Loading...
HomeMy WebLinkAboutMICROINVERTESData Sheet Enphase Microinverters Region. AMERICAS Enphase IQ 7 and IQ 7+ Microinverters The high-powered smart grid -ready Enphase IQ 7 Micro;" and Enphase IQ 7+ Mie,.o'M dramatically simplify the installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy"', Enphase IQ Battery"", and the Enphase Enlighten"' monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing, enabling Enphase to provide an industry -leading warranty of up to 25 years. Easy to Install Lightweight and simple Easter installation with improved, lighter two -wire cabling • Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable Optimized for Nigh powered 60-cell/120 half -cell and 72- cell/144 half -cell* modules More than a million hours of testing • Class II double -insulated enclosure - UL listed Smart Grid Ready ° Complies with advanced grid support, voltage and frequency ride -through requirements • Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles Meets CA Rule 21 (UL 1741-SA) * The IQ 7+ Micro is required 10 support 72-cell/144 half -cell modules. To learn more about Enphase offerings, visit enphase.com `? ENPHASE. Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA (DC) IQ7-60-2-US IQ7PLU5-72-2-US Commonly used module pairings' 235 W - 350 W + 235 W - 440 W + w Module compatibility 60-cell/120 half -cell PV modules 60-cell/l20 half -cell and 72- only cell/144 half -cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V - 37 V 27 V -45 V Operating range 16 V - 48 V 16 V - 60 V Min/Max start voltage 22 V / 48 V 22 V / 60 V Max DC short circuit current (module Ise) 15 A 15 A Overvoltage class DC port li 11 DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter � IQ 7+ Microinverter Peak output power 250 VA 296 VA Maximum continuous output power 240 VA 290 VA Nominal (L-L) voltage/rangez 240 V / 208 V / 240 V / 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A (240 V) 1.15 A (208 V) 1.21 A (240 V) 1.39 A (208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A (L-L) branch circuit3 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 18 mA 18 mA Power factor setting 1.0 1.0 Power factor (adjustable) 0.85 leading ... 0.85 lagging 0.85 leading ... 0.85 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak efficiency 97.6 % 97.696 « 97.5 % 97.3 qa_-- CEC weighted efficiency 97.0 % 97.0 iQ 97.0 % 97.0 `Yo MECHANICAL DATA Ambient temperature range Relative humidity range Connectortype Dimensions (HxWxD) Weight Cooling Approved for wet locations Pollution degree -400C to +65°C 4% to 100% (condensing) MC4 (orAmphenol H4 UTX with additional Q-DCC-S adapter) 212 mm x 175 mm x 30.2 mm (without bracket) 1.08 kg (2.38 Ibs) Natural convection - No fans Yes PD3 Enclosure Class 11 double -insulated, corrosion resistant polymeric enclosure Environmental category / UV exposure rating NEMA Type 6 / outdoor FEATURES Communication uPower Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load -break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 1 C7.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. I. No enforced DC/AC ratio. Seethe compatibility calculator at 2. Nominal voltage range can be extended beyond nominal if required by the utility 3. Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings, Visit enphase.com v EN PHAS E. ,a 2020 Enphase Energy All rights reserved Enphase, the Enphase logo. Enphase IQ 7, Enphase IQ 7+, Enphase IQ Battery, Enphase Enlighten, Enphase IQ Envoy, and other trademarks or service names are the trademarks of Enphase Energy, Inc Data subject to change 2020-08-12 powered by r DUO THE IDEAL SOLUTION FOR: Rooftop arraysion n resldenfialbuduildint3s Engineered in Germany =,:1ed �C www Yi]Eln}n.r.rm ID.40032587 17t;r QCELLS GERMANY'S MOST PoP LIAiPROm23 LReB LIHng Aware a9aV Q.ANTUM TECHNOLOGY; LOIN LEVELISED COST OF ELECTRICITY Higher yield per surface area, lower BOS costs, higher power classes, and an efficiency rate of up to 19.5%. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low -light and temperature behaviour. �. ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID Technology, Anti PIE) Technology', Hat -Spot Protect and Traceable Quality Tra.QT11 EXTREME WEATHER RATING 17) High-tech aluminium alloy frame, certified for high snow (5400 Pa) and wind loads (4000 Pa). W A RELIABLE INVESTMENT Inclusive 12-year product warranty and 25-year linear performance warranty2. STATE OF THE ART MODULE TECHNOLOGY 1 Q.ANTUM DUO combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology. `APT tast conditions nccoraing to IEC/TS h2804-1 20t5. method B {-1500V, 158h) • Son data sheet on rear for further intormatron OCELLS MECHANICAL SPECIFICATION Format 1740 mm x 1030 mm x 32mm (including Frame) Weight 19.9kg Front Cover 3.2mm thermally pre -stressed glass with anti-retlection technology Back Cover Composite film Frame Black anodised aluminium Cell 6 x 20 monocrystalline 4-ANTUM solar half cells Junction box Cable Connector 53-101 min x 32-60 min x 15-18 mm Protection class IP67, with bypass diode 4 si Solar cable, (+) a115C min, I-i -1150 min St;ubll MC4, Hai Q CELLS Hal ll'- � sa.TT .( aaomm 4.GaurAry pwnra p 4.6 mine~ NMr Nrnm minim j '�J -.'nso B-Wr^v naea 4Y �fwnNg rota iOETPll A7 } �Fm 3a min OMLA il6 mini 1tl 6mmT �Ta 5mm ELECTRICAL CHARACTERISTICS POWER CLASS 330 335 340 345 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC' (POWER TOLERANCE +6 W 1-O W) Power atMPP1 P„rr [W] 330 335 340 345 Short ClrcuRCurrent' I. [A[ 1041 10.47 10.52 1058 F Open CirruitVoltagn' V— IV] 4015 4041 4066 4092 t urrentMMl I'." [A] 991 9,97 1002 1007 Voltngc at MPP V,•rn IV] 3329 3362 3394 34 25 Ettieiellcy' q I%J a184 �187 >190 e193 MINIMUM PERFORMANCE. -;. AT NORMAL OPERATING CONDITIONS, NMOTr Power at MPP P,,- [W] 247.0 250.7 254-5 258.2 E ShortClanultCuripm L: [A] 839 843 8.48 8.52 Open Cimoit Voltog V ., iv] 3786 38.10 30 34 38 59 c Currnnf at MPP r [A] 7.80 7.84 789 793 Voltago al MPP V]V] 31.66 31.97 32.27 3257 Mnesdremant Iolernntsan P,.i.±J%.I V,... tb%at 51C 100o Wfni,2ht2'C, AM L5 according toll 61-P00VV/ri NMOT, spectrum AtA 15 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE YEARS TEMPERATURE COEFFICIENTS Al least 9R%of ncm.nol power dw Inp first year Thereafter mar 0 54% degradation per year. At (oast 93 1% of nominal power up to 10 years At least 85%of nomnal po:rer up to 25 years All data wti measurement toler- ances. Full warranties in accordance w th the warranty terms of the Q CELLS solos orgaclsation of your r6,pecbve country F oO --T-----1----------r----- 1 I I `d I kt 1° --� -----t I C eO t m i l I I I I Y00 400 "o 64O SOao IRRADIANCE Iwfmal Typ:cel module performa ace uri Irv,<r,rradarCe Cnndalors n comper,on to STC conditions (25°C, 1000 W/m ). Tom peretura Coefficient of ls� a [%/K] +004 Tompernture Coefficient at V,,,, p [%1K] -027 TrimperoturoCoefficient ofP„ y %/K 0.30 Nominal Moduli; Operating lem eura NP:Of [ C] 43±3 PROPERTIES FOR SYSTEM DESIGN Marini ^ayatOnn Valtege Vs,s [V] 1000 PV module classification Class II Maximum Revarse Current In [A] 20 rire Rating based on ANSI/UL 01710 CITYPE2 Max. LDsarirnLoad, Push IPu11 [Pa] 3600/2667 Perri Module Temperature -40°C-+85°C Max Test Load. Push/ Pull iPel 540074000 on Continuous fluty QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION VDF rLWit tesl9'.1 r �! iEC aL2l5:Ola, zaI O-C lad Hal IEG aP3e 2a1a Thi5 data sheaf cox.pkes �. /' /' f C Horizontal 1780mm 1080mm 1208mm \ 6731 28 pallets 26 Pallets 32 modules v,.Ir. G.N EN 50?a0 packaging Vertical 1815mm 1150mm 1220mm 6831 28 pallets 24 pallets 32 modules Feel Note: Incre,tenon rnstruos—must be foll—d Sae the—ts:latlon gad cp6reting mamral cr­tact cur technical secoce deportment fer furtherinformEran on appro'✓edi StMatca ar„du of this product 0 CELL3 G,vplpz :clan -du- In hw different stacking methndn depending on the iucaiion of manufacture `n•.odufea era Packs,] hv"zc,tally q, vert:callyf You can hrd more detailed ,,fc,,,t,,n in the dxu„erI "Packagr.g and Trannnori INwmal�cn' —rlatle from O CEL l 5 Hahwhe O CELLS GmbH Sonnenallea 17-21.06766 BitterfelcIANolfon, Germany I TEL +49 (0)349466 99-234441 FAX+49 (6)349466 99-230001 EMAIL saiec@q-cntIs cam I WE8 wwwq-cell; cnm Engineered in Germany GICELLS MODULE COMPATIBILIT ._ SunEdison 1 Suniva Sunpower Sunspark Suntech i TE Te Tri n a URE 3 SunEdison Modules with 35, 40 & 50 mm frames SE-YxxxZABCDE Where "Y" can be B. F. H. P, R, or Z; "Z" can be 0 or 4; "A" can be B,C,D,E,H,I,J,K,L,M, or N ; "B" can be B or W; "C" can be A or C; "D" can be 3, 7, 8, or 9; and "E" can be 0, 1 or 2 Suniva modules with 35, 38, 40, 46, and 50 mm frames OPTxxx-AA-B-YYY-Z MVXxxx-AA-B-YYY-Z Where "AA" is either 60 or 72; "B" is either 4 or 5; "YYY" is either 100,101,700,1130, or 1 B1; and "Z" is blank or B Sunpower standard (G3 or G4) or InvisiMount (G5) 40 and 46 mm frames S PR-Zb-xxx-YY Where "Z" is either A, E, P or X; "b" can be blank, 17, 18, 19, 20, 21, or 22; and "YY" can be blank, BILK, COM, C-AC, D-AC, E-AC, BLK-E-AC, G-AC, BLK-C-AC, or BLK-D-AC Sunspark modules with 40 mm frames SYY-xxxZ-A Where "YY" can be_MX or ST, and "Z" can be M, MB, M3, M313, P or W; and "A" can be 60 or 72 Suntech Modules with 35, 40 and 50mm frames STPxxxy-zz/aa Where "y" is blank or S; and "zz" can be 20, 24, A60 or A72U; and "aa" can be Vd, Vem, Vfw, Vfh, Wdb, Wde, Wd, or Wfhb i Talesun modules with 30, 35 and 40mm frames TA6yZZaaxxx-b Where "A" can be D or P, "y" can be blank, F, G, H, I or L; "ZZ" can be 60 or 72; "aa" can be M, M(H), or P; and "b" can be blank, B, T, or (H) Tesla modules with 40 mm frames TxxxY Where "Y" can be H or S �I Trina Modules with 30, 35, 40 and 46mm frames TSM-xxxYYZZ Where "YY" can be DD05, DD06, DD14, DE14, DE15, DE15V, DEG15, DEG15VC, DE19, DEG19C.20, DE06X, PA05, PC05, PD05, PD06, PA14, PC14, PD14, PE14, or PE15 ; and "ZZ" can be blank, .05, .05(11), .08, .10, .18, .08D, .18D, 0.82, .002, .005, 055, 08S, .20(11), A, A.05, A.08, A.10, A.18, (1)), A(II), A.05(11), A.08(11), A.082(II), A.10(11), A.18(11), H. H(II), H.05(11), H,08(11), HC20(11), HC.20(11), M, M(I1), M,05(11), MC.20(II) URE modules with 35 mm frames DyZxxxaa Where "D" can be D or F, "y" can be A, 6 or T, "Z" can be K or M; and "aa" can be H3A, H4A, HBA, E7G-BB, E8G or EBG-BB Vikram solar modules with 40 mm frames Vikram VSyy.ZZ.AAA,bb Where "yy" can be M, P, MBB, MH, MS, MHBB, or PBB; "ZZ" can be 60 or 72; "AAA" is the module power rating; and "bb" can be 03, 04 or 05 VSUN modules with 35 and 40 mm frames VSUN VSUNxxx-YYz-aa Where "YY" can be 60, 72,120, or 144; "z" can be M, P, MH, PH, or BMH; and "aa" can be blank, BB, BW, or DG Waaree modules with 40mm frames Waaree WSyy-xxx where "yy" can be blank, M, or MB Winaico modules with 35 and 40 mm frames Winaico Wsy-xxxZa Where "y" can be either P or T; 'Z" can be either M, P or MX; and "a" can be blank or 6 Yingli modules with 35 and 40 mm frames Yingli YLxxxZ-yy Where "Z" can be D or P; "yy" can be 29b, 30b, 34d, 35b, 36b or 40d ZN Shine modules with 35mm frames ZN Shine ZXMY AAA-xxx/M Where "Y" can be 6 or 7, "AAA" can be 72, NH120, NH144 or SHDB144 RT-MINI is suitable for mounting any rail system with a conventional L-Foot. Dual bolt design: M8 or 5118" for L-Foot & 114" for E M C ril 0Z4 Installation Manual 1CC ICC ESR 3575 Easy tapping 1/4" Hex Bolt screw guide upper channel Flat lip for M8 or 5116" PV Cable Hex Bolt clips 1 Oa bottom channel ''MODULE COMPATIBILITY - JA Solar modules with 30, 35, 40 and 45 mm frames JAyyzz-bbww-xxx/aa JA Solar Where "yy" can be M, P, M6 or P6; "zz" can be blank, (K), (L), (R), (V), (BK), (FA), (TG), (FA)(R), (L)(BK), (L) (TG), (R)(BK), (R)(TG), (V)(BK), (BK)(TG), or (L)(BK)(TG); "bb" can be 48, 60, 66, 72 or 78; "ww" can be 1309, D10, D20, D30, S01, 802, 503, 506, 509, 510, 512, S20 or 530; and "aa" can be BP, MB, MR, SI, SC, PR, 3BB, 41313, 41313/RE, 51313 Jinko modules with 35 and 40 mm frames J KMYxxxZZ-aa Jinko Where "Y" can either be blank or S; "ZZ" can be M, P, or PP; and "aa" can be blank, 60, 60B, 60H, 60L, 6013L, 60HL, 601-16, 60HBL, 6HBL-EP, 60-J4, 606-J4, 6013-EP, 60(Plus), 60-V, 60-MX, 6RL3, 6RL3-13, 6TL3-B, 7RL3-V, 71RL3-TV, 72, 72B, 72-J4, 7213,14, 72(Plus), 72-V, 72H-V, 72L-V, 72HL-V, 721-11-44, 72HL4- ~ ~� TV, 72-MX, 72H-BDVP, 72HL-TV, or 72HL-V MX3 Kyocera Modules with 46mm frames KYxxxZZ-AA Kyocera Where "Y" can be D or U; "ZZ" can be blank, GX, or SX; and "AA" can be LPU, LFU, UPU, LPS, LPB, LFB, LFBS, LF82, LP132, 3AC, 313C, 3FC, 4AC, 46C, 4FC, 4UC, SAC, 58C, SFC, 5UC, 613C, 6FC, BBC, 6MCA, or 1 6MPA LG modules with 35, 40, and 46 mm frames LGxxxYaZ-bb LG Where "Y" can be A, E, M, N, Q, S; "a" can be A, 1, 2 or 3 "Z" can be C, K, T, or W; and "bb" can be A3, A5, µ A6, B3, 136, E6, G3, G4, J5, K4, 1-5, N5, V5 or V6 Longi modules with 30, 35 and 40 mm frames Longi LRa-YYZZ-xxxM Where "a" can be 4, 5 or 6; "YY" can be blank, 60 or 72; and "ZZ" can be blank, BK, BP, HV, PB, PE, PH, HBD, HIB, HIH, HPB, HPH, or HIED Mission Solar modules with 33 and 40 mm frames Mission Solar MSEbbxxxZZaa Where "bb" can be blank or 60A; "ZZ" can be blank, MM, SE, SO, SQ , SR, SX or TS; and "aa" can be blank, 1J, 4J, 4S, 5K, 5R, 5T, 60, 6J, 6S, 6W, 6Z, 8K, 8T, or 9S Mitsubishi modules with 46 mm frames Mitsubishi PV-MYYxxxZZ Where "YY" can be LE or JE; and "ZZ" can be either HD, HD2, or FB Moltech IM and XS series modules with 40, 45, and 50 mm frames Next Energy Alliance modules with 35 and 40mm frames Next Energy Alliance yyNEA-xxxZZ where "yy" can be blank or US; "ZZ" can be M, MB or M-60 Neo Solar Power modules with 35 mm frames Neo Solar Power D6YxxxZZaa Where "Y" can be M or P; "ZZ" can be 133A, 134A, E3A, E4A, H3A, H4A; and "aa" can be blank, (TF), ME or ME (TF) Panasonic modules with 35 and 40 mm frames Panasonic (HIT) VBHNxxxYYzzA Where "YY" can be either KA, RA, SA or ZA; "zz" can be either 01, 02, 03, 04, 06, 0613, 11, 1113, 15, 1513, 16, 168, 17, or 18; and "A" can be blank, E, G, or N Panasonic modules with 30 mm frames - Panasonic (EverVolt) EVPVxxxA Where "A" can be blank or K Peimar modules with 40 mm frames Peimar SbxxxYzz Where "b" can be G, M or P 'Y" can be M or P; and "zz" can be blank, (BF) or (FB) Philadelphia modules with 35 and 40 mm frames Philadelphia Solar PS-YzzAA-xxx Where "Y can be M or P; "zz" can be 60 or 72; and "AA" can be blank or (BF) Phono Solar modules with 35, 40, and 45 mm frames Phone Solar PSxxxY-ZZ/A Where "Y" can be M, M1, MH, M1 H, M4, M4H or P; "ZZ" can be 20 or 24; and "A" can be F, T, U, UH, or TH 2021 IRONR D FLUSH MOUNT INSTALLATION MANUAL - 23 FLUSH MOUNT w ---------- IRONRIDGE a The Flush Mount System may be used to ground and/or mount a PV module complying with UL 2703 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instructions. Unless otherwise noted, "xxx" refers to the module power rating and both black and silver frames are included in the certification. Adani modules with 35 and 40mm frames Adani ASX-Y-ZZ-xxx Where "X" can be B, M or P, "Y" can be 6 or 7, and "ZZ" can be blank, PERC, B-PERC, arAB-PERC Amerisolar modules with 35, 40 and 50 mm frames Amerisolar . AS-bYxxxZ Where "b" can be 5 or 6; "Y" can be M, R M27, P27, M30, or P300and "Z" can be blank, W or WB Aptos modules with 35 and 40 mm frames Aptos Solar DNA-yy-zzaa-xxx Where "yy" can be 120 or 144; "zz" can be MF or BF; and "aa" can be 23 or 26 Astronergy modules with 30, 35, 40, and 45 mm frames Astronergy Solar aaSMbbyyC/zz-xxx "aa" Where can be CH or A; "bb" can be 60, 66, or 72; "yy" can be blank, 10 or 12; "C" can M, P, M(BL), M-HC, M(BL)-HC, P-HC, M(DG), or M(DGT); and "zz" can be blank, HV, F-B, or F-8H ASUN modules with 35 and 40 mm frames AS U N AS U N-xxx-YYZZ-aa Where "YY" can be 60 or 72; "ZZ" can be M,or MH5; and "aa" can be blank or BB Auxin modules with 40 mm frames Auxin AXN6y6zAxxx Where "y" can be M or P; "z" can be 08, 09, 10, 11, or 12; and "A" can be F or T Axitec Modules with 30, 35 and 40 mm framesy Axitec AC-xxxY/aaZZb Where "Y" can be M, P, MB or MH; "aa" can be blank, 125- or 156-; "ZZ" can be 54, 60, 72, 120, or 144; "b" can be S, X, V, VB, XV, or MX Boviet modules with 35 and 40mm frames Boviet BVMZZaaYY-xxxBcc Where "ZZ" can be 66 or 76; "aa" can be 9, 10 or 12; "YY" is M or P; and "B" can be blank, L or S; and "cc" can be blank, H, H-BF, H-BF-DG, H-HC, H-HC-BF, H-HC-BF-DG, HC-BF or HC-BF-DG BYD modules with 35 mm frames BYD BYDxxxAY-ZZ Where "A" can be M6, P6, MH or PH; "Y" can be C or K; and "ZZ" can be 30 or 36 Canadian Solar modules with 30, 32, 35 and 40 mm frames Canadian Solar CSbY-xxxZ Where "b" can be 1, 3 or 6; "Y" can be H, K, L, N, P, U, V, W, X or Y; and "Z" can be M, P, MS, PX , M-SD, i P-AG, P-SD, MB-AG, PB-AG, MS -AG, or MS -SD -� C fainTeed modules with 35 and 40 frames CertainTeed i CTxxxYZZ-AA Where "Y" can be M, P, or HC; "ZZ" can be 00, 01, 10, or 11; and "AA" can be 01, 02, 03, 04 or 06 Csun modules with 35 and 40 mm frames CSU N YYxxx-zzAbb Where "YY" is CSUN or SST; "zz" is blank, 60, or 72; and "A" is blank, P, M or MM; IV is blank, BB, 51313, BW,_or ROOF Dehui modules with 30, 35 and 40mm frames Dehui D H-MYYYZ-xxx Where "YYY" can be 760, 772, 860, 872; and "Z" can be 8, F or W FLUSH MOUNT INSTALLATION MANUAL • 21 UL 2703 LISTED cO(T�_us #5003807 Interteik Conforms to STD UL 2703 (2015) Standard for Safety First Edition: Mounting Systems, Mounting Devices, Clamping/ Retention Devices, and Ground Lugs for Use with Flat -Plate Photovoltaic Modules and Panels • Max Overcurrent Protective Device (OCPD) Rating: 40A • Max Module Size: 30.5 ft' • Module Orientation: Portrait or Landscape • System Design Load Rating: 10 PSF downward, 5 PSF upward, 5 PSF lateral • Actual system structural capacity including spans and cantilevers are defined by PE stamped certification letters. • CAMO Specific Design Load rating: 50 PSF downward, 50 PSF upward, 15 PSF lateral Certified to CSA STD LTR AE-001-2012 Photovoltaic Module Racking Systems • Load Rating: 2400 PA [50 PSF] • Max Framed Module Size: 25.6 ftz • Max Frameless Module Size: 21.5 ft2 CLASS A SYSTEM FIRE RATING PER UL 2703 • Any Roof Slope with Module Types 1, 2, 3, 13, 19, 25 & 29. • Any module -to -roof gap is permitted, with no perimeter guarding required. This rating is applicable with any third -party attachment. • Class A rated PV systems can be installed on Class A, B, and C roofs without affecting the roof fire rating. WATER SEAL RATINGS: • UL 441 (Flashfoot2, L-Mount, Flashvue, All Tile Hook, Knockout Tile) • TAS 100(A)-95 (Flashfoot2, All Tile Hook, Knockout Tile, Flashvue, Qbase, L-Mount) • Tested and evaluated without sealant. • Any roofing manufacturer approved sealant is allowed. Ratings applicable for roof slopes between 2:12 and 12:12 STRUCTURAL CERTIFICATION • Designed and Certified for Compliance with the International Building Code & ASCE/SEI-7 FLORIDA PRODUCT APPROVAL #FL29843 • Conforms to TAS202, TAS100(A) • Approved for installation both inside and outside High Velocity Hurricane Zones (HVHZ) • Allowable design pressure up to +1001-100 PSF • Additional details and full list of approved components can be found here. MAR Product markings are located on the Grounding Lug bolt head. ® 2021 IRONRIDGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL - 2 Use IronRidge's Microinverter Kit to bond compatible microinverters and power optimizers to the racking s� Insert Microinverter Kit T-bolt into top rail slot. Place compatible microinverter or power optimizer into position and tighten hex nut to 80 in-lbs. ➢ If installing In areas with ground snow loads greater than 40 psf, install MLPE devices directly next to module frame edge COMPATIBLE PRODUCTS Enphase M250-72, 250-60, M215-60, C250-72, S230, S280, IQ 6,10 6+, IQ 107, IQ 7A, IQ 7+, IQ7 PD, IQ 7X, Q Aggregator Dart n MIG240, MIG300, G320, G640 Solar Edge M1600, P300, P320, P340, P370, P400, P401, P405, P485, P505, P600, P700, P730, P800p, P800s, P801, P850, P860, P950, P960, P1100 SMA RoofCommKit-P2-US, TS4-R Module Retrofit Kits (TS4-RS, TS4-R-0, TS4-R-F) r Tigo Access Point (TAP) TS4-R-X (where X can be F, M, O, or S) TS4-R-X-DUO (where X can be M, O, or S) TS4-A-X (where X can be F, 2F, O, O-DUO, or S) AP Systems QS1, YC600 ➢ Remove Grounding Washer on AP Systems QS1 and YC600 inverters before Installing to XR rails. ➢ Remove the Stainless Steel Clip on Tigo-"A" MLPE Devices before attaching to XR rails. n Use the number of IronRldge Micrainverter kits allowed by the MLPE mounting flange. Some will require 1 kit and others 2 kits. One Microinverter Kit Required (60 in-Itis) On AP systems equipment, / remove Grounding Washer T:va .izrainverter Kits Required (80 in4s) IronRidge systems using approved Enphase products or SunPower modules eliminate the need for lay -in lugs and field installed equipment grounding conductors (EGC). This solution meets the requirements of UL 2703 for bonding and grounding and is included in this listing. COMPATIBLE PRODUCTS Sunaower Modules with model identifier Ab-xxx-YY and InvislMount (G5) 46mm frame; where "A" is either E, or X; "b" can be 17, 18, 19, 20, 21, or 22; and "YY" can be C-AC, D-AC, BLK-C-AC, or ELK-D-AC. E_te Microinverters M250-72, M250-60, M215-60, C250-72, and Engage cables ETXX-240, ETXX-208, ETXX-277. P A minimum of two inverters mounted to the same rail and connected to the same Engage cable are required ➢ The microinverters or SunpowerAC modules must be used with a maximum 20 A branch rated overcurrent protection device (OCPD). ➢ If an AC module is removed from a circuit for maintenance, you must first disconnect AC power and then install a temporary EGC to bridge the gap by inserting an AC extension cable (or via other NEC -compliant means), In order to maintain effective ground continuity to subsequent modules. COMPO PRE -INSTALLATION ❑ Verify module compatibility. See Page 21 for info. TOOLS REQUIRED '7 Cordless Drill (non -impact) ❑ Impact Driver (for lag bolts) ❑ Torque Wrench (0-250 in-Ibs) ❑ 7116" Socket C1 1I2" Socket rl 9l16" Socket ❑ 7/32" Drill bit ❑ 118" Drill bit ❑ 114" Drill bit ❑ T30 Bit f J Channel Lock Pliers F1 #3 Phillips Bit ❑ Paddle Sit BONDING HARDWARE TORQUE VALUES Please refer to each attachment's individual section for full details on all torque values and instructions. ❑ Bonded Splice Screws (5116" Socket): 20 in-lbs ❑ Universal Fastening Object (7/16" Socket): 80 in-Ibs ❑ Rail Grounding Lug Nut (7116" Socket): 80 in-Ibs ❑ Module Grounding Lug Nut (7116" Socket): 60 in-Ibs C] Grounding Lug Terminal Screws (7/16" Socket): 20 in-Ibs ❑ Expansion Joint Nuts (7116" Socket): 80 in-Ibs r1 Microinverter Kit Nuts (7116" Socket): 80 in-Ibs f7 Frameless Module Kit Nuts (7116" Socket): 80 in-lbs ❑ 318" Bonding Hardware Nuts (7116" Socket): 250 in-Ibs COMPONENTS L — — XR Rail Bonded Splice BOSS UFO and Stopper CAMO Ironridge L-Foot and Sleeve QM L-Foot End Cap Rail Grounding Lug Module Grounding Lug 3 Microinverter Kit 318" Bonding 8" Bonding Jumper Hardware Single Use Only QM Classic Conduit QM Composition Expansion Joint Comp Mount Conduit Penetration r. QM Tile Conduit OM Tile Conduit Frameless Module Kit Mount Penetration D Unless otherwise noted, all components have been evaluated for multiple use. They can be uninstalled and reinstalled in the same QM OBOX Frameless or new location. End/Mid Clamp Wire Clip c3 - sFLUSH MOUNT INSTALLATtON C. NDUIT MOUNT Place conduit mounts along path of conduit. Lift shingle above mount location and insert flashing into position. Mark center for drilling, remove flashing and drill pilot hole with 1/8" bit. Clean area, fill hole with roofing manufacturer's approved sealant. Lift shingle and slide Conduit Mount into place. Prepare the lag bolt with sealing washer and pipe clamp (not included). Insert lag through hole in block and drill with 7/16" socket until block is tight. ;� Install mounts as required to support conduit across the roof. fl For additional details refer to the full QM Jn.�;t aLlati4n.M nual. Remove the tile that the mount will be installed on, and the tiles in the course above it. Lift the bottom of the tile and slide the bottom clamp over the bottom edge of the tile. Insert the 4" tap bolt through the slot into the threaded hole and use a 7/16" socket to thread the screw. Tighten until the top clamp hook end unbends and forms a 90 degree angle with the tile. Use the Cap Screw (included) to attach your pipe clamp (not included) to bottom clamp. Insert conduit and tighten with 7/16" socket. > The clamp is reversible, use the wider hook end on tile greater than 1" thick and the thinner hook end on tiles less than 1" thick. The installation process is the same on curved tile, make sure that the Conduit Mount is installed on the crown{high point} of the tile. Install mounts as required to support conduit across the roof. D For additional details refer to the full QM Installation Manual. a FLUSH MOUNT INSTALLATION MANUAL - 17 Grounding Lugs Only one Grounding Lug (Rail or Module) required per continuous subarray, regardless of subarray size (Unless frameless modules are used, see Page 2Q). ➢ Grounding Lugs are intended to for use with one solid or stranded copper wire, conductor size 10.4 AWG. Rail Grounding Lug Insert T-bolt in Top Rail slot and torque Hex Nut to 80 in-Ibs. Install a minimum 10 AWG solid copper or stranded grounding wire. Torque terminal screw to 20 in-lbs. ➢ Module Grounding Lugs can be installed anywhere along the Rail and in either orientation shown. Module Grounding Lug Insert Bolt through Manufacturer approved grounding location and torque Hex nut to 60 in-Ibs. One Module Grounding Lug may be installed to one module per row. Install a minimum 10 AWG solid copper or stranded grounding wire. Torque terminal screw to 20 in-Ibs. ➢ If using Enphase microinverters or Sunpower AC modules, Grounding Lugs may not be needed. See Page 19 for more info. P Refer to module manufactuer for mounting location and instructions. A. SECURE FIRST END Place first module in position on rails, a minimum of 1" from rail ends. Snap Stopper Sleeves onto UFO. Fasten module to rail using the UFO, ensuring that the UFO is hooked over the top of the module. Torque to 80 in-Ibs. ➢ Ensure rails are square before placing modules. ➢ Hold Stopper Sleeves on end while torquing to prevent rotation. ➢ If using CAMO instead of UFO + Stopper Sleeve, refer to P for CAMO installation procedure. B. SECURE NEXT MODULES Place UFO into each rail, placing them flush against first module. Slide second module against UFO. Torque to 80 in-Ibs. Repeat for each following module. ➢ When reinstalling UFO, move modules a minimum of 1116" so UFOs are in contact with a new section of module frame. ➢ When UFOs are loosened and re -tightened, ensure UFO T-bolt bottoms out in rail channel before re -torquing UFO to achieve full engagement between T-bolt and rail. ➢ If using Wire Clips, refer to Page 18. C. SECURE LAST END Place last module in position on rails, a minimum of 1" from rail ends. Snap Stopper Sleeves onto UFO. Secure UFO Clamps on rails, ensuring they are hooked over top of module. Torque to 80 in-ibs. ➢ Hold Stopper Sleeves on end while torquing to prevent rotation. ➢ Repeat all steps for each following row of modules, leaving a minimum 318" gap between rows P. If using CAMO instead of UFO + Stopper Sleeve, refer to Page S for CAMO installation procedure. Rail Grounding Lug Terminal Screw rilr� 1: Its �IaI I�I�II ■rI Ii IJ Module Grounding Lug A 1" FI Rail --^ — Hex Nut 180 in-Ibs) ;iiie tl Use with one solid or stranded copper wire, conductor size 10.4AWO. VOLT Terminal Screw (20 In•lbs) ❑TAR WASHER r.I NIMIN[. LNG Hex Head N �'- - _ OE Nut l50 in-Ibsy C—_�_`Y1 UFO (80 in-lbs) 2021 IRONRIDGE, INC. VERSION 13 MW FLASH MOUNT INSTALLATION MANUAL -& Flat Roof Attachment can be used with an L-foot for flush mounting modules on low sloped roofs. Mark locations for Flat Roof Attachment. Screws should be installed symmetrically to each other. If using a membrane flashing, remove the silicone washer's protective liner prior to attaching the membrane. Attach L-foot with washers and 3/8" hardware torqued to 250 in-Ibs (21 ft-Ibs). Seal attachment and/or membrane per roofing manufacturer's requirements. D Type, size, and quantity of roof screws to be specified by Structural Engineer. Fastener size not to exceed #15. fl Membrane flashing available for TPO, PVC, and KEE roofs. Ensure membrane flashing is compatible with existing roofing material. lo If membrane flashing is not used, only washer on top of L-Foot is required. n Standalone Flat Roof Attachment,Manual available on website. Locate the desired mount placement over a rafter. Using the base as a template, mark the two penetration points. Drill two 7/32" pilot holes, back fill with roofing manufacturers' approved sealant. Place the grade-8 hex bolt in the bottom of the base and screw the Post. Attach L-Foot on Standoff with hardware. Torque to 174 in-Ibs (14.5 ft-Ibs). Attach rail to L-Foot with Bonding Hardware and torque to 250 in-Ibs (21 ft-lbs). The mount can be flashed with available 9", 12" or 18" aluminum flashings, pitch pocket or curb, or with a membrane cone flashing. If using a membrane flashing utilize the services of a qualified roofer fl For additional details refer to the full QM Installation Manual. Locate the desired mount placement over a roofing seam, make sure block is fully seated on metal seam. Torque Set Screws to 150 in-lbs(12.5 ft-Ibs) using 3116" Hex Drive, alternate driving each bolt till required torque is met. Slide Hex Bolt into slot and to desired position. Place rail attachment bracket over Hex Bolt and secure with Flange Nut, torque Flange Nut to 150 in-lbs(12.5 ft-Ibs) using 1/2" socket. > For additional details refer to the full QM I.n�S;'1t�314st anual. (NEED LINK) to Certification of Lynx caimp includes Bonding to both painted and galvalume metal roofs. Flat Roof Attachment L-F at Hardware Membrane Flat Roof Flashing Attachment 250 in-Ibs V 00�C Screws provided b P y others. Shown for iafrence Slide hardware in to desired position Mk Torque to 174 in-Ibs T621 IR ERS1Q FLUSH MOUNT INSTALLATION MANUAL . 15 Expansion Joints are required every 100' of continuous rail to allow for thermal expansion and contraction of the system. Do not install modules over expansion joints, either Classic Splice or BOSS. Classic Splice Insert Classic Splice 6" into first rail and secure with two self -drilling screws, spacing them approximately 1" apart and tightening to 20 in-ibs. Assemble and secure Grounding Strap 318" from rail end. Slide second rail over Classic Splice leaving 1" gap between rails. Attach other end of Grounding Strap with hardware and torque hex nuts to 80 in-Ibs. fl Remaining Bonded Splice screws are not used with Expansion. G Only one Grounding Strap is required per break in row of modules. BOSS Insert BOSS into first Rail up to the Alignment Circle, Slide second Rail over BOSS to the second Alignment Circle, leaving a 1" gap between the Rails. There must be a 1" of space between the edge of the Rail and the edge of the panel to allow proper installation of the UFO and Stopper Sleeve. r No Modules Over Gap No Modules Over Gap Torque to 80 in-Ibs 318" from Rail End One Bonding Strap Per Break In Array No Bonding Strap required for BOSS 2021 IRONRIDGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL -8 a dr Remove tile and mark rafter. Position base over rafter, adjust arm if necessary and torque hardware to 132 in-Ibs (11 ft-Ibs). Use base as guide to drill 114" pilot holes, back fill with roofing manufacturer's approved sealant, then insert lag bolts and tighten until fully seated. Replace tiles and notch as necessary to ensure proper fit. Attach rails to either side of slot using Bonding Hardware and torque to 250 in-Ibs (21-ft-Ibs). D Position arm near the center of valley for curved tiles. 9 Position arm away from seam of joining flat tiles. fl Ensure top of hook does not extend above rail. a Standalone All Tile Hook manual available on website. Remove the and mark rafter, use Base Plate to mark two holes on rafter. Drill two 7132" pilot holes and back fill with roofing manufacturers' approved sealant. Use 112" socket to drive lag into place. Slide hook into place and adjust to desired position. Drive self -tapping screw using a #3 Phillips bit to lock hook in place. Clean underlayment and apply a bead of sealant compatible with roofing manufacturer, install flashing over mount. Fasten sub - flashing to deck with one roofing nail in each corner. Waterproof at underlayment level according to roofing manufacturers' instructions and the Tile Roofing Industry Alliance guidelines. Cut clearance notch in the weather guard of tile as needed or utilize QM Tile Replacement Flashings. Attach rails to either side of slot using Bonding Hardware and torque to 250 in-Ibs (21-ft-Ibs). �- Position arm near the center of valley for curved tiles. ;o- Position arm away from seam of joining flat tiles. I-, Ensure top of hook does not extend above rail. P For additional details refer to the full 4M Installation Manual. yT C1 to 2in-Ibs / A K� en Until , BY Seated 10 ZI 03021 IRONRIdGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUMEMP AL -1 , L"I Locate roof rafters and mark locations on roof. Drill 114" pilot holes perpendicular to the roof and back fill with roofing manufacturers' approved sealant. Slide flashing between 1st and 2nd course of shingles, ensuring both that the flashing reaches under the 3rd shingle course and doesn't overhang the downhill shingle course. Line up with pilot hole and insert supplied lag bolt with washer through flashing. With a 7116" Socket fully seat lag bolt. Place Cap onto flashing in desired orientation for EIW or NIS rails and rotate 180 degrees until it locks into place. G Rail can be installed on either side of FlashFoot2 Cap. D For additional details refer to the full FlashFoot2 Installation Manual Locate rafters and snap vertical and horizontal lines to mark locations of flashings. Drill 114" pilot holes, then backfili with an approved sealant. Slide flashing between 1st and 2nd course of shingles, ensuring both that the flashing reaches under the 3rd shingle course and doesn't overhang the downhill shingle course. Line up pilot hole with View Port. Press Grip Cap onto flashing in desired orientation for EIW or NIS rails. Insert Lag Bolt vwrth mechanically bonded washer through flashing, With a 7116" Socket drive Lag Bolt until fully seated. FlashVue is now installed and ready for IronRidge XR Rails. Attach rails to either side of the open slot using bonding hardware. Level rail at desired height, then torque to 250 in-lbs (21 ft-lbs). When installing GripCap+ on roofs with undulations greater than 1 inch, install GripCap+ in low points across the array as required. For additional details refer to the full FlashVue Installation Manual. For additional details on the GripCap+ refer to the full GripCap+ Installation Manual. OL k ,Torque to 250 In-lbs i _ I 10 2021 IRONRIDGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL -10 P'fl51T10N SHINGLE Locate roof rafters and mark locations on roof. Drill 7/32"(Lag) or 1/8"(ST) pilot holes perpendicular to the roof and back fill with roofing manufacturers' approved sealant. Slide flashing between 1 st and 2nd course of shingles, ensuring both that the flashing reaches under the 3rd shingle course and doesn't overhang the downhill shingle course. Place L-foot on flute and rotate into desired position. Prepare lag bolt or structural screw with sealing washer. Use 1/2" socket to drive prepared lag bolt through L-foot until fully seated and L-foot can no longer rotate easily. Torque Nut to 166 in-Ibs (13 ft-Ibs) for ST. Attach rail to L-Foot with Bonding Hardware and torque to 250 in-Ibs (21 ft-Ibs). G Structural screw can be driven with T-30 hex head bit. D For additional details refer to the full QM .Installation Manual. Locate roof rafters and mark locations on roof. Align QBase vertical holes over center rafter and mark. Drill two pilot holes with 7/32" drill bit, perpendicular to roof and back fill with roofing manufacturers' approved sealant. Set grade 8 cap screw through bottom of QBase, place QBase over drilled holes and secure lags. Screw Post to QBase. Proceed with roofing up until the flashing should be installed. Install flashing over mount. Allow roofing to proceed to the next course. Apply sealant where post and flashing meet, install EPDM counter flashing collar. Attach L-Foot on Standoff with hardware. Torque to 174 in-Ibs (14.5 ft-Ibs). Attach rail to L-Foot with Bonding Hardware and torque to 250 in-Ibs (21 ft-Ibs). P- For additional details refer to the full QM Installation Manual. Locate roof rafters and mark locations on roof. Drill 7/32" pilot holes perpendicular to the roof and back fill with roofing manufacturers' approved sealant. Slide flashing between 1st and 2nd course of shingles, ensuring both that the flashing reaches under the 3rd shingle course and doesn't overhang the downhill shingle course. Prepare Hanger Bolt with Hex Nut and Sealing Washer, insert into hole and using 1/2" socket drive hanger bolt until fully seated and QBlock stops rotating easily. Insert EPDM rubber washer over hanger bolt into block, using Rack Kit hardware secure L-Foot to the mount. Torque to 156 in-Ibs (13 ft-Ibs). Attach rail to L-Foot with Bonding Hardware and torque to 250 in-Ibs (21 ft-lbs). P For additional details refer to the full QM .Installation .Manual. O T us to 4 in-Ibs i j� i M= 21 IRONRIDGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL 11 Remove tile and mark rafter. Use base as guide to drill 1/4" pilot hole and fill with roofing manufacturer's approved sealant. Insert lag bolt with bonded washer through base and drive until fully seated. Insert Tile Replacement Flashing, lower onto base and apply pressure over the threaded post until it dimples the flashing. Place L-Foot over dimple and tap with hammer to punch threaded post through the flashing. Ensure punched pieces of flashing are cleared away. Form flashing as needed to sit flush with surrounding tiles, position L-Foot in desired orientation and torque hardware to 132 in-Ibs (11 ft-Ibs). Attach rail to L-Foot with Bonding Hardware and torque to 250 in-Ibs (21 ft-Ibs). D Base can be installed in any orientation relative to rafter. D Ensure L-Foot does not extend above rail. D If deck level flashing is required, approved flashing methods include user supplied adhesive backed flexible flashing. D Standalone Knockout Tile manual, available on website. QM TILE REPLA _ f i Remove tile and mark rafter. Measure up 8 3/4" from the adjacent tiles and mark horizontal across rafter. Align baseplate over rafter so that the lag holes align with the post groove. The orientation of the plate can be adjusted cross roof, mark location of lag holes on the roof. Drill two 1/8" Pilot holes and back fill with roofing manufacturers' approved sealant. Waterproof at underlayment level according to roofing manufacturers' instructions and the Tile Roofing Industry Alliance guidelines. Use T-30 Torx bit to lag base into position, Insert Grade 8 Serrated Flange Bolt into bottom of the Post, slide Post into Base channel. Line up post with the hole in the Tile Replacement Flashing. Leave loose for adjustments. Place Tile Replacement Flashing over the Post and Mount, allowing the flashing to properly interlock with surrounding tiles. Secure Post by tightening with channel lock pliers. Replace all tiles. Apply a bead of sealant where the post meets the flashing, slip EPDM collar over post and down to flashing. Attach L-Foot on Standoff with hardware. Torque to 174 in-Ibs (14.5 ft-Ibs), Attach rail to L-Foot with Bonding Hardware and torque to 250 in-Ibs (21 ft-Ibs). D If deck level flashing is required, approved flashing methods include user supplied adhesive backed flexible flashing. a For additional details refer to the full OM lo�stp�ta$p�„Ma_nuail. Orient Base to desired pos€Flan TVghten until fully seated /fmpl. lap Withm vHam! ! .• �. \N. Torque.to� Torque to 25E1 in-{ cif Y 137in.lbs c •..y m. 2021 IRONRIaGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL -12 *One Module Grounding Lug or Rail Grounding lug is required per row of a system. ** The use of the 8" Bonding Jumper eliminates the need for row to row bonding. A minimum of one grounding lug per continuous array is required for earth ground. Grounding Lugs and wire are not required in systems using certain Enphase microinverters or certain Sunpower modules. Equipment grounding is achieved with the Engage cable for Enphase or the AC module cable system for Sunpower via their integrated EGC. 2021 IRONRIDGE. INC. VERSION 3.3 FLUSH MO Remove the and mark rafter. Measure up 6 5/8" from bottom of tiles and mark horizontally. Align QBase over rafter center and drill two 7132" pilot holes, back fill with roofing manufacturers' approved sealant. Place grade-8 Cap Screw under QBase, lag QBase into rafter location. Install Sub -flashing, waterproof at underlayment level according to roofing manufacturers' instructions and the Tile Roofing Industry Alliance guidelines. Cut the with diamond blade to allow post to pass through. Place tile in position and then install Post. Install 18" x18" flashing, pre -bent to follow the contour of the the as required. Apply sealant where Post and Flashing meet and install EPDM counter flashing. Attach L-Foot on Standoff with hardware. Torque to 174 in-Ibs (14.5 ft-Ibs). Attach rails to L-Foot using Bonding Hardware and torque to 250 in-Ibs (21-ft- lbs). For additional details refer to the full QM Installation Manual. ADDITIONAL ROOF TYPES •CLASS Locate roof rafters and mark locations on roof, remove shakes directly above mount if needed to expose felt paper. Level out installation area and location installation point, mark. Drill 7132" pilot hole, back fill with roofing manufacturers' approved sealant. Prepare Hanger Bolt with Hex Nut and Sealing washer, insert into QBlock hole and drive into rafter until fully seated and the QBlock no longer swivels easily. Insert EPDM washer over hanger bolt and then install L-Foot in desired orientation and torque hardware to 132 in-lbs (11 ft-Ibs). Attach rail to L-Foot with Bonding Hardware and torque to 250 in-Ibs (21 ft-Ibs). fl For additional details refer to the full QM Installation Manual. The QM QBase can be used to install on multiple roofing types with different installation methods. For instructions on installing the QBase on Slate refer to the full OM Installation Manual. fl For instructions on installing the QBase on Shake refer to the full QM Installation Manual. D For instructions on installing the QBase on Metal Shingle refer to the full QM Installation Manual. Torque to 174 In.Ib$ 2021 IRONRIOGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL -14 A. SLIDE INTO RAIL Slide CAMO into rail channel far enough to clear the module frame. CAMO requires 6" of clearance from end of rail. A --, C. PULL TOWARDS END Pull CAMO towards rail ends, at 45 degree angle, so the bonding bolt contacts the module flange edge. C 46 �ilr B. PLACE MODULE Place module on rails (module cells not shown for clarity). When installing CAMO the module can overhang the rail no more than 114". D. SECURE TO FRAME Rotate handle with an upwards motion until CAMO snaps into rail channel. Ensure CAMO bonding pins are fully seated on top of module frame. FRAME COMPATIBILITY CAMO has been tested or evaluated with all modules listed in the Module Compatibility section having frames within the referenced Modulr. Glcm/Cek dimensions. Be sure the specific module being used meets the dimension requirements. a For installations with Hanwha Q CELLS modules with 32 mm frame heights, Foame CamputtAty the maximum ground snow is 45 PSF (33 PSF module pressure). r= rs- o1mm a CAMP is only compatable with Canadian Solar module CS1YxxxMS. "xxx" Y refers to the module power rating I ` 8" Bonding Jumper is an electrical bonding jumper that can be used on the Flush Mount System for row to row bonding; making the module frames the medium for the equipment ground path. C Bonding jumper is pushed onto the bottom flange of the module. New jumpers should be used if re -installation of jumper is required. D Supports bottom flange thicknesses from 1.2mm to 3.1 mm. %UM-%N MANt1AL - 7 CONDUIT PENETRAT'I RATWXF.LjP IN�LE Mark a drill point so that the flashing reaches up to the 3rd shingle course. Drill your conduit hole next to the rafter so you can secure the conduit below the roof surface. Cut shingle and remove nails as needed to center the drilled hole and flashing hole. Apply roofing manufacturer's approved sealant on the underside of the flashing in a Upside down U and to top of flashing. Under the 3rd course and through the second course secure flashing with 2 roofing nails, apply sealant over the nail heads. Cut EPDM collar to appropriate size. Apply a bead of sealant compatible with the roofing manufacturer and EPDM rubber to anywhere the EPDM collar contacts. D Be sure to secure conduit to rafters below the roof surface per local building codes and NEC code requirements. Cut EPDM collar to appropriate size using the sizing chart in the installation manual, approved for 1/2" to 1" EMT. a For additional details refer to the full QM Installation Manual. Q DUIT PEN TILE Drill your conduit hole next to the rafter so that you can secure the conduit below the roof surface. Apply roofing manufacturer approve sealant to the underside of the sub -flashing in the shape of an upside down U. Clear away any dust and debris to install sub -flashing. Waterproof at under laminate level according to roofing manufacturer instructions and Tile Roofing Institute Guidelines. Under the top layer of felt, secure the sub -flashing with two roofing nails. Cut EPDM collar to appropriate size. Apply a bead of sealant compatible with the roofing manufacturer and EPDM rubber to anywhere the EPDM collar contacts. With a diamond blade cut tile to allow conduit to pass through, replace all tiles. Bend the flashing to follow the contour of the tiles. Place flashing over the conduit and tuck up under the next course of tiles. Apply a bead of sealant compatible with the roofing manufacturer and EPDM rubber to anywhere the EPDM collar contacts. Slide collar onto conduit all the way down to the flashing. D Be sure to secure conduit to rafters below the roof surface per local building codes and NEC code requirements. D Cut EPDM collar to appropriate size using the sizing chart in the installation manual, approved for 1/2" to 1" EMT. fl For additional details refer to the full QM installation Manual. Nails under the third course Rafter after The general installation method for attachments is to locate a rafter, drill a pilot hole and install the attachment. For composition roof attachments installation instructions refer to page 10. For tile roof attachments refer to page 12. For low slope roof attachments refer to pace 14. When using approved third party attachments, refer to manufacturer's install instructions. Tested or evaluated third -party roof attachments: S-51 StandingSeamMetal Roof Clamps - Certification of metal roof clamps includes bonding to both painted and galvalume metal roofs. Tighten S-51 and S-51 Mini set screws to 130-150 in-Ibs (? 24 gauge) or 160-180 in-Ibs (22 gauge) roofs. Tighten S-51 M10 bolt to 240 in-Ibs or S-51 Mini M8 bolt to 160 in-Ibs, Use the following fastening guidelines for other 5.61 roof clamps: ProteaBracketr"" - firmly seat roof screws and tighten hinge bolt to 225 In-Ibs; RlbBracketTA° - firmly seat roof screws and tighten M8 bolt (M8-1.25 x 22mm sold separately) to 160 in-Ibs; and SolarFootTi" - firmly seat roof screws and tighten M8 flange nut to 160 in-Ibs. EcQEasLtn 9M913 Fasten F-1 An h A. CONNECT SPLICES _i I i I I I I I r I - I- -- - -- - -- - - - - -- r r Use Classic Splice or BOSS(Bonded Structural Splice), as needed, to join multiple sections of Rail. Classic Splice Insert Classic Splice 6" into first Rail and secure with two self -drilling screws, spacing them approximately 1" apart and tightening to 20 in-Ibs. Slide second Rail over Classic Splice and secure with two more self -drilling screws. ;� For Classic Splice, insert screws along the provided lines. Classic Splices may not be installed in the center 113rd of interior spans, or the outer 113 of end spans. n Screws can be inserted on front or back of rails. BOSS - Bonded SIruclUilj Splice Insert BOSS into first Rail up until the Stop Tab. Slide second Rail fully into place. fl Rows using Classic Splice or BOSS and exceeding 100 feet of Rail must use Expansion Joints. G Boss Splices may be installed in any location within a span. UFO and Bonding Hardware must be installed V away from the point where two Rails join together. B. PREPARE HARDWARE Slide square -headed bolts Into side -facing rail slot. Space out bolts to match attachment spacing. fl Tape ends of rail, to keep bolts from sliding out while moving. fl If using T-bolts, carry hardware onto roof and proceed. C. ATTACH RAILS Drop rail with hardware into roof attachment. Level rail at desired height, then torque to 250 in-Ibs. a Rail can face either upslope or downslope on roof. fl When using attachments with longer slots, do not Install Rail lower than the top of the L-Foot to avoid damage to modules. A Classic Torque to 20 In-Ihsy _ - Preload and Space Square Bolts C Torque to I 250 in-lba 01 Z071 lit " . - FLUSH MOUNT I . End Caps add a completed look and keep debris and pests from collecting inside rail. Firmly press End Cap onto rail end. D End Caps come in sets of left and right. Check that the proper amount of each has been provided. \�\ Wire Clips offer a simple wire management solution. Firmly press Wire Clip into top rail slot. Run electrical wire through open clip. Snap closed once all wires have been placed. The QBoxTM is a flashed junction box with Quick Mount PV patented Elevated Water Seal TechnologyTM, and provides a waterproof pass -through for conduit from the box enclosure to the attic. QBox comes equipped with fasteners to install to the roof deck, and fittings for optional through -the -deck conduit attachment. The QBox is designed to transition or combine up to two (2) strings of conductors utilizing user -supplied wiring components and water -tight fittings. For more information and full instructions please refer to full QMPV Installation Manual. D The CIBOX is only certified for use on composition shingle roofs. Diu (P2021 IRONRIDGE, INC. VERSION 3.3 FLUSFI MOUNT INSTALLATION MANUAL -1 - ��9. PRE -INSTALLATION ATTACHMENTS ❑ Verify module compatibility. See Page 21 for info. TOOLS REQUIRED J Cordless Drill (non -impact) O 1mpact Driver (for lag bolts) ❑ Torque Wrench (0-250 in-lbs) D 7116" Socket 0 112" Socket © 9116" Socket ❑ 7I32" Drill Bit ❑ 118" Drill Bit ❑ 114" Drill Bit 0 T30 Bit C7 Channel Lock Pliers ❑ #3 Phillips Bit 0 3/16" Hex Bit BONDING HARDWARE TORQUE VALUES Please refer to each attachment's individual section for full details on all torque values and instructions. ❑ 318" Bonding Hardware Nuts (7116" Socket): 250 in-Ibs ❑ All Tile Hook Carriage Bolts (7116" Socket): 132 in-lbs ❑ Flat Roof Attachment Nuts (9/16" Socket): 250 in-Ibs ❑ Lynx Set Screw (3116" Hex Drive): 150 in-Ibs ❑ Lynx Flange Nut (112" Socket): 150 in-Ibs If using previous version of Integrated Grounding Mid Clamps, End Clamps, Expansion Joints and for a list of approved 3rd party components please refer to Alternate Components Addendum (Version 1.8) COMPOSITION SHINGLE i FlashFoot2 FlashVue QM L-Mount QM QBase QM Classic Comp Mount TILE h - Knockout Tile QM Tile Replacement All Tile Hook and Flashing (optional) QM Quick Hook and QM QBase Tile Flashing (optional) ADDITIONAL ROOF TYPES -�f d QM Qbase Shake - QM Classic Mount QM Lynx Metal Roof Slate - Metal Shingle Shake Attachment LOW SLOPE ROOF Flat Roof Attachment QM QBase Mount 4F, PHAZR Use IronRidge's Microinverter Kit to bond compatible microstroage devices to the racking system. Insert Microinverter Kit T-bolt into top rail slot. Place compatible microstorage into position and tighten hex nut to 80 in-Ibs. ` COMPATIBLE PRODUCTS MicroinvertertGt (8{I in-Ibsj PHAZR PHAZR Devices PHAZR-X, where X is 6.12. Solpad Solpad Inverter model SI-1k Solpad Battery Storage model SB-2K Solpad Junction Box model SJB-4k C Running a separate equipment grounding conductor to the PHAZR or - — Solpad devices is not required. Solpad If installing in areas with ground snow loads greater than 40 psf and Two sets of two underneath a module, Install PHAZR and Solpad devices as close as Microinvener Kits possible to module frame edge. (80 in-lbsi D Solpad may only be installed on XR-100 and XR-1000 � T > Solpad may only be installed with modules having a frame thickness of 35mm or greater. , D Use the number of IronRldge Microinverter kits allowed by the microstorage mounting flange. Some will require 1 kit and others 2 kits. - D c �5 ;FRS Insert Frameless Kit T-bolt in top rail slot. Place star washer over T-bolt, allowing it to rest on top of rail. Secure module clamps with a hex nut and torque to 80 in-Ibs. COMPATIBLE PRODUCTS Sunforson Sunforson silver or black SFS-UTMC-200(B) mid and SFS-UTEC- 200(B) end clamps. Sunpreme Sunpreme silver or black mid and end clamps with part numbers 7500105X where "X" is 1, 5, 6 or 7. Ir-onrifte IronRidge silver or black mid and end clamps with part numbers FMLS-XC -001 -Y where "X" is E or M and "Y" is B or blank. >v Follow module manufacturer's installation instructions to install the module clamps. P Frameless modules require using a Grounding Lug on every rail. P For Sunpreme Modules Only: If required to use slide prevention hardware, see Module Slide Prevention Addendum (Version 1.10). Place Star Washer \ Module Clamp (80 in-Ibs) Grounding Lugs Required or Every Rail ® 2021 IRONRIDGE, INC. VERSION 3.3 FLUSH MOUNT INSTALLATION MANUAL ifs D,I S,C LAIM.ER...................................................................................................._.......,............................................,.....,......,..........,......,.,..............................................................................1. T1NGS MARKINGS............................................................................. ........ .............. .............................................................. ........................................................................ ATTACHMEN.T.S........... ........................................................................................................................................................................................................................... 3 COMPONENTS ................................................................................................................. ..... ................. ... ....... ... .................. ...................... ....... ...... ............. .................... ............. 4 1.. ATTACH,.BASES... ........................................................................................................................... .. ... ....... .............. ....................................... ......6 2,..PLACE.,RAIL$................................ .............................................................................................................................. 1..,.SECURE.,LU.G.S..... ...... ..................................................................... :.................................................................................................................................. fi ....... . 4. SECURE„„ I.................. fi ........................................................................ ............................................'........,.................................... B.O,NDING,JUM,P,ER......................... . ....................................................................... ... ........ ... .,.,.......... EX,PANSION,JOI,NTS................................ ....... .. ................................................................ ....................................................................................................... ELECTRICAL ELF.C...TRICAL„DIAGRAM.................................................... .......................... ............................... .... ... ........ ..................................... .......... ............ ............ .............. .......... 9. ....... ................................................ .1....,,.,,,.......,..,......,..,...,...............................................,.......,. ,.....,.......,,... „ ................10.-1.1. TILE .,.. ........... 12-14 ADDITIONAL ROOF...............�..S..............................,..,.....,....................................., LO,.., .... 0.,....,..ROOFS ................................................................................................................ .... ................ .................................................. ..r.,...,.... ,..,. 15 CONDUIT, PEN„E,,T„ R,ATI.O.N....................................................................................................................................................................................................... I6 CONDUIT. M..... I ................................................................................ ................................................................................................................................ I7 END„CAPS............................................................................................................................................... .............. „.,....,,..... ..... ,... ..... ... ............ ,........,....,..,,........,...,,......... 1$ WIRE..CLIPS.................................... ..... .. ..... .................................................................................................................................................................. ...............18. QBO1X PAASS.E......... „ .................... J.U,N.,t.CJSSTIIINNOG N„ ..U....N.....P...O.......W........ MICROINV,, S .................................... ................................................. .................... . .............................1.11 6L.GR,.KIT.............................. ..MT.IHCRROOUINGVHEBROTEXRS..O.R,.S.. E.....R...,A....C.... EANNPDH SYS,TE,MS. MODULES ................ .... ... ,EMIC.R.OSTORAG,E„P,RODUCTS, ,,,, ,,,,,,,, ,98 2p FRAMELESS., MODULiE KI,TS.. ....... ................................................................................ .... ... .................. . .....20. MOD.ULE,COMPATIB,ILITY................................................. .............. ... ... ..................... ........ ................................................................. ....... ..... ..... ..21„-25 FRAMELESS.MO,DULE COM,PATABILITY.................................... ...................... ................. .... ............................ 26 This manual describes proper installation procedures and provides necessary standards required for product reliability. Warranty details are available on website. All installers must thoroughly read this manual and have a clear understanding of the installation procedures prior to installation. Failure to follow these guidelines may result in property damage, bodily injury or even death. IT IS THE INSTALLER'S RESPONSIBILITY TO: • Ensure safe installation of all electrical aspects of the array. All electrical installation and procedures should be conducted by a licensed and bonded electrician or solar contractor. Routine maintenance of a module or panel shall not involve breaking or disturbing the bonding path of the system. All work must comply with national, state and local installation procedures, product and safety standards. • Comply with all applicable local or national building and fire codes, including any that may supersede this manual. • Ensure all products are appropriate for the installation, environment, and array under the site's loading conditions. • Use only IronRidge parts or parts recommended by IronRidge; substituting parts may void any applicable warranty. • Review the Design Assistant and Certification Letters to confirm design specifications. • Ensure provided information is accurate. Issues resulting from inaccurate information are the installer's responsibility. • Ensure bare copper grounding wire does not contact aluminum and zinc -plated steel components, to prevent risk of galvanic corrosion. If loose components or loose fasteners are found during periodic inspection, re -tighten immediately. Any components showing signs of corrosion or damage that compromise safety shall be replaced immediately. • Provide an appropriate method of direct -to -earth grounding according to the latest edition of the National Electrical Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Photovoltaic Systems. • Disconnect AC power before servicing or removing modules, AC modules, microinverters and power optimizers. • Review module and any 3rd party manufacturer's documentation for compatibility and compliance with warranty terms and conditions. 'MODULE Ecosolargy modules with 35, 40, and 50 mm frames Ecosolargy ECOxxxYzzA-bbD Where "Y" can be A, H, S, or T, "zz" can be 125 or 156; "A" can be M or P; "bb" can be 60 or 72; and "D" can be blank or B ET Solar modules with 30, 35, 40, and 50 mm frames ET Solar ET YZZZxxxAA Where "Y" can be P, L, or M; "ZZZ" can be 660, 66013H, 672, 672BH, 75461-1, 7668H, 772BH; and "AA" can be GL, TB, TW, WB, WW, BB, WBG, WWG, WRAC, WBCO, WWCO, WWBCO or BBAC Flex modules with 35, 40, and 50 mm frames Flex FXS-xxxYY-ZZ; Where "YY" can be BB or BC; and "ZZ" can be MAA1 B, MAA1 W, MA81 W, SAA1 B, SAA1 W, SAC1 B, SAC1 W, SAD1 W, SBA18, SBA1 W, SBC18, or SBC1 W GCL modules with 35 mm and 40 mm frames GCL GCL-abNY xxx Where "a" can be M or P; "b" can be 3 or 6; and "YY" can be 60, 72, 72H, or 72DH Gigawatt modules with 40 mm frames GigaWatt Solar GWxxxYY Where "YY" can be either PB or MB Hansol modules with 35 and 40 frames Hansol HSxxxYY zz Where "YY" can be PB, PD, PE, TB, TD, UB, UD, or UE; and "zz" can be AH2, AN1, AN3, AN4, HH2, HV1, or JH2 Hanwha Solar modules with 40, 45, and 50 mm frames Hanwa Solar HSLaaP6-YY-1-xxxZ Where "aa" can be either 60 or 72; "YY" can be PA or PB; and "Z" can be blank or B Hanwha Q CELLS Modules with 32, 35, 40, and 42mm frames aaYY-ZZ-xxx where "aa" can be Q. or B.; "YY" can be PLUS, PRO, PEAK, LINE PRO, LINE PLUS, PLUS DUO or PEAK DUO; and "ZZ" can be G3, G3.1, G4, G4.1, L-G2, L-G2.3, L-G3, L-G3.1, L-G3y, L-G4, L-G4.2, L-G4y, LG4.2/ TAA, BFR-G3, BLK-G3, BFR-G3.1, BLK-G3.1, BFR-G4, BFR-G4.1, BFR G4.3, BLK-04.1, G4/SC, G4.1/SC, G4.1/TAA, G4.11MAX, BFR G4.11TAA, BFR G4.1/MAX, BLK G4.1/TAA, BLK G4.11SC, EC-G4.4, G5, G5/ Hanwha Q CELL SC, G51TS, BLK-G5, BLK-G5/SC, BLK-G5/TS, L-G5, L-G5.1, L-G5.2, L-G5.2/1-1, L-G5.3, G6, G6/SC, G6/TS, G6+ITS, G6+, BLK-G6, L-G6, L-G6.1, L-G6.2, L-G6.3, G7, BLK-G6+, BLK-G6+/AC, BLK-G6+/HL, BLK-G6+/ SC, BLK-G6/TS, BLK-G6+ITS, BLK-G7, G7,2, G8, BLK-G8, GB+, BLK-G8+ L-G7, L-G7.1, L-G7.2, L-G7.3, L-G8, L-G8.1, L-G8,2, L-G8.3, L-G8.31BFF, L-GB.3/BFG, L-G8.31BGT, ML-G9, BLK ML-G9, ML-G9+, BLK ML-G9+, ML-G10, BLK ML-G10, ML-G10+, BLK ML-G10+, ML-G10.a, BLK ML-G10.a, ML-G10.a+, BLK ML-G10.a+, XL-G9, XL-G9.2, XL-G9.3, XL-G9.31BFG, XL-G10.2, XL-G10.3, XL-G10.c, XL-G10.d, XL-G10.d/ BFG or XL-G10.3/BFG Heliene modules with 40 mm frames YYZZxxxA Heliene Where "YY" can be 36, 60, 72, 96, 120 or 144; "ZZ" can be HC, M, P, or MBLK; and "A" can be blank, HomePV, or Bifacial HT-SAAE modules with 35 and 40 mm frames HT-SAAE H Tyy-a a aZ-xxx Where "yy" can be 60, 66, 72 or 78, "aaa" can be 18, 156 or 166, "Z' can be M, P, M-C, P-C, M(S), M(VS), M(V), P(V), M(V)-C, P(V)-C, or X Hyundai modules with 33, 35, 40 and 50 mm frames Hyundai HiY-SxxxZZ Where "Y" can be A, D or S; "S" can be M or S; and "ZZ" can be GI, HG, HI, Ki, MI, NIF, MG, PI, RI, RG, RG(BF), RG(BK), SG, TI or TG Itek Modules with 40 and 50 mm frames Itek IT-xxx-YY Where "YY" can be blank, HE, or SE, or SE72 Engineered to ASTM D 1761 (Standard Test Methods for Mechanical Fasteners in Wood) ., Components RT2-00-M IN IB K MINI base: 20 ea. Screw: 40 ea. Extra RT-Butyl : 10 ea. Optional item 5 x 60mm Mounting screw (RT2-04-SD5-60) : 100 ea./Bag 5/16" Hex bolt, washer & nut set (RT-04-BN30SL-US) : 100 ea./Bag RT-Butyl (RT2-04-BUTYLT) : 10 ea./Box RT-Butyl is Roof Tech's flexible flashing used in one million residential PV systems for the last 26 years. It is the first PV mounting system with Flexible Flashing certified by the ICC. Engineered to withstand wind speeds up to 180 mph and ground snow up to 90 psf. Metal Flashing Retrofit Flexible Flashing Shedding water? 100% Waterproof ICC ESR-3575 UV testing (7500 hrs.) h Dimensions in (mm) r 0 0 31/2 (90) 0 0 [� 2- -(• 5�0 )) o 0 :Z"r m •-- Rafter installation Deck installation P.E. Stamped Letters available at www.roof-tech.us/support TAS 100 A on metal and asphalt roof. f Recom modules with 35 and 40 mm frames I Recom RCM-xxx-6yy Where "yy" can be MA, MB, ME or MF REC modules with 30, 38 and 45 mm frames REC Solar RECxxxYYZZ Where "YY" can be AA, M, NP, NP2, PE, PE72, TP, TP2, TP2M, TP2SM, TP2S, TP3M or TP4; and "ZZ" can be blank, Black, BLK, BLK2, SLV, 72, or Pure ReneSola modules with 35, 40 and 50 mm frames Renesola AAxxxY ZZ Where AA can be SPM(SLP) or JC; "Y" can be blank, F, M or S; and "ZZ" can be blank, Ab, Ab-b, Abh, Abh-b, Abv, Abv-b, Bb, Bb-b, Bbh, Bbh-b, Bbv, Bbv-b, Db, Db-b, or 241Bb Renogy Modules with 40 and 50 mm frames Renogy RNG-xxxY Where "xxx" is the module power rating; and "Y" can be D or P Risen Modules with 30, 35 and 40 mm frames Risen RSMyy-a-xxxZZ Where "yy" can be 60, 72, 110, 120,132 or 144; "a" can be 6, 7 or 8; and "ZZ" can be M, P or BMDG S-Energy modules with 35 and 40mm frames S-Energy SABB-CCYYY xxxZ "CC" "YYY" Where "A" can be C, D, L or N; "BB" can be blank, 20, 25, 40 or 45; can be blank, 60 or 72; can be blank, BIDE, MAE, MAI, MBE, MBI, MCE or MCI; and "Z" can be V, M-10, P-10 or P-15 Seraphim modules with 30, 35 and 40 mm frames Seraphim Energy SEG-aYY xxxZZ Group Where "a" can be blank, 6 or B; "YY" can be blank, MA, MB, PA, or PB; and "ZZ" can be blank, BB, BG, BW, HV, WB, WW, BMB, BMA-HV, BMA-BG, BMB-HV Seraphim modules with 30, 35, 40 and 50 mm frames Seraphim USA SRP-xxx-YYY-ZZ Where "xxx" is the module power rating; and "YYY" can be BMA, BMD, 6MA, 6MB, 6PA, 6PB, 6QA-XX-XX, and 6QB-XX-XX; ZZ is blank, BB, BG or HV Sharp modules with 35 and 40 mm frames Sharp N UYYxxx Where "YY" can be SA or SC Silfab Modules with 35 and 38 mm frames Silfab SYY Z-xxxAb Where "YY" can be IL, SA, LA, SG or LG; "Z" can be blank, M, P, or X; "A" can be blank, B, H, M, N; and "b" can be A, C, L, G, K. T, U or X Solaria modules with 40 mm frames Solaria PowerXT xxxY ZZ Where "Y" can be R or C; and "ZZ" can be AC, BID, BX, BY, PD, PM, PM -AC, PX, PZ, WX or WZ Solarcity modules with 40 mm frames Solarcity (Testa) SCxxxYY Where "YY" can be blank, B1 or B2 SolarTech modules with 40 and 42 mm frames SolarTech AAA-xxxYY Where "AAA" can be PERCB-B, PERCB-W, HJTB-B, HJTB-W or STU; "YY" can be blank, PERC or HJT SolarWorld Sunmodule Plus, Protect, Bisun, XL, Bisun XL, may be followed by mono, poly, duo, black, bk, or SolarWorld AG clear; modules with 31, 33 or 46 mm frames SW-xxx _ SolarWorld Sunmodule Plus, Protect, Bisun, XL, 6isun XL, may be followed by mono, poly, duo, black, bk, or SolarWorld Americas clear; modules with 33 mm frames S WA-xxx Sonali Modules with 40 mm frames Sonali SSxxx Stion Thin film modules with 35 mm frames Stion STO-xxx or STO-xxxA • a - + i a - Astronergy Solar Canadian Solar Heliene Jinko Prism Solar Risen Stion Sunpreme Trina Astronergy frameless modules CHSM6610P(DG)-xxx Canadian Solar frameless modules CSbY-xxx-Z Where "b" can be 3 or 6; "Y" is K, P, U, or X; and "Z" can be M-FG, MS-FG, P-FG, MB-FG, or PB-FG Heliene frameless modules YYZZxxxA Where "YY" can be72; "ZZ" can be M; and "A" can be GH Jinko frameless modules JKMxxxPP-DV Prism Solar frameless modules BZYY-xxxAAA Where "Z" can be i or N; "YY" can be 48, 60, 60S, 72 or 72S; and "AAA" can be blank or BSTC Risen frameless modules RSMyy-6-xxx77 Where "yy" can be 60, 72,120 or 144; and "ZZ" can be MDG or PDG Stion frameless modules STL-xxx or STL-xxxA Sunpreme frameless modules GXB-xxxYY Where "YY" can be blank or SL Trina frameless modules TSM-xxxYY Where "YY" can be either DEG5(II), DEG5.07(11), DEG5.40(II), DEG5.47(II), DEG14(11), DEG14C(il), DEG14C.07(11), ❑EG14.40(II), PEGS, PEG5.07, PEG5.40, PEG5.47, PEG14, or PEG14.40 2021 IRONRIDGE, INC. VER