To whom it may concern,
We have received a request for information (RFI) from Adams Homes that the building
listed above needs engineering review for the girder connector. Please see below RFI items
as well as our recommendation for repair. Please also see reference pictures attached to
end of this letter.
RFI: Contractor have a truss tie down issue on truss B01, it calls for J3 tie down
or two (2) Simpson LGT3 straps; it now has two (2) Simpson HETA20 straps on
each end of the truss.
Repair: In addition, Contractor shall install Simpson FGTR as per attached Partial
Truss Layout Plan. See RM02 Detail for FGTR proper attachment to CMU.
Based upon our structural review, we certify that the above repairs are adequate and
acceptable for the design loads of this project. If you have any questions, please don't
hesitate to contact us.
Sincerely,
,d++leeee�e
/and
tol�PABLO 1".-
•Q86¢ 9/4/2020 9/4'�9/4/2020
FCarl A. Brown, P.E. Luis Pablo TorI D. Norn, P.E.
FL. # 56126 FL. # 87864dL��� �'82126
al++++"Doing Business with a Servicen Eye for Detail"
a
258 Southhall Lane, Suite 200
fiF;�81 D Maitland, Florida 32751
P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com
Website: www.fdseng.com
ENGINEERING ASSOCIATES
Carl A. Brown, P.E.
FL. # 56126
P AS
u ` a dut ��a �Us• Q"'��
/020 9/4/2020
b
POP Op 7
L E N C-A
"Doing Business with a Service Minds�'hI adAUfif6
258 Southhall Lane, Suite 200
Maitland, Florida 32751
F D P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com
Website: www.fdseng.com
ENGINEERING ASSOCIATES
EXISTING CONC. TB DRILL 314' x 5'
MIN:: HDLC SET BAR IN EPDXY
CAP TO PREVENT LEAKAGE
•
Fw'
a
y
(105 EPDXY DOWEL
_
SAW CUT
Q
SECTION -A
J'
J
Ifs EMBEDDED INTO
EXISnNG MASONRY
DRILL 314" x S* MIN. HOLE
SETEARIN SIMPSON
'SEV .EPDXY OR EQUAL
E)IST1AgL, FOOTING
TOP OF SLAB
G_C_ TO VERIFY EXISTING"LOCATION TO
HAVE Nd FILLED CELL PRIOR TO FOLLOWING
THIS DETAIL IF FILLED CELL IS PRESENT AT
INDICATEDLOCATION, THIS DETAIL CAN BE
IGNORED FOR THAT LOCATION ONLY:IFNO
ST.EMWALL TO BE FILLED SOLID @ FILLED
M
FILLED CELL IS PRL•SENT• THIS DETAIL IS TO
CELL LOCAT.IONS'OR.REBARTO BE
_
9E FOLLOWED AS Wbi ATED ON THE PLAN
DOWELED INTO FODT[NG MIN. 5'SEE
FOUNDATION PLANFOR
MORE INFO.
MD
RETROFIT FILL CELL DETAIL
,sgy101111114
�•,����� PAB(��jijd
•
• I-1•C. • • �Qd40
0'0�•
• 100
N�(C�
,� O •,��i v
`� • e4
v �%I • � V • Y
O
9/4/2020
444 ' 0 s r � 9/4/2020
T ,�
cA • OR
•• !DA
Carl A. Brown, P.E. Luis Pablo Torres, �. Born, P.E.
FL. # 56126 FL. # 87864 11;14111110 • # 82126
"Doing Business with a Service Mind et and an Eye for Detail"
ENGINEERING ASSOCIATES
9/4/2020
Carl A. Brown, P.E.
FL. # 56126
258 Southhall Lane, Suite 200
Maitland, Florida 32751
P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com
Website: www.fdseng.com
�O:
Luis Pablo Toe RA
FL. # 87864 0� 'd; •<,
"Doing Business with a Service
, 9/4/2020
� a
7" 7'� Todd A# lJ'orn, P.E.
OP FL.- 8 26
A " / ee
detail"
t��$J61$A'89D1
i
+0.�
v
d
C
C
O
9 V
C d
�0
=V
FGTR/LGTNGT
Retrofit Girder Tiedowns
The LGT, VGT and FGTR products are moderate -to -high load
capacity girder tiedowns for new or retrofit applications.
LGT connectors provide a low -profile connection to the wall
for easy installation of drywall. Simple to install and can be
Installed on the inside or outside of the wall.
The VGT variable girder tiedown is a higher capacity
alternative to the LGT and MGT for girder trusses. It attaches
with Strong -Drive° SIDS Heavy -Duty Connector screws to the
side of truss and features a predeflected crescent washer that
allows it to accommodate top chord pitches up to 8/12. The
VGT is also available with one flange concealed for attachment
to trusses with no tail.
The FGTR face -mount girder tiedown is a non -pitch specific
girder tiedown that offers the highest uplift capacity
for retrofit applications. The FGTRHL/R is designed for corner
hip applications.
Material: VGT — 7 gauge; LGT2 — 14 gauge;
LGT3/LGT4 — 12 gauge; FGTR — straps: 7 gauge,
plater 3 gauge
Finish: VGT, LGT — galvanized; FGTR — powder coated
Installation:
• Use all specified fasteners; see General Notes.
• Connectors attached using TitenO 2 screws shall have
hex heads.
• To achieve the loads listed in the table below, the product
shall be attached to a grouted and reinforced block well
or a reinforced concrete wall designed by others to transfer
the high concentrated uplift loads to the foundation.
• Strong -Drive SIDS Heavy -Duty Connector screws included
with LGT3, LGT4, VGT series and FGTR series.
VGT/FGTR:
• Screw holes are configured to allow for double installation
on a two-ply (minimum) truss.
• The product can be installed in a single application or in
pairs to achieve a higher -uplift capacity.
• Can be installed on roof pitches up to 8/12 or on a bottom
chord designed to transfer the loads.
• FGTR — Only two of the four holes provided on each strap
are required to be filled to achieve the catalog loads. The
first Titen HD® anchor'h" x 5" (fHD) shall be installed a
minimum of 4" from the top of the wall. Anchors shall not be
installed in adjacent holes.
• VGT — When installed on trusses with no overhangs,
specify VGTR/L.
• VGT — Install washer component (provided) so that top
of washer is horizontal as well as parallel with top of wall.
Codes: See p.12 for Code Reference Key'Chart
LGT3 =1o'
LGT4 =125le
J.,
�
°
PSnN srM
Sti�ng�TiAb
LGT3 =14'4V qQ
LGT4=151'is' ® 6
°
° o
c °
o e
Moisture
barrier --
not shown
4 LGT3 = 5'
LGT4 = 6Y�,e
0
o ,• (See oplians)
LGT3 = sVS.
LGT4 `
LGT3-SDS2.5
(LGT4-SDS3 similar)
#5 re6ar
min.
LGT3=4W
LGT4 =4:'e
Typical LGT2 Installation
into Masonry
(LGT3 and LGT4 similar, ,
but installed with Trten HD)
SIMPSON
Strong,Tie
�'— 3°--►�— 2-Y4'
I-T
s s ® 3W
r
VGT
U.S. Patent 7,707,785
Typical VGT Installation
252
Typical VGTR Installation
FGTR/LGTNGT
Retrofit Girder Tiedowns (cont.)
StrongTie
Model
No:
Oty.
No. of
Plies
Fasteners
(in.)
Allowable Uplift Load
(160)
Code
Ref.
Girder I'
Concrete and GFCMU
DF/SP
SPF/HF
LGT2
1
2 ply
I (16) 0.148 x 31/4
I (7) 1/e x 21/d Titen®210
2,030
1750
LGT3-SDS2.5 `
1
3 ply
(12) 1/, x 21h SDS
(4)'4e x 5 Titen HD-
3.285
2;365
LGT4-SDS3
1
4 ply
I (16) Y4 x 3 SDS
(4) %x 5 Titen HD
3,285
2,365
1
2 ply min.
(16)1/, x 3 SDS
(1) %anchor'
4,940
3,555
VGT
2 ply min.
I (32) Ya x 3 SDS
(2) %anchors'
7,185
5,170
2
3 ply min.
I (32) U, x 3 SDS.
(2) % anchors'
8,890
6,400
FL
VGTUR
f
2 ply min.
(16)1/4x 3 SDS
(1) %anchor2
2,225
1,600
2
(32)1/4 x 3 SDS
(2) rYa anchors'
5,545
3,990
FGTR
1
2 ply min.
(18) Ye x 3 SDS
( (2) %x 5 Titen HD
4,725
3,400
I
FGTRHUR
1
2 ply min.
I (18)1/4 x 3 SDS
(2)1h x 5 Titen HD
3,635
2,615
1. Allowable loads have been increased for wind or earthquake loading with no
further increase allowed. Reduce where other loads govern.
2. To achieve the loads listed for the VGT single- and double -connector options,
anchorage into a 8' wide concrete tie -beam or grouted and reinforced CMU
tie -beam can be made using. SEf XPa anchoring adhesive with a minimum
embedment depth of 12", vhth a minimum end distance of 12", and centered
in the 8' member. Vertical reinforcement may be required to transfer the
loads per Designer.
3. Concrete shall have a minimum compressive strength of f c = 2,500 psi.
4. Grout -filled CMU (GFCMU) shall have a rninimum compressive strength of
Pm =1,500 psi.
5. FGTR — minimum edge distance for Titen HD& anchor is 4'.
6. FGTR — Titen HDO anchors should be spaced in every other hole
on the part.
7. FGTR — Titen HCP anchors and Strong-Driv& SDS Heavy -Duty Connector
screws are provided with the part.
8. LGT2 — Ft load = 700 Ib.; F2 load =170 lb.; LGT3 — F1 load = 795 lb.;
F2 load = 385 lb..; LGT4 — Ft load = 2,000 lb.; F2 load = 675 lb.
9. Products shall be installed such that TiterP screws and non -stainless
Titen HD® anchors are not exposed to the weather.
10. For concrete wall applications, use K' x 1 �a' Titeno 2 screws.
11. Strong -Drive° SDS Heavy -Duty Connector screws may be installed
through metal truss plates as approved by the Truss Designer, provided
the requirements of ANSVTPI 1-2014, Sections 7.5.3.4 and 8.92 are met
(predrilling required through the plate using a YZ bit maximum).
12. See p. 338 for Tden® 2 screw information.
13.Fasteners: Nail dimensions in the table are diameter by length.
SDS screws are -Simpson Strong -Tien Strong -Drive® screws.
See pp. 21 22 for fastener Information.
Install
Titen HI
In every
other hi
an the I
FGTRHL Installation
(FGTRHR similar)
Moisture barrier
not shown (typ.)
Shaded cells
grouted and
reinforced per
Desloner (min.)
16" min
from en(
of wall
16" min
from enc
of wall
Typical FGTR
Single Installation
Typical FGTR
Double Installation
16" min.
from end
of wall
Install
Tden HDs
in every
other hole
on the part
16" min.
from end
of wall
Install
Tden HDs
in every
other hole
on the part
253