Loading...
HomeMy WebLinkAbout5380-F85FB-v20.0 - Sheet - A7 - EXTERIOR DETAILSBRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME A7 20 ACROVYN OVER 1/2" GWB A9 26 A9 26 CONT. 2X P.T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH #4 WINGS @ 18" O.C. CONT. PERIMETER CAULKING SHIM AS REQ'D STOREFRONT SYSTEM CONT. CAULKING, TOP AND SIDES A 8" NESTED MTL STUDS 7.8 BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME A7 20 SHIM AS REQ'D 9" A9 26 A9 26 NOTE: CENTER STOREFRONT BETWEEN COLUMNS & BLOCKING MTL. STUD FRAMING IN THIS AREA AS REQ'D FOR ATTACHMENT OF STOREFRONT SYSTEM TO STRUCTURE CONT. CAULKING, TOP AND SIDES STOREFRONT SYSTEM ACROVYN OVER 1/2" GWB CONT. CAULKING, TOP AND SIDES STOREFRONT SYSTEM CONT. PERIMETER CAULKING ACROVYN OVER 1/2" GWB B 2 PRE-CAST ADHERED MANUFACTURED STONE WATERTABLE/SILL (BELOW) BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME A9 26 CONT. CAULKING, TOP AND SIDES STOREFRONT SYSTEM SHIM AS REQ'D CONT. PERIMETER CAULKING SHIM AS REQ'D ACROVYN OVER 1/2" GWB FIBER CEMENT ACCENT TRIM RE: EXT. ELEVS FIBER CEMENT LAP SIDING OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8” EXTERIOR GRADE PLYWOOD SHEATHING 8" METAL STUDS STEEL COLUMN RE: STRUCTURAL ACROVYN OVER 1/2" GWB A 1/2" GWB BATT INSULATION MIN. R-30 FIBER CEMENT ACCENT TRIM CONTINUOUS CAULKING, TOP AND SIDE STOREFRONT SYSTEM FIBER CEMENT LAP SIDING OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING PRE-CAST ADHERED MANUFACTURED STONE WATERTABLE/SILL CONT. PERIMETER CAULK CONT. 2X P.T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH #4 WINGS @ 18" O.C. BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL TO MATCH STOREFRONT -WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME SHIM, AS REQ'D MC8-SEE STRUCT. T.O. CLERESTORY 13' -6" CONT. 2X WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH #4 WINGS @ 18" O.C. CONT. CAULK, TOP AND SIDES CONT. PERIMETER CAULK CONTINUOUS SEALANT FLASHING EXTEND 4" UP WALL BEHIND LAP SIDING SHIM AS REQ'D STARTER STRIP LAP SIDING AS SCHEDULED RE: EXTERIOR ELEVATIONS B 8" NESTED MTL STUDS BATT. INSUL. MIN. R-30 CONT. 2X WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH #4 WINGS @ 18" O.C. PROVIDE END DAMS @ SILL, TYP CONT. PERIMETER CAULK CONT. SILL FLASHING SET IN BED OF SEALANT CONTINUOUS SEALANT TRIM. SEE ELEVATIONS CONTINUOUS SEALANT EXTEND ROOFING MEMBRANE UP SIDE WALL AND UNDER SILL (MIN. 8" VERTICAL) SHIM, AS REQ'D TUBE STEEL RE: STRUCTURAL B B.O. CLERESTORY 11' -0" BATT. INSUL. MIN. R-30 1"1" 6" PVC PIPE CONNECTED TO UNDERGROUND STORMWATER SYSTEM SET FLUSH W/ SIDEWALK SIDEWALK PROVIDE BACKER ROD CAULK VOID WITH SIKAFELX 4" DOWNSPOUT RE: ELEVATIONS CEMENT BOARD LAP SIDING OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING STARTER STRIP FLASHING. EXTEND 4" UP WALL BEHIND LAP SIDING CONTINUOUS SEALANT LIGHT FIXTURE RE: ELECTRICAL 1-1/2" TRIM BOARD CONTINUOUS SEALANT STUCCO J-MOLD @ COLOR CHANGE 4 1/8" 6"10" 1" 1"SEALANT 1/ 2" SLOPE 2-1/2" MTL. STUDS 7/8" STUCCO FINISH OVER 3. 4# SELF-FURRING GALVANIZED METAL LATH OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/ 8”EXTERIOR GRADE PLYWOOD SHEATHING 1-1/2" MTL. STUDS PRECAST ADHERED MFD STONE WATERTABLE / SILL ADHERED MANUFACTURED STONE VENEER 1-1/2" MTL. STUDS 8" MTL. STUDS 3'-0"T.O. STONE SILL 9'-0"B. O. TRIM 10'-4"T. O. TRIM A6. 1 5 22 A7 21 A7 2.5# SELF-FURRING GALVANIZED METAL LATH MORTAR SCRATCH COAT AND SETTING BED ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/ 8”EXTERIOR GRADE PLYWOOD SHEATHING STAINLESS STEEL SCREWS 2" 4" CLEAR ANODIZED ALUMINUM DOWNSPOUT 2" WIDE STAINLESS STEEL BRACKET WITH SMOOTH EDGES 2) LAYERS OF 1"THICK CPVC 7" EXTENDED WIDTH ALUM. THRESHOLD PER HARDWARE SCHED.DOOR RE: DOOR SCHEDULE PRE- MOLDED EXPANSION JOINT FLOOR AS SCHEDULED EXTERIORINTERIOR UNVENTED ALUMINUM PANEL SOFFITS THIS AREA DRIP FLASHING LIGHT GUAGE METAL FRAMING SECURED TO STRUCTURE ABOVE RE: STRUCTURAL FIBER CEMENT SIDING TRIM FLASHING CEMENT BOARD LAP SIDING OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/ 8”EXTERIOR GRADE PLYWOOD SHEATHING STARTER STRIP WRAP ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER AND ONE LAYER BUTYL RUBBER MEMBRANE BARRIER UNDER BOTTOM OF SOFFIT STEEL I- BEAM. RE: STRUCTURAL 5/ 8" PLYWOOD SHEATHING R30 BATT INSULATION GWB AS SCHEDULED CONT. PERIMETER CAULK SHIM, AS REQ'D 2X P. T. WD BLOCKING 8" METAL FRAMING CEMENT BOARD LAP SIDING OVER ONE LAYER HIGH-DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8" EXTERIOR- GRADE PLYWOOD SHEATHING STARTER STRIP FLASHING. EXTEND 4" UP WALL BEHIND LAP SIDING CONTINUOUS SEALANT 6" NOM. TRIM 4" NOM. TRIM BACKER ROD AND CAULK HOLLOW METAL FRAME 3 1/2" 5 3/4"5 1/2"(2) 16-GA STUDS 2) 16-GA TRACKS TOP & BOTTOM. RE: 4/ S5 7/8" STUCCO OVER ONE LAYER HIGH-DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/ 8" EXTERIOR- GRADE PLYWOOD SHEATHINGCONT. PERIMETER CAULK SHIM, AS REQ'D5 1/ 2" GWB AS SCHEDULED 2X P.T. WD BLOCKING 8" METAL FRAMING SEALANT 6" NOM. TRIM 4" NOM. TRIM BACKER ROD AND CAULK HOLLOW METAL FRAME 3 1/ 2"5 3/ 4"2) 16-GA STUDS 2) 16-GA TRACKS TOP & BOTTOM. RE: 4/ S5 1/ 2" CPVC TRIM 1" CPVC TRIM 1 1/ 2" STOREFRONT SYSTEM CONT. CAULK, TOP AND SIDES SHIM AS REQUIRED CONTINUOUS PERIMETER CAULKING 1/2" GWB 5/8" EXTERIOR GRADE PLYWOOD SHEATHING CONT. 2X WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S- WW 14X20X2 3/4" PFH #4 WINGS @ 18" O.C.BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8” EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME A SUBSTRATE AS SCHEDULED 6" TRIM.SEE ELEVATIONS 5 1/2" CONT. SEALANT CEMENT BOARD LAP SIDING OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/ 8” EXTERIOR GRADE PLYWOOD SHEATHING GENERATOR BOX RE: ELECTRICAL PAINT TO MATCH HARDIE SIDING FLASHING STARTER STRIP 6" PVC PIPE CONNECTED TO UNDERGROUND STORMWATER SYSTEM. EXPOSED PORTION OF PIPE TO BE WHITE LANDSCAPE PROVIDE BACKER ROD CAULK VOID WITH SIKAFELX 4" DOWNSPOUT RE: ELEVATIONS 1" GAP, TYP 1"1"ACROVYN OVER 1/2" GWB CONT. 2X P.T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2- 3/ 4" PFH # 4 WINGS @ 18" O. C. A7 20 8 1/ 2" 8"A9 26 A9 26 CONT. CAULKING, TOP AND SIDES CONT. PERIMETER CAULKING STOREFRONT SYSTEM CONT. CAULKING, TOP AND SIDES DOWNSPOUT LOCATIONS, SEE SHEET A1 BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8” EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME B 8" NESTED MTL STUDS 4"ATTACH STOREFRONT PER NOA / FLORIDA PRODUCT APPROVAL STOREFRONT SYSTEM BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8” EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME CONT. CAULK, TOP AND SIDES SHIM AS REQ' D 8 1/ 2"CONT. CAULK, TOP AND SIDES SHIM, AS REQ' D STOREFRONT SYSTEM ATTACH STOREFRONT PER NOA FLORIDA PRODUCT APPROVAL CONT. PERIMETER CAULKING ACROVYN OVER 1/ 2" GWB ACROVYN OVER 1/2" GWB CONT. PERIMETER CAULKING A9 26 A9 26 8" MTL. STUD FRM'G CONT. 2X P.T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH #4 WINGS @ 18" O.C.BRAKE METAL TRIM WITH HEMMED EDGES ( TYP)CONT. CAULK, TOP AND SIDES CONT. CAULK, TOP AND SIDES BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL TO MATCH STOREFRONT -WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME CONT. 2X P.T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK- PRO SELF DRILLING SCREWS S-WW 14X20X2 3/ 4" PFH #4 WINGS @ 18" O. C. ATTACH STOREFRONT PER NOA / FLORIDA PRODUCT APPROVAL 4 1/2" A7 20 8 1/ 2"ATTACH STOREFRONT PER NOA / FLORIDA PRODUCT APPROVAL CONT. 2X P. T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH #4 WINGS @ 18" O.C.ACROVYN OVER 1/2" PLYWOOD 4" MTL STUD FRAMING CONT. 2X P.T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH 4 WINGS @ 18" O.C. PRE-CAST ADHERED MANUFACTURED STONE WATERTABLE/ SILL ADHERED MANUFACTURED STONE VENEER OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME CONT. CAULK, TOP AND SIDES CONT. PERIMETER CAULK, BOTH SIDES 8" METAL STUDS RE: STRUCTURAL BATT INSULATION MIN. R-30 BACKER ROD & SEALANT SEALANT AT SILL 1-1/2" MTL STUDS 8" NESTED MTL STUDS 30 A7 A7 11 BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME CONT. 2X P. T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH #4 WINGS @ 18" O. C.STEEL COLUMN RE: STRUCTURAL 8" MTL STUDS. RE: STRUCTURAL CONT. PERIMETER CAULK BRAKE METAL OVER 1/ 2" GWB CONT. PERIMETER CAULK 1-1/2" MTL STUDS 4" 2' - 4 1/2" 2' - 8 1/2"4 1/ 2"2' - 4 1/2"5 1/ 2"STOREFRONT SYSTEM 5 1/ 2" 4 1/2"ADHERED MANUFACTURED STONE VENEER 2.5# SELF-FURRING GALVANIZED METAL LATH MORTAR SCRATCH COAT AND SETTING BED ONE LAYER HIGH-DENSITY POLYETHYLENE BARRIER OVER 5/ 8”EXTERIOR GRADE PLYWOOD SHEATHING 2' - 10"2' - 10" A 6 BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8” EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME STEEL COLUMN. RE: STRUCTURAL 8" MTL STUDS. RE: STRUCTURAL ADHERED MANUFACTURED STONE VENEER PRE-CAST ADHERED MFD STONE WATERTABLE/SILL (BEYOND)2' - 3" 4"2' - 7"4"2' - 3"2' - 7" 6" CONT. PERIMETER CAULK BRAKE METAL OVER 1/ 2" GWB CONT. PERIMETER CAULK STOREFRONT SYSTEM CONT. 2X P.T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S- WW 14X20X2 3/4" PFH # 4 WINGS @ 18" O.C.30 A7 A7 11 4"6"2. 5# SELF-FURRING GALVANIZED METAL LATH MORTAR SCRATCH COAT AND SETTING BED ONE LAYER HIGH-DENSITY POLYETHYLENE BARRIER OVER 5/ 8”EXTERIOR GRADE PLYWOOD SHEATHING SIM.A 6 10"3-5/8" MTLSTUDS 8" MTL STUDS CONT. 2X P. T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK-PRO SELF DRILLING SCREWS S-WW 14X20X2 3/4" PFH 4 WINGS @ 18" O. C.STEEL COLUMN RE: STRUCTURAL 1-1/2" MTL STUDS 5 1/2" 4 1/2"A9 26 TYP ADHERED MANUFACTURED STONE VENEER BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME 2.5# SELF-FURRING GALVANIZED METAL LATH MORTAR SCRATCH COAT AND SETTING BED ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8” EXTERIOR GRADE PLYWOOD SHEATHING A7 11 SIM.B 6 2' - 3 1/2"8" MTL STUD TRACK 10" 4" 6"ADHERED MANUFACTURED STONE VENEER BRAKE METAL OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. BRAKE METAL FILLER ANGLE TO MATCH STOREFRONT. WRAP SUBSTRATE AND TERMINATE BEHIND STOREFRONT FRAME 3-5/8" MTL STUDS 8" MTL STUDS CONT. 2X P.T. WOOD BUCKS SHALL BE ATTACHED USING HILTI KWIK- PRO SELF DRILLING SCREWS S- WW 14X20X2 3/ 4" PFH 4 WINGS @ 18" O.C. STEEL COLUMN RE: STRUCTURAL A9 26 TYP 2.5# SELF- FURRING GALVANIZED METAL LATH MORTAR SCRATCH COAT AND SETTING BED ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/ 8”EXTERIOR GRADE PLYWOOD SHEATHING A7 11 PRE-CAST ADHERED MFD STONE WATERTABLE/ SILL SIM.B 6 2' - 3 1/2"10"8" MTL STUD TRACK B.O. OVERHANG 9' -0"7/ 8" STUCCO FINISH OVER 3.4# SELF-FURRING GALVANIZED METAL LATH OVER ONE LAYER HIGH DENSITY POLYETHYLENE BARRIER OVER ONE LAYER BUTYL RUBBER MEMBRANE BARRIER OVER 5/8”EXTERIOR GRADE PLYWOOD SHEATHING. SOFFIT PANEL1"1' - 0 3/4" 1/2"4"P. T. 2X8 OVER WATER BARRIER CUT TOP TO SLOPE AWAY FROM BLDG.RE: STRUCTURAL BRAKE METAL COPING, TURN UP WALL 8" MIN.2 : 1 2 ONE LAYEROF HIGH- DENSITY POLYETHLENE BARRIER OVER ONE LAYER BUTYLRUBBER MEMBRANE OVER 5/8" EXTERIOR GRADE PLYWOODSHEATHING FLUSH FACE EXTENDER 22 GA. GALV. MATERIAL (12'- 0" LENGTHS)CONT. 22 GA GALV. CLEAT12'- 0" LENGTHS)2X4'S @ 24" O.C. RE: STRUCTURAL 1/ 2"J-MOLDSSOFFIT PANEL J-MOLDS 1X AZEK TRIM COLOR: WHITE61/ 2"G SHEET TITLECLIENT NAMEPROJECT NAMECHECKEDDRAWNDATEPROJECT NO.COPYRIGHT © - All reports, plans, specifications, computer files, field data, notes and otherdocuments are instruments of service prepared by: Cuhaci & Peterson, ( C & P) as instruments of service remain the propertyof C & P. C & P shall retain all commonlaw, statutory and other reserved rights, including thecopyright thereto. Any use or reproduction of this document withoutwritten permission from C & P is a violation of Federalcopyright laws.4/16/2020 12:07:33PMA7218071904- 17-2020S.G.A.D. M.EXTERIOR DETAILSORANGE AVE. & KINGSHWY, FT. PIERCE, FLWAWA260 WEST BALTIMORE PIKEWAWA, PENNSYLVANIA 19063WAWAF85FB 2020.00 STORE #5380-ORN04/ 17/2020 3" = 1'- 0"A7 3 STOREFRONT PLAN DETAIL3" = 1'-0"A7 4 STOREFRONT PLAN DETAIL3" = 1'-0"A7 1 STOREFRONT PLAN DETAIL3" = 1'-0"A7 7 STOREFRONT PLAN DETAIL 3" = 1'-0"A7 13 STOREFRONT HEAD 3" = 1'-0"A7 19 STOREFRONT SILL1 1/2" = 1'-0"A7 14A DOWNSPOUT DETAIL @ SIDEWALK3" = 1'-0"A7 18 EXTERIOR LIGHT MOUNTING DETAIL 1 1/2" = 1'-0" A7 30 TOWER LEG