WIRE MAY BE INSTALLED TO SERVE TWO SUCH RECEPTACLES. HOWEVER, EACH RECEPTACLE SHALL CONTINUE TO
BE SERVED BY A
SEPARATE CIRCUIT AS SHOWN.6. ALL WIRE/CONDUCTORS FOR THIS PROJECT SHALL BE COPPER
REGARDLESS
OF
WIRING
METHOD.SFHA 250AF 225AT INSTALL
2 @ 6"
PROTECTIVE
BOLLARDS (TYP)
50AT
150AF
GROUND
BUS
SEHA
1
LIGHTING
CONTACTOR
PANEL
150AF
SEHA
60AT
2 SEHA
150AF
50AT
3
4
4)#
4/
0, (
1)#
4G(4)#
4/0, (1)#4GRPALPA
5 SFHA 250AF 100AT
250AF 225AT SFHA
6
7 REMOTE CT METERING CABINET TO
BE LOCATED AT
TRANSFORMER NEAR UTILITY
SERVICE
1200A.,
3PH.,
4
WIRE
120/208V
INCOMING
SERVICE COORDINATE
WITH
UTILITY CO.
250AF SFHA
60AT
RPG
EMERGENCY
SHUT-OFF
CONTACTOR
PC-
RPG
EMERGENCY
SHUT-
OFF
PC-
RPD
CONTACTOR
10
SEC.(
4)#
4/0, (
1)#
4G(
2)#
4/0, (
1)#
4G, & (
1)#
4
I.
G.(
4)#4/0, (1)#4GRPB
RPC
1 SFHA 250AF 225AT 8
SFHA 250AF 225AT
9 4)#6, (1)#10GSEC.2
RPD 2 POLE SFHA 250AF 200AT 11 12 RPU
250AF 13131313 SPACE 250AF 14
POWERPLUS INTEGRATED ELECTRICAL DISTRIBUTION SYSTEM MDP BUS BAR
CT METERS (1) PER PHASE LEG 4)
3" CONDUITS EACH CONTAINING (4) 350
KCMIL & (1) #
3/
0 G & (2) SPARE 3" CONDUITS (1) 2" CONDUIT (WAWA METERING) (#4/0 G IS FOR BONDING OF CT CABINET . DO NOT RUN THIS IF
UTILITY IS BONDING THE CABINET TO THEIR SYSTEM)SPACE PANEL MDP SHALL BE GE SPECTRA SERIES PANELBOARD SE LABEL, BOTTOM
FEED, 3P4W, 120/208V, 42KAIC, 1175 AMP, 3 POLE TYPE SKHH8 MAIN CIRCUIT BREAKER.PANELS LPA, RPA, RPB, RPC
AND RPH, SHALL BE GE TYPE AQ PANELBOARDS AS NOTED (TOP FEED, MAIN LUG ONLY).PANEL RPG SHALL BE GE TYPE AQ FEED THROUGH
PANELBOARD WITH 100 AMP, MAIN LUGS (TOP FEED) AS NOTED.PC-RPG SHALL BE SQUARE D, 100 AMP, 3 POLE CONTACTOR,
TYPE 8903SQO3V02. DISCONNECTING OF FUEL
PUMPING EQUIPMENT SHALL COMPLY WITH NEC 514.11.PC-RPD SHALL BE SQUARE D, 200 AMP,
2 POLE ELECTRICALLY HELD CONTACTOR, TYPE 8903SVO1V02. DISCONNECTING OF FUEL PUMPING EQUIPMENT SHALL COMPLY WITH NEC 514.
11.VERIFY ALL SHORT CIRCUIT RATINGS AND SERVICE
REQUIREMENTS WITH UTILITY. ALL PANELS TO BE FULLY RATED.VERIFY ALL NAMEPLATE DATA AND INSTALL PER N.E.C. NOTIFY WAWA
PROJECT MANAGER OF ANY DISCREPANCIES.COORDINATE CIRCUIT PROTECTION REQUIREMENTS WITH CONTRACTOR SUPPLYING EQUIPMENT.ALL EQUIPMENT FED FROM THIS PANEL SHALL BE SUPPLIED
WITH AN INSULATED, ISOLATED EQUIPMENT SAFETY GROUND. THE INSULATED GROUND SHALL BE CONTINUOUS AND UNBROKEN FROM EQUIPMENT TO PANEL.
PANEL RPD SHALL BE EQUIPPED WITH ISOLATED GROUND BUS BAR, PLUS AN EQUIPMENT GROUND BUS BAR. THE ISOLATED GROUND BUS WILL BE CONNECTED DIRECTLY TO MAIN DISTRIBUTION
PANEL GROUND BUS WITH INSULATED GROUND WIRE.PANEL RPD SHALL BE GE TYPE, AQ FEED THROUGH SINGLE PHASE, 3
WIRE PANELBOARD (WIRED AS TWO WIRE), WITH 225A DUAL MAIN LUGS (TOP FEED) AS NOTED. ELECTRICAL CONTRACTOR SHALL INSTALL A JUMPER BETWEEN
BOTH PHASE BUSES. PROVIDE SINGLE PHASE AND
NEUTRAL FEEDER FROM MAIN DISTRIBUTION PANEL. ALL CIRCUITS FED FROM PANEL RPD SHALL BE DISCONNECTED BY
EMERGENCY STOP EQUIPMENT PER METHOD GIVEN BY NEC 514.11.ELECTRICAL CONTRACTOR SHALL PROVIDE LAMINATED NAME
PLATE INDICATING:BONDING AND GROUNDING OF NEUTRAL CONDUCTORS, EQUIPMENT GROUNDING CONDUCTORS, GROUNDING ELECTRODE AND BONDING JUMPERS SHALL PERFORM AT THE MAIN DISTRIBUTION PANEL AS REQUIRED
FOR SERVICE EQUIPMENT BY
ARTICLE 250 OF THE NEC.200 AMP, 2 POLE BREAKER INSTALLED. ONLY 1 POLE OF THE
2 POLE BREAKER REQUIRED TO BE WIRED. RE: PANEL SCHEDULE SHEET E5 FOR WIRING CONFIGURATION OF
PANEL RPD.ADD A LABEL TO PANEL RPG STATING “
GASOLINE EQUIPMENT ONLY. DO NOT INSTALL ANY
ADDITIONAL CIRCUITS”ADD A
LEVEL TO PANEL RPU STATING “IT EQUIPMENT ONLY. DO NOT
INSTALL ANY ADDITIONAL CIRCUITS”1) #3/0 GND IN
1"C TO CONCRETE ENCASED ELECTRODE PER NEC 250-52A(
3). RE: DETAIL 3/
E7 1) #3/0
GND
IN
1"
C
TO
EXTERIOR
DRIVEN
GROUND
ROD
PER
N.
E.
C. #
250-52A(
3)
1) #
3/
0 GND IN
1"
C TO BUILDING
STEEL
METALLIC
CONDUITS
MUST
BE
BONDED
AT BOTH ENDS
12 11
10
8
9 7 6
5 3 4
2
1 12 9 3
9 45 10 1 POLE BREAKS
NEUTRAL 1 POLE BREAKS
LEG 250AF SFHA
50AT EWH RE: "
MDP" PANEL SCHEDULE)(
RE: "MDP" PANEL SCHEDULE)2222 8
8 8 8 8
6 1 RE: "MDP"
PANEL SCHEDULE)(RE: "MDP"
PANEL SCHEDULE)100%
UL RATED 1175A UTILITY MAIN G
300 KW
PORTABLE GENERATOR 120/208V 1000A
RATED, 1000 AMP
FULLY
RATED MAIN BREAKER PROVIDED BY
WAWA)100%
UL RATED 1175A GENERATOR
MAIN 3) 3-
1/
2"
CONDUITS
EACH CONTAINING (4) 500 KCMIL & 1) # 4/0 G NEMA 3R RATED PORTABLE
GENERATOR CONNECTION BOX. SEE SHEET E1 AND DETAIL ON SHEET E6.SINGLE KEY OPERATION (REFER TO
INTERLOCKING SEQUENCE OF OPERATION)PROVIDE DUAL MAIN BREAKERS WITH MANUAL TRANSFER SURFACE MOUNTED KIRK-KEY
INTERLOCKS WITH TAMPERPROOF BOLTS A"B"SINGLE KEY OPERATION PROHIBITS THE TWO LOCKING DEVICES FROM
BEING DISENGAGED AT THE SAME TIME. WITH THE KEY REMOVED BOTH DEVICES ARE IN THE
LOCKED POSITION. TO CLOSE THE UTILITY MAIN CIRCUIT BREAKER, THE KEY MUST BE INSERTED INTO LOCK "A"
AND ROTATED TO RETRACT THE INTERLOCK BOLT. THIS WILL ALLOW THE CIRCUIT BREAKER TO
BE MOVED TO THE CLOSED POSITION. THE KEY IS CAPTIVE AND CANNOT BE REMOVED
FROM THE LOCK
UNTIL THE CIRCUIT BREAKER IS MOVED
BACK
TO THE OPEN POSITION
AND THE KEY IS ROTATED TO
EXTEND
THE INTERLOCK BOLT. ONCE THE
INTERLOCK BOLT HAS BEEN
EXTENDED, THE
KEY
CAN
BE
RELOCATED
TO
LOCK "
B". THE
SAME PROCEDURE CAN THEN
BE IMPLEMENTED
TO
CLOSE
THE PORTABLE
GENERATOR MAIN
BREAKER.KIRK-
KEY INTERLOCKING SEQUENCE
OF
OPERATION 11 GASOLINE
DISPENSING EQUIPMENT
ONLY DO NOT
INSTALL
ANY ADDITIONAL
CIRCUITS"
TVSS TVSS
TO
BE PROVIDED
AND INSTALLED
BY PANEL
BOARD
PROVIDER/
MANUFACTURER
4)#1, (1)#6GRPH 2 SEHA 150AF 125AT INTERSYSTEM TERMINATION GROUND
BUS
BAR
PER
NEC
250.
94.
TO
PHONE, DATA,
ETC BY OTHERS
BONDING JUMPER
INSULATED #
6 AWG
MINIMUM
3) #4 & (
1) #8G
1-
1/
4"
C.JUNCTION BOX
FOR HARDWIRE
CONNECTION SEE ELECTRICAL
ROOM
ELEVATIONS LOCATED IN COMPUTER SERVER RACK 208V,1Ø, 3W
INPUT TERMINALS. CONNECT PER EQUIPMENT INSTALLATION INSTRUCTIONS.3) #4 (1) #
7G (1) #8 IG 1-1/4"C. TO
BUILDING STEEL TO COLD WATER PIPE 1) #8G UPS WITH
BYPASS BY OTHERS
INTERNAL
CONNECTIONS
BY
OTHERS OUTPUT
TERMINALS. CONNECT PER
EQUIPMENT INSTALLATION
INSTRUCTIONS
JUNCTION
BOX FOR HARDWIRE CONNECTION SEE ELECTRICAL ROOM ELEVATIONS LEAVE 8 FEET
OF SLACK IN ALL CONDUCTORS AND FLEX TO
AND FROM THE UPS
RACK SO THAT THE
RACK MAY BE
ROLLED OUT TO BE
WORKED ON. PROVIDE HOOK(S)
ON WALL
ABOVE J-
BOXES
TO COIL
UP EXTRA CABLING.J
J 208V,1Ø, 3W GROUND PER NEC AND INSTALLATION
INSTRUCTIONS LEGEND ELECTRICAL CONTRACTOR SHALL OBTAIN INTEGRATED POWER DISTRIBUTION SYSTEMS FROM
CD CONTROLS. CONTACT
ED RIOS FOR DELIVERY AND INSTALLATION REQUIREMENTS.
OFFICE: 706-356-0325 CELL : 706-476-7303 EMAIL:
WAWA@CDCONTROLS.
COM
INSTALLED
BY
ELECTRICAL
CONTRACTOR PRE-
WIRED BY
PANEL
MANUFACTURER PROVIDE
MAIN
AND SYSTEM
BONDING
JUMPER SIZED 4/
0 AT
MDP.FRONT
OF MDP SHALL HAVE
ARC FLASH HAZARD WARNING LABEL PER
NEC 110.16.
LABEL SHALL ALSO COMPLY
WITH NEC
110.21(
B).EACH
PANELBOARD SHALL BE PERMANENTLY
MARKED TO INDICATE SOURCE
OF SUPPLY PER NEC
408.4(B)13 14
14 13
LOCATED IN
THE MANAGER'
S OFFICE
PANEL RPG CONTACTOR
PANEL RPD
CONTACTOR NORMALLY CLOSED
MOMENTARY NC CONTACT.RECESSED
HEAD CLASS
9001,
TYPE KA3 OPERATOR WITH 1 N.C.
CONTACT SQUARE D # KR1RH6 CLASS 9001, TYPE
K60 COVER ATTACHMENT SQUARE D
ADDITIONAL EMERGENCY
SHUT-
OFF
PUSHBUTTONS AS
SHOWN
ON PLANS AND REQUIRED BY LOCAL
CODES 2) GE CONTACT BLOCK
P9B10VN RPC-41 2 POLE NORMALLY OPEN
MOMENTARY CONTACT. RECESSED PUSH BUTTON MARKED '
RESET'GE
OPERATOR # P9MPNRE LOCATED
AT
CHECKOUT COUNTER
RESET RESET
N
INCLUDE EMERGENCY SHUT-
OFF PUSHBUTTON TO
BE
LOCATED BEYOND THE
FUEL COURTCANOPY
AREA. SEE SHEETS E4
AND E6)LOCATED
ON CONTACTOR ENCLOSURE 2 IN.MIN.3/0
AWG BARECOPPER
CONDUCTOR, OR STEEL REINFORCING BAR,