Loading...
HomeMy WebLinkAboutSURVEYa� 0 U 0 4$��0 g1, FIRC access Path 8 f 'gall -124,3 2° PSM4049 Delta tli%33 '� FIRC 6' Unit " PSM4049 A" o I PRESERVATION AREA � FIRC Zone AE 2+ PSM4049 V V X r\ _ "0 - �T°o Zone X Zone / / `� 9 9o� o / X oon e Cen t r - ,7 Xd'9 X 1 5 9 116 0� 10.0 Zone X °°\_ Plat 14 U k Silt nit 16 _ —32.5'� kr \ �� QR°Q05�o µ Preo go / / 12769 NW MaOne Story rinereC04rt Fencing s2 5QP p / Je<ed10�5 en°e o 0 0 .60 9r 96 x / �1� �6 Fze0o��10' o. m C6 Li ed o f 'o N _ _Silt Q(09° 16red F\ r, I ci W W W I Fencing �, �.. F�� I 9q o of CIE 16 ko I r' x l- -- 7.4 I `O 109 I 1� � I-- ' N0 a L 1� 0 �uilding Setback Line O LP Tank N XIQ o\e CO t X T FIRC 10 x6, LB7357 —19�_ o v —,g of OQ 2.0' Off Set � .9j w Q 0 LP Tank I to N55000'00 "E 112.00 " X-Section A -A � �� X Existing Residence at Finished Floor El. 10.0 X 6-S = rn � 0 0 N 0 e° X9 C � SM 49 ` .48' U. 1 'w ^ _ gyMPSTER `r 6 \ 9 r �\ \ \ -o OL \� < ° PORTOLET DPveeay < ( oo, Bo'` rn 0 LEGAL DESCRIPTION Unit 16, MARINER VILLAGE, HARBOUR RIDGE, PLAT N0.4, according to the Plat thereof, os recorded in Plat Book 24, Pages 19, 19A through 19D, Public Records of St. Lucie County, Florida. SURVEYOR'S REPORT 1 This Survey shall not be valid unless sealed with on embossed Surveyor's Seal. 2 No underground improvements have been located as part of this Survey. 3 The last field date of this Survey was: 3.26.2019. 4 This Survey was prepared using the Plat of Record, no search of the public records was performed by this office. 5 This Survey shown hereon was prepared in accordance with the Standards of the practice of Surveying and Mapping as defined in 5J-17.050-052FAC. 6 By acceptance of this survey all parties agree that the signing surveyor's liability is limited to the amount paid for said Survey. 7 Bearings have been based on the North Line of the Subject Property as shown hereon. All other bearings are relative thereto. 8 Parcel/Lot line locations have been based on found survey control along the center line and/or right of way line of NW Mariner Court. 9 LEFT BLANK. 10 The Legal Description shown hereon was provided by the client and/or his/her representatives. 11 No ownership of fence lines has been determined as part of this Survey. 12 Off set calls to found survey control are relative to the nearest property corner, intersection of lines, point of curvatures (PC), point of reverse curvatures (PRC) or other identifiable point. 13 Compliance with local zoning requirements and or with requirements set forth by other State, Public, and/or Private entities has not been verified as part of this Survey. 14 Elevations shown hereon are in accordance with the North American Vertical Datum of 1988. 15 The purpose of this map is to show he proposed pool and deck of the residence under construction. o; Area Calculations: Lot 24,356 SgFt = 100% Proposed Residence with Potio 1pecks 4804 SgFt = 19.8% Proposed Drive PORTALET Walks and Pads 3282 SgFt = 13.5% — — POOL 1090 SgFt = 4.5% Total Impervious Area_____ TOTAL SPACE = 37.8% 62.2% OPEN = \ 7R 049 \ rb me \ Edge of P°ve � + \ j� r � � / d' �4 a \�"s X Pbvemen{ / Uedge of SIRC ES I I — LEGEND LEGEND C — Concrete FEMA Flood Zone data shown here on is based on the visual inspection of the digital Flood Hazardous Maps CIE — Covered Entry FCM — Found 'Iron oncrete Monument provided b the Federal Emergency Management Agency FEMA and is limited to the accuracy of such maps. CAC —Concrete Pad with Air Conditioning FlP —Found }" Iron Pipe P Y 9 Y 9 9 Y (FEMA) Y P CB -Catch Basin FlPC -Found CBS -Concrete Block Structure Iron Pipe with Cap Flood Zone: X and AE with Base Flood Elevation 5, Community #: 120285, Panel #: 0406, Suffix: K, Date: 2.19.2020 nR — Found #5 Iron Rod CMP — Corrugated Metal Pipe FlRC —Found 5 Iron Rod with Ca CPE —Concrete Pad with Pool Equipment i p SIRC — S t Jr 1 Rod 'th C "I 7357" CTv — Coble TV Box FFE — Finished Floor Elevation a ran wl ap FlPC — Found 112" Iron Pipe with Cap GV — Water Gate Valve FM — Found Mag Nail HYD — Fire Hydrant FMD — Found Mag Nail with Disk OIL — Overhead Utility Line FN — Found Nail PP — Power Pole FNTT — Found Nail with Tin Tab SSMH — Sanitary Sewer Manhole FPK — Found PK Nail TCB — Telephone Communications Box FPKD — Found PK Nail with Disk UB —Utility Box FRRS — Found Rail Road Spike WM —Water Meter /CO — In Pavement Cut Out Prepared For: Geraldine & Louis M. Addeo Jr. X-Section B-B o 2 Q Q) J ----17.4'Ci- --- a o Finished Floor Q.- El. 10.5 3' — 14.4' xI Eio- F oter NG / 8.1 Finished Grade 7.6 X-Section A -A o x c � J — — — — 17.5'---- a X NG 9.51 7.5' — — 10'+/ .] Finished Floor El. 10.5 PREPARED FOR: Louis M. Addeo Jr. & Geraldine Addeo Prepared By: Regina C. Karner, PSM#4363 Karner Surveying, Inc. LB#7357 KARNER SURVEYING, INC. Rein �g�'iY Residential & Commercial Surveying Services I Regina Kerner a Date: 2740 SW Martin Downs Blvd.#333, Palm City, F1.34990 Ka`rner'�'4:2A Phone: (772)288 7206 Fax:(772)223 8181 -g5W WWW. KARNERSURVEYINGINC. COM learner®comcast.net A2 ErVeb � s� a Sea ,ter Byr Revlslon 7.29.211 1 FEMA I ------------- Construction and Final Inspection Note: 1) The contractor will utilize best management practices during all phases of construction to adhere to those requirement contained in and made part of the Building Permit 2) A storm water detention Swale , a depth of 6"-12" in depth, shall be provided adjacent to the proposed improvements at 6" below the adjacent grade but not exceed a slope of 5:1 Sheet Title, Boundary Survey 1'-20' _1-25-21 Sheet No.r Fleld Book, 1 OF 1 LL CADD FNe, Flle Na, 2010-20