Loading...
HomeMy WebLinkAboutTruss Girderr � 7 dJ rF D 8 ENGINEERING ASSOCIATES September 4, 2020 Building Department 258 Southhall Lane, Suite 200 Maitland, Florida 32751 P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com Reference: Adams Homes Lot: 32 Blk 1 Subdivision: _ Waterston Address: 8704 Merano Avenue, Fort Pierce, FL Model/Elevation: 1720 LHG KA# 20-1407 Permit# 2005-0155 To whom it may concern, We have received a request for information (RFI) from Adams Homes that the building listed above needs engineering review for the girder connector. Please see below RFI items as well as our recommendation for repair. Please also see reference pictures attached to end of this letter. RFI: Contractor have a truss tie down issue on truss B01, it calls for J3 tie down or two (2) Simpson LGT3 straps; it now has two (2) Simpson HETA20 straps on each end of the truss. Repair: In addition, Contractor shall install Simpson FGTR as per attached Partial Truss Layout Plan. See RM02 Detail for FGTR proper attachment to CMU. Based upon our structural review, we certify that the above repairs are adequate and acceptable for the design loads of this project. If you have any questions, please don't hesitate to contact us. Sincerely, ,d++leeee�e /and tol�PABLO 1".- •Q86¢ 9/4/2020 9/4'�9/4/2020 FCarl A. Brown, P.E. Luis Pablo TorI D. Norn, P.E. FL. # 56126 FL. # 87864dL��� �'82126 al++++"Doing Business with a Servicen Eye for Detail" a 258 Southhall Lane, Suite 200 fiF;�81 D Maitland, Florida 32751 P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com ENGINEERING ASSOCIATES Carl A. Brown, P.E. FL. # 56126 P AS u ` a dut ��a �Us• Q"'�� /020 9/4/2020 b POP Op 7 L E N C-A "Doing Business with a Service Minds�'hI adAUfif6 258 Southhall Lane, Suite 200 Maitland, Florida 32751 F D P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com ENGINEERING ASSOCIATES EXISTING CONC. TB DRILL 314' x 5' MIN:: HDLC SET BAR IN EPDXY CAP TO PREVENT LEAKAGE • Fw' a y (105 EPDXY DOWEL _ SAW CUT Q SECTION -A J' J Ifs EMBEDDED INTO EXISnNG MASONRY DRILL 314" x S* MIN. HOLE SETEARIN SIMPSON 'SEV .EPDXY OR EQUAL E)IST1AgL, FOOTING TOP OF SLAB G_C_ TO VERIFY EXISTING"LOCATION TO HAVE Nd FILLED CELL PRIOR TO FOLLOWING THIS DETAIL IF FILLED CELL IS PRESENT AT INDICATEDLOCATION, THIS DETAIL CAN BE IGNORED FOR THAT LOCATION ONLY:IFNO ST.EMWALL TO BE FILLED SOLID @ FILLED M FILLED CELL IS PRL•SENT• THIS DETAIL IS TO CELL LOCAT.IONS'OR.REBARTO BE _ 9E FOLLOWED AS Wbi ATED ON THE PLAN DOWELED INTO FODT[NG MIN. 5'SEE FOUNDATION PLANFOR MORE INFO. MD RETROFIT FILL CELL DETAIL ,sgy101111114 �•,����� PAB(��jijd • • I-1•C. • • �Qd40 0'0�• • 100 N�(C� ,� O •,��i v `� • e4 v �%I • � V • Y O 9/4/2020 444 ' 0 s r � 9/4/2020 T ,� cA • OR •• !DA Carl A. Brown, P.E. Luis Pablo Torres, �. Born, P.E. FL. # 56126 FL. # 87864 11;14111110 • # 82126 "Doing Business with a Service Mind et and an Eye for Detail" ENGINEERING ASSOCIATES 9/4/2020 Carl A. Brown, P.E. FL. # 56126 258 Southhall Lane, Suite 200 Maitland, Florida 32751 P: (321) 972-0491 1 F: (407) 880-2304 1 E: info@fdseng.com Website: www.fdseng.com �O: Luis Pablo Toe RA FL. # 87864 0� 'd; •<, "Doing Business with a Service , 9/4/2020 � a 7" 7'� Todd A# lJ'orn, P.E. OP FL.- 8 26 A " / ee detail" t��$J61$A'89D1 i +0.� v d C C O 9 V C d �0 =V FGTR/LGTNGT Retrofit Girder Tiedowns The LGT, VGT and FGTR products are moderate -to -high load capacity girder tiedowns for new or retrofit applications. LGT connectors provide a low -profile connection to the wall for easy installation of drywall. Simple to install and can be Installed on the inside or outside of the wall. The VGT variable girder tiedown is a higher capacity alternative to the LGT and MGT for girder trusses. It attaches with Strong -Drive° SIDS Heavy -Duty Connector screws to the side of truss and features a predeflected crescent washer that allows it to accommodate top chord pitches up to 8/12. The VGT is also available with one flange concealed for attachment to trusses with no tail. The FGTR face -mount girder tiedown is a non -pitch specific girder tiedown that offers the highest uplift capacity for retrofit applications. The FGTRHL/R is designed for corner hip applications. Material: VGT — 7 gauge; LGT2 — 14 gauge; LGT3/LGT4 — 12 gauge; FGTR — straps: 7 gauge, plater 3 gauge Finish: VGT, LGT — galvanized; FGTR — powder coated Installation: • Use all specified fasteners; see General Notes. • Connectors attached using TitenO 2 screws shall have hex heads. • To achieve the loads listed in the table below, the product shall be attached to a grouted and reinforced block well or a reinforced concrete wall designed by others to transfer the high concentrated uplift loads to the foundation. • Strong -Drive SIDS Heavy -Duty Connector screws included with LGT3, LGT4, VGT series and FGTR series. VGT/FGTR: • Screw holes are configured to allow for double installation on a two-ply (minimum) truss. • The product can be installed in a single application or in pairs to achieve a higher -uplift capacity. • Can be installed on roof pitches up to 8/12 or on a bottom chord designed to transfer the loads. • FGTR — Only two of the four holes provided on each strap are required to be filled to achieve the catalog loads. The first Titen HD® anchor'h" x 5" (fHD) shall be installed a minimum of 4" from the top of the wall. Anchors shall not be installed in adjacent holes. • VGT — When installed on trusses with no overhangs, specify VGTR/L. • VGT — Install washer component (provided) so that top of washer is horizontal as well as parallel with top of wall. Codes: See p.12 for Code Reference Key'Chart LGT3 =1o' LGT4 =125le J., � ° PSnN srM Sti�ng�TiAb LGT3 =14'4V qQ LGT4=151'is' ® 6 ° ° o c ° o e Moisture barrier -- not shown 4 LGT3 = 5' LGT4 = 6Y�,e 0 o ,• (See oplians) LGT3 = sVS. LGT4 ` LGT3-SDS2.5 (LGT4-SDS3 similar) #5 re6ar min. LGT3=4W LGT4 =4:'e Typical LGT2 Installation into Masonry (LGT3 and LGT4 similar, , but installed with Trten HD) SIMPSON Strong,Tie �'— 3°--►�— 2-Y4' I-T s s ® 3W r VGT U.S. Patent 7,707,785 Typical VGT Installation 252 Typical VGTR Installation FGTR/LGTNGT Retrofit Girder Tiedowns (cont.) StrongTie Model No: Oty. No. of Plies Fasteners (in.) Allowable Uplift Load (160) Code Ref. Girder I' Concrete and GFCMU DF/SP SPF/HF LGT2 1 2 ply I (16) 0.148 x 31/4 I (7) 1/e x 21/d Titen®210 2,030 1750 LGT3-SDS2.5 ` 1 3 ply (12) 1/, x 21h SDS (4)'4e x 5 Titen HD- 3.285 2;365 LGT4-SDS3 1 4 ply I (16) Y4 x 3 SDS (4) %x 5 Titen HD 3,285 2,365 1 2 ply min. (16)1/, x 3 SDS (1) %anchor' 4,940 3,555 VGT 2 ply min. I (32) Ya x 3 SDS (2) %anchors' 7,185 5,170 2 3 ply min. I (32) U, x 3 SDS. (2) % anchors' 8,890 6,400 FL VGTUR f 2 ply min. (16)1/4x 3 SDS (1) %anchor2 2,225 1,600 2 (32)1/4 x 3 SDS (2) rYa anchors' 5,545 3,990 FGTR 1 2 ply min. (18) Ye x 3 SDS ( (2) %x 5 Titen HD 4,725 3,400 I FGTRHUR 1 2 ply min. I (18)1/4 x 3 SDS (2)1h x 5 Titen HD 3,635 2,615 1. Allowable loads have been increased for wind or earthquake loading with no further increase allowed. Reduce where other loads govern. 2. To achieve the loads listed for the VGT single- and double -connector options, anchorage into a 8' wide concrete tie -beam or grouted and reinforced CMU tie -beam can be made using. SEf XPa anchoring adhesive with a minimum embedment depth of 12", vhth a minimum end distance of 12", and centered in the 8' member. Vertical reinforcement may be required to transfer the loads per Designer. 3. Concrete shall have a minimum compressive strength of f c = 2,500 psi. 4. Grout -filled CMU (GFCMU) shall have a rninimum compressive strength of Pm =1,500 psi. 5. FGTR — minimum edge distance for Titen HD& anchor is 4'. 6. FGTR — Titen HDO anchors should be spaced in every other hole on the part. 7. FGTR — Titen HCP anchors and Strong-Driv& SDS Heavy -Duty Connector screws are provided with the part. 8. LGT2 — Ft load = 700 Ib.; F2 load =170 lb.; LGT3 — F1 load = 795 lb.; F2 load = 385 lb..; LGT4 — Ft load = 2,000 lb.; F2 load = 675 lb. 9. Products shall be installed such that TiterP screws and non -stainless Titen HD® anchors are not exposed to the weather. 10. For concrete wall applications, use K' x 1 �a' Titeno 2 screws. 11. Strong -Drive° SDS Heavy -Duty Connector screws may be installed through metal truss plates as approved by the Truss Designer, provided the requirements of ANSVTPI 1-2014, Sections 7.5.3.4 and 8.92 are met (predrilling required through the plate using a YZ bit maximum). 12. See p. 338 for Tden® 2 screw information. 13.Fasteners: Nail dimensions in the table are diameter by length. SDS screws are -Simpson Strong -Tien Strong -Drive® screws. See pp. 21 22 for fastener Information. Install Titen HI In every other hi an the I FGTRHL Installation (FGTRHR similar) Moisture barrier not shown (typ.) Shaded cells grouted and reinforced per Desloner (min.) 16" min from en( of wall 16" min from enc of wall Typical FGTR Single Installation Typical FGTR Double Installation 16" min. from end of wall Install Tden HDs in every other hole on the part 16" min. from end of wall Install Tden HDs in every other hole on the part 253