Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PV Roof Mount Installation
FRONT OF HOUSE Ground Access Point • _@� 3' Access Pathway - a �2' Gutter 'of ; R-2 #Modules (4) Pitch: 18 Azimuth: 90° Inverter Type: Enphase IQ7-60-2-US PV Panel: (29)QPEAKDUOBLKML G10+395W Ground Access Point Racking: Q-Rail Light ° Total Wattage: 11,455W O -COGEN Disconnect Roof Type: Composition Shingle&EPDM Located adjacent to Wind Load: 0 to 20 Deg Utility meter Fastener Type: Use(2)M5 x 60mm SS Lags 2' Gutter Utility Meter Sheet Index R-1 2' Gutter S-1 Cover Sheet/Site Plan #Modules (14) S-2 Detail Pitch: 18' E-1 One-Line Azimuth: 180° E-2 Electrical Code R-3 Ground Access Point S-1 A Mounting Plan #Modules (11) Pitch: 0° General Notes: Azimuth: 180° -Enphase IQ7-60-2-US Micro Inverters are located on roof behind each module. -First responder access maintained and from adjacent roof. -Wire run from array to connection is 40 feet. 3'-4" 6'-1 11 1 S1r.i1V TEC Layout Subject to Change Based on Site Conditions SOL AA E1Y C-RGY M Al nS You r Sal mr Day Sflgh re r!I! 7300 Bryan Dairy Rd STE 400 Donnie C ................., Godwin Engineering and ONA� Godwin °'�GENsll;%�is •'• Seminole, FL 33777 Design, LLC No 81360 727-571-4141 8378 Foxtail Loop 2021 .1 1 •2 9'• STATE OF System meets the requirements of NFPA 70th Edition, Chapter 11.12 Install will be done to Manufacturer Spec 3 p Pensacola, FL 32526 3 gprONAnr�a, Meets All Editions of Florida Fire Prevention Code 2020 7th Edition Customer Info' D. Chad Godwin, PE 15:23:20 Legend 11-T All Meets all requirements of NFPA-1 7th Edition and NFPA-101 Chad@godwineng.com .o µYELE�RON1LCOP1� o0 g � Chimney 100106_ st Responder First responder access Satellite 1der Access 0 Utility Meter o Vent Pipe Represents all Fire Clearance p Frances Levy Date: 11/18/2021 NPV Disconnect including Alternative methods minimum of 36" unobstructed as per 8405 Fort Walton Ave Drawn b AN Section R324 of the 2018 IRC Y� Meets the requirements of the following- (2020 FL Residential Code & FBC, 7th Edition (2018 International Fort Pierce, FL Revised by: Residential Code) - 2nd Printing modified by the FL Building Standards, 2020 Florida Building Energy 34951 Rev #: 00 Conservation Code 7th edition, County of St. Lucie Code, 2017 National Electric Code.) Rev Date: Page: S-1 Compass for Aerial r✓ H Quick-Mount Light Rail - ' Q g General Notes:Rl-R2 General Notes:R3 .� - Roof Tech Mini's are secured to rafters - Roof Tech Mims are secured to rafters Install will be done to Manufacturer Spec @ 24" O.C. in Zone 1, @ 24" O.0 in Zone 2e, @ 32" O.C. in Zone 1', @ 32" O.0 in Zone 1, Donnie C @ 24 O.C. in Zone 2r & @ 24 O.0 in Zone 3 Engineering NP 16 O.C. in Zone 2 & 16 O.C. in Zone 3 Godwin En ineerin and D G @ • � Design, LLC Godwin :-�°�:�c�ENSF�ti using (2) M5 x 60mm stainless steel Lag bolts. using (2) M5 x 60mm stainless steel Lag bolts. g ; : "° 8,360 8378 Foxtail Loop 2021 .11 STATE OF ", - Subject roof has One layer. - Subject roof has One layer. Pensacola FL 32526 23 All penetrations are sealed. '��� �; - All penetrations are sealed. _ D. Chad Godwin, PE Chad@godwineng.com 15:23:33 �NccoPEs o0 Roof Section Pitch Roof Rafter and Spacing Overhang Notes: '00'06- R 1-R2 4/12 211x4" @ 24 O.C. 12" Truss 6DA, V TEG Fi EntE ii C3Y R3 0/12 2"x6" @ 16 O.C. 12" IM1aling vo u r solar uay a ng ni a r+. -Roof Height 15' Customer Info: 7300 Bryan Dairy Rd STE 400 g Seminole, FL 33777 -Per 2020 FBC the Roof Mounted PV System Inverter Type: Enphase IQ7-60-2-US 727-571-4141 y PV Panel: (29) QPEAKDUOBLKML G10+ 395W will be subject to the following design criteria: Racking: Q-Rail Light Frances Levy Date: 11/18/2021 Design Wind Speed(Vult) - 160mph 3 sec gust, Total Wattage: 11,455W 8405 Fort Walton Ave Drawn by•. AN Exposure Category - C Roof Type: Composition Shingle & EPDM Fort Pierce, FL Revised by: Wind Load: 0 to 20 Deg Rev #• 00 -Designed as per ASCE7-16 Fastener Type: Use (2) M5 x 60mm SS Lags 34951 Rev Date: Page: S-2 Enphase Output Ckt Per String To Overcurrent Protection Device Photovoltaics: AC Max Output Current 15 Enphase IQ Trunk Cable (29) QPEAKDUOBLKML G10+ 395W AC Max Output Current * 1.25% 18.8 Q-12-240 Overcurrent Protection A zo #12AWG THHN-THWN-2 No. of Current Carrying Cond <4 UL 9703 Inverters: Conductor Gauge(AWG) 10 (29) Enphase IQ7-60-2-US Micro Inverters Enphase Total Output Ckt FFGrounding Conductor Circuits: AC Max Output Current 29 g (1) circuit of(15) Modules AC Max Output Current* 1.25% 36.3 to be bare#8 Aw tp (1) circuit of(14) Modules Overcurrent Protection(A) 40 NEMA 3R No. of Current Carrying Cond <4 Junction Box Roof Maximum Inverters Per 20A Circuit (16) Conductor Gauge (AWG) 8 #10 AWG THWN for Home runs Black-L1 (1)Line 1 Red-L2 (1)Line 2 NEC LABEL NOTES: Green-Ground 1. THE WARNING SIGN(S)OR LABEL(S)SHALL COMPLY Per Circuit #8 AWG THWN WITH NEC 110.21(B) 2. LABELS SHALL BE SUITABLE FOR THE ENVIRONMENT (1)EGC WHERE THEY ARE INSTALLED. Inside @ least 3/4"Conduit(tbd on site) 3. LABELS TO BE A MIN LETTER HEIGHT OF 3/8"AND WARNING PERMANENTLY AFFIXED. ELECTRIC SHOCK HAZARD Meter 4. LABELS SHALL ALSO COMPLY WITH THE SPECIFIC DO NOT TOUCH TERMINALS. O REQUIREMENTS OF THE AUTHORITY HAVING TERMINALS ON BOTH THE LINE AND JURISDICTION. LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION Main Distribution Panel 150A Main • • &!jTA • Line Side Tap RATED AC OUTPUT CURRENT: 29A NOMINAL OPERATING VOLTAGE: 240VAC Manual Lockable Disconnect 60A Service Rated Fused Disconnect Donnie C Enphase Combiner Box Neutral to Ground Bond AC Disconnect .�pNA�,•�j00��!., Godwin Engineering and (1)-20A Breaker 40AFuse Godwin No ataso Per Circuit Design, LLC ^^�� 2 Circuits 202 1 .11 =9 * x 240v 8378 Foxtail Loop •a9 STATE OF :�. 10/15A Breaker for Envoy Located Adjacent to Utility Meter " ��. Disconnect Pensacola, FL 32526 23 -,ss, • ENS. #8 AWG THWN �q„#1NAl a„o` Solar Combiner Box #6 AWG THWN D. Chad Godwin, PE TM8ITE„p E�Eoa.°CTOMI ' DO #X-IQ-AMl-240 (1)Line 1 1 Line 1 (1)Line 2 Chad odwinen com "TNO LEI (1)Neutral (1)Line 2 @g g " SIGNAT FFANY MISTBEVNIC Es #8(1)EGC in Neutral Ioo'o6— in @ least 3/4"Conduit Typically in least 3/4"Conduit Typically In Compliance with NEC 705.12(B) Refer to NEC 312.8 for SU iV TEC SOLAR [NERUY Conditions on taps in switch and over current devices making Yo ur Solar vay erlyntc r!!! Enclosures. If the conditions are not met a tap box will 7300 Bryan Dairy Rd STE 400 System meets the grounding requirements of NEC 690.43 need to be installed and revision com feted. Seminole, FL 33777 Including the label below GEC NOTES Customer Info• 727-571-4141 Note: - Ungrounded system per 690.41(A)(4) -All wiring to meet the 2017 NEC and - GEC must be installed per 250.64 Date: 11/18/2021 - GEC must be continuous un-spliced or irreversibly spliced from Inverter Type: In Case of Emergency Call Florida electric codes. inverter to existing service ground system or continuous from the Frances Levy Drawn by: AN Sun Tec Solar Eller 60A Disconnect arrays to the existing service ground system. y Enphase IQ7-60-2-US Energy - GEC must be min#8 AWG and installed in conduit 8405 Fort Walton Ave Revised b • PV Panel: at 727-571-4141 -Type of conduit to be determined - If GEC is not in conduit,it must be#6 min Fort Pierce FL (29) on site by contractor. Disconnects will be Visible,lockable,adjacent to Rev #: 00 QPEAKDUOBLKML G10+395W and within 10'of utility meter 34951 Rev Date: Total Wattage: All Labels&Markings for photovoltaic system will be 11,455W Meets 11.12.2.1.5 Install will be done to Manufacturer Spec reflective and meet all requirements for NFPA 11.12 Page: E-1 The Placard shall be permanently -A placard will be added with Enphase Total Output Ckt , R �- EMERGENCY RESPONDER riveted...,and shall be made of red, instructions and locations to beTHIS SOLAR' P�l SYSTEM IS weatherproof,hard plastic,with in compliance with 690.12, To Overcurrent Protection Device EQUIPPED WTH RAPID SHUTDOVVN engraved white block lettering. 690.56(B)and NEC 705.10 Design Temperature(°F) 94 �IN TURN RAPID SHUTDOWN Max Ambient Temp. Range °F 87-95 310.15(B)(2)(a) POSITION To SFF HUT Rapid Shutdown Built in In compliance with NEC o THE ENTIRE PV SYSTEM, p Temp.Rating of Conductor 75 C ELECTRIC SHOCK HAZARD 250.58,NEC 690.8, DO NOT TOUCH TERMINALS. Per Code NEC 690.12 No. of Current Carrying Cond <4 310.15(B)(3)(a) TERMINALS ON BOTH THE LINE NEC 250.24,NEC250.24(D) AC Max Output Current 29 690.8(A)(3) AND LOAD HE OP MAY POSITION. ENERGIZED Coductors have a min AC Max Output Current* 1.25% 36.3 690.8(B) IN THE OPEN PpS.35 690.17E NECW0.WCX11 AND NFPA111:1211.1.1.1,11.12Z.1A PV AC disconnect is NEC 690.35 lockable in the open position apacity of 60 amperes Overcurrent Protection(A) 40 per code NEC 705.22(6) Per Code NEC 230.79(D) Amb. Temp Correction Factor 0.94 310.15(B)(2)(a) WIN Raceway Fill Adjustment Factor 100% 310.15(B)(3)(a) Everything will be built to Code without all Specifics labeled on plan Cord. Gauge AWG 8 310.15(B)(16) THIS SERVICE METER Cond.Allowable Ampacity(Amps) 50 IS ALSO SERVED 13Y A System is in complaince with FFPC 1:11.12 7th Edition. Cond.Adjusted Ampacity(Amps) 47 50*.94*1=47 PHOTOVOLTAIC SYSTEM Smoke Detectors will be added as per FBC 553.883 All Exterior equipment is A minimum of Nema-R3 Rated 705.12(B)(3) In compliance with 230.71 J-Box not penetrating roof All Interactive System(S) Points of interconnection �� RlN Markings shall be placed on all DC Conduits,DC Combiners, with other sources shall be marked at an accesible Combiner box in compliance WARN ING:PHOTOVOLTAIC ! 3 i -- (M- Raceways,Enclosures,Junction Boxes,and Cable Assemblies location at the disconnecting means as a power Per Code NEC 705.12 POWER SOURCE POWER SOURCE at every 10',turns,and above and below penetrations in source and with the rated ac output current and the 2* 20A< 125A OUTPUT CONNECTION compliance with NFPA nominal operating AC voltage. Per NEC 690.54 * I DO NOT RELOCATE THIS p g 9 No other loads to be added SOLAR PV SYSTEM EQUIPPED OVERCURRENT DEVICE TEXT WITH RAPID SHUTDOWN Disconnect means shall be provided for all Disconnect is in compliance 230.72 Permanent sticker added to disconnect 3/81N MIN. 705.12(B)(2)(3)(b) disconnecting all ungrounded conductors that supply ID or ass throu ht the building or structure Per Code SHUTDOWN WTURN ITCHT p g g In Case of Emergency Call Supply side disconnect adjacent to Msp Apply to Main Disconnect 3/161N MIN.TEXT THE"OFF"POSITION T 2017 NEC Section 225.31 & Section 225.32 Sun Tec Solar Energy SHUT DOWN PV SYSTEM AND "Next size up" A REDUCE PHOTOVOLTAIC POWER SOURCE E04. Construction documents specify PV system circuits at 727-571-4141 SHOCK HAZARD IN THE Over Current Protection Device is ARRAY. installed or in buildings include a rapid shutdown function Based on Inverter Maximum Continuous Output NEC 690.31 (G)(3) L�] that controls ols specific conductors in accordance with NEC Current Rating 2017 NEC 240.4(B) Line Side Tap will be done in Main Distribution Panel inside of Home article 690.12. Figure 690.56(C)(1)(a) Label for PV Systems that Labels will be placed Shut down the array and the conductors leaving the array E05.These construction documents specify that a label is -All new equipment Y g Y In the correct location -Markings Shall Be reflective,Weather Resistant and suitable for the environment. "Hno o0p, provided with the method to initiate rapid shut down per located adjacent to Markings with minimum3"CapitalLetters DUAL POWER SUPPLY �E"sEy'4, Meter on exterior wall Per Code NEC 690.56(B), g g 8SOURCES:UTILITY GRID AND 690.12(4). Nu*,3•0 '`,. 690.56(C),&690.53 PV SOLAR ELECTRIC SYSTEM Godwin Engineering and Note: rA,E P:2� E06. Construction drawings specify buildings or structures Metallic conduits, raceways or flexible metal conduit g g '':FS•.<.oA,a.�6j.`• with both utilityservice and a PV system,complyingwith NEC -Subject PV Systems has been designed SONA�E�"` Y exceeding 6 feet in length are not permitted in accordance Des FOXta11 Loopign, LLC article 690.12 shall have a permanent plaque or directory with NEC article 690.31(G). to meet the requirments of the NEC 2017, INVERTER OUTPUT CONNECTION: 8378 including the following wording: "PHOTO VOLTAIC SYSTEM and those set forth by the Florida Solar DO NOT RELOCATE THIS EQUIPPED WITH RAPID SHUTDOWN"as per NEC article Include required label for metallic raceways and conduits to OVERCURRENT DEVICE Pensacola, FL 32526 ion n ie C Godwin sheet E-1 per NEC article 690.31(G)(3). Energy Center Certification, Including 690.56(C). Maximum Number of Module Strings I WARNI D. Chad Godwin, PE p Add required label to sheet E-1 per NEC article 705.10. pstring,n Chad@godwineng.com 2021 •11 •23 E07. Construction documents specify PV power circuit labels Maximum number of modules per POWER SOURCE OUTPUT CONNECTION: shall appear on every section of the wiring system that is Include required label to sheet E-1 per NEC article 705.12(B) Maximum Output, Module Manufacturer and DO NOT RELOCATE THIS OVERCURRENT 1 1 separated by enclosures,walls, partitions,ceilings, or floors. OO O6- 5.24:34 Photovoltaic AC disconnect shall be capable of being locked model number, inverter manufacturer and model WAR E08. Construction documents specify all warning sign(s)or in the open position per NEC article 705.22(6). number, as applicable. DEDICATED SOLAR PANE label(s)shall comply with NEC article 110.21 (B). Label NOT CONNECT ANY warnings shall adequately warn of the hazard. Labels shall be Photovoltaic AC Overcurrent protection shall be located NEC 705.10 A permanent plaque or directory,denoting the location of LOADS su>sv�c 9 q Y all electric power source disconnecting means on or in the premises,shall 3❑L A R [N R[iY within 10 feet of the point where conductors are connected to permanently affixed to the equipment, and Labels required be installed at each service equipment location and at the location(s)of TOVOLTAIC S �� the service per NEC 705.31. the system disconnects for all electric power production sources ca able EQUIPPED WIT maklnQYour Solar vay erlyntc r!!! shall be suitable for the environment. Y ( ) P P P of being interconnected.One sign required for each PV system. RAPID st+uroowN 7300 Bryan Dairy Rd STE 400 System meets the grounding requirements of NEC 690.43 Plans Satisfy NEC 250.94&NEC250.53(A)(2) Seminole, FL 33777 Including the label below GEC NOTES Customer Info: 727-571-4141 Note: - Ungrounded system per 690.41(A)(4) -All wiring to meet the 2017 NEC and - GEC must be installed per 250.64 Date• 11/18/2021 In Case of Emergency Call Florida electric codes. - GEC must be continuous un-spliced or irreversibly spliced from inverter to existing service ground system or continuous from the Frances Levy Drawn by: AN Inverter Type: Sun Tec Solar Energy 60A Disconnect arrays to the existing service ground system. Enphase IQ7-60-2-US -Type e of conduit to be determined - GEC must be min#8 AWG and installed in conduit 8405 Fort Walton Ave Revised b • PV Panel: yp - If GEC is not in conduit,it must be#6 min (29) at 727-571-4141 on site by contractor. Disconnects will be Visible,lockable,adjacent to Fort Pierce, FL Rev #: 00 QPEAKDUOBLKML G10+395W and within 10'of utility meter 34951 Rev Date: Total Wattage: All Labels&Markings for photovoltaic system will be 11,455W Install will be done to Manufacturer Spec reflective and meet all requirements for NFPA 11.12 1 Page: E-2 OL — Proposed Mounting locations 32'-0" 33'-10" L L L L L L L L L L L L #(0 (QD L0O 00 L O0a000� O Q 11 Q LO0 00 L00 � 00000 0L03 I0II00 16I 15'-411 1° 1 I 0 0 O O O O � O O 6 II L L L L L L L L L L LL L 0 0 0 r 00 L L L L L i000o0 ' 5'-411 2' Gutter 18'-11 if 3 3'-10" 9'-4'I 2' Gutter 30'-1 " 2' Gutter R-3 R-1 R-2 # Modules (11) # Modules (14) # Modules (4) Pitch: 00 Pitch: 180 Pitch: 180 Azimuth: 180° 3'-4" Azimuth: 180° Azimuth: 90° 6'-1 11 Plans satisfy zones FBC-1510.7.1 Quick-Mount Light Rail Install will be done to Manufacturer Spec 14' 22 bonnie C Godwin Engineering and 7' Design, LLC Godwin R 1—R2 No 67360 * J` 8378 Foxtail Loop 2021 .1 IA STATE of Max cantilever is 8 as per manufacturer spec. Pensacola FL 32526 FS `�RI°�G Zone 1, 2e, 2r & 3: 23 ,,,��.S�ONALE. `, Max Cantilever = Max Span * 1 24"* I 8" D. Chad Godwin, PE 'aEE�'EE7 Splice Bar 10 p (3)= (3)= 15:24:53 Roof Tech Mini's 139 R3 Chad@godwineng.com ao A.E ,Ro op� Quick-Mount Mids 44 �00�06- Quick-Mount Ends/End Caps 28 Max cantilever is 10.66" as per manufacturer spec. 6x6 J-Box I Zone 1 & 1':Max Cantilever = Max Span * (3)=32"*(3)=10.66" Combiner 2 „ SUNTEC Quick-Mount Ground Lugs 7 Zone 2 & 3:Max cantilever is 5.33 as per manufacturer spec. QPEAKDUOBLKML G10+ 395W 29 Max Cantilever = Max Span * (3)=16"*c3)=5.33" Makinkyour Solar Ua7 nr.rhler!^ 7300 Bryan Dairy Rd STE 400 Enphase IQ7-60-2-US 29 Customer Info: Seminole, FL 33777 60A Fused Disconnect 1 Inverter Type: Enphase IQ7-60-2-US 727-571-4141 40A Fuses 2 PV Panel: (29) QPEAKDUOBLKML G10+ 395W 20A Breakers 2 Racking: Q-Rail Light Frances Levy Date: 11/18/2021 Enphase Combiner Box 1 Total Wattage: 111455W 8405 Fort Walton Ave Drawn by: AN Roof Type: Composition Shingle & EPDM Fort Pierce, FL Revised by: Wind Load: 0 to 20 Deg 34951 Rev #: 00 Fastener Type: Use (2) M5 x 60mm SS Lags Rev Date: Page: S-1 A powered by MECHANICAL SPECIFICATION Format 74.0in x 41.1in x 1.26in(including frame) (1879 mm x 1045 m m x 32 mm) -o°(15-) L5.8°(395.5 mm) aze•(laee mm) Weight 48.5lbs(22.Okg) Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass with =49.2'(126omnu anti-reflection technology 4xro°am � c ~ 1 e r-a 0.18"(4.5 mm) F.- Back Cover Composite film 39.2"(B98mm) Frame Black anodized aluminum ® 411'(1045 mm) Cell 6 x 22 monocrystalline Q.ANTUM solar half cells Junction Box 2.09-3.98in x 1.26-2.36in x 0.59-0.71in (53-101mm x 32-60mm x 15-18mm),IP67,with bypass diodes ebe1� z49.z u260mm) Cable 4mm2 Solar cable;(+)>_49.2in(1250mm),(-)>_49.2in(1250mm) �� 8.Dr°Ireg°nm« 4x M°um slots(DETAIL A) _ Connector Staubli MC4;IP68 I �r1.2.'I-mm) DETAILA O.fi3'I18mm) I� 0.9fi"(29.6mm)I�ID.33'ia.5 mm) . • : , ELECTRICAL CHARACTERISTICS POWER CLASS 385 390 395 400 405 I , MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5W/-OW) Power at MPP' PMPP [W] 385 390 395 400 405 9 E Short Circuit Current' Ise [A] 11.04 11.07 11.10 11.14 11.17 YR ' Open Circuit Voltage' Voc IV] 45.19 45.23 45.27 45.30 45.34 • ' ® Q E ' E Current at MPP ImPP [A] 10.59 10.65 10.71 10.77 10.83 TOP BRAND PV / •° ' Voltage at MPP VMPP [V] 36.36 36.62 36.88 37.13 37.39 ' Efficiency' rl [%] >_19.6 >_19.9 >_20.1 >_20.4 >_20.6 EUROPE 2021 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,IWarranty QCELLS Power at MPP PMPP [W] 288.8 292.6 296.3 300.1 303.8 Product&Performance Yield Security E Short Circuit Current Isc [A] 8.90 8.92 8.95 8.97 9.00 E Open Circuit Voltage Voc IV] 42.62 42.65 42.69 42.72 42.76 E BREAKING THE 20/°° EFFICIENCY BARRIER Current at MPP IMPP [A] 8.35 8.41 8.46 8.51 8.57 Q.ANTUM DUO Z Technology with zero gap cell layout voltage at MPP VMPP [V] 34.59 34.81 35.03 35.25 35.46 boosts module efficiency up to 20.9%. 'Measurement tolerances PMPP±3%;Isc;Voe±5%at STC:1000W/m2,25±2°C,AM 1.5 according to IEC 60904-3.2800 W/m2,NMOT,spectrum AM 1.5 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY ,_ °o x,� -� ----, u x At least 98%of nominal power during - Q CELLS is the first solar module manufacturer to pass the most comprehen- z '° °m'ry�aba"`°"'�'wa^a"� I I I I w w first year.Thereafter max.0.5% z 23 .° --------------- degradation per year.At least93.5% z,00 QO sive quality programme In the industry:The new"Quality Controlled PV"of w a of nominal power up to 10 years.At - �JP the independent certification institute TOV Rheinland. >Zleast 86%of nominal power up to w `a� w °O 25 years. eo _L___1___J____I____t z �zo g INNOVATIVE ALL-WEATHER TECHNOLOGY o as All data within measurement toleranc- so es.Full warranties in accordance with 80 Optimal yields,whatever the weather with excellent a the warranty terms of the Q CELLS 200 soo Boo Boo 1- IRRADIANCE(\N/m°] low-light and temperature behavior. o w sales organisation of your respective o ° a w as :° country. ° YEARS Typical module performance under low irradiance conditions in o �oe>"4vi�2olal�n" rn�o°,wia) ? _ ENDURING HIGH PERFORMANCE comparison to STC conditions(25°C,l000w/m2) D Long-term yield security with Anti LID Technology,Anti PID M 9- y y gyp TEMPERATURE COEFFICIENTS o Technology',Hot-Spot Protect and Traceable Quality Tra.QT"^. Temperature Coefficient of 15c a [%/K] +0.04 Temperature Coefficient of Voc p [%/K] -0.27 2 Temperature Coefficient of PMPP y [%/K] -0.34 Nominal Module Operating Temperature NM °F] 109±5.4(43±3°C) EXTREME WEATHER RATING o High-tech aluminum alloy frame,certified for PROPERTIES FOR SYSTEM DESIGN ° high snow(5400 Pa)and wind loads(4000 Pa). Maximum System Voltage Vs s [V] 1000(IEC)/1000(UL) PV module classification Class II o N Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 A RELIABLE INVESTMENT u E� Max.Design Load,Push/PUI13 [Ibs/ft2] 75(360OPa)/55(2660Pa) Permitted Module Temperature -40OF upto+1850F o Inclusive 25-year product warranty and 25-year 3 2 on Continuous Duty (-40°C up to+85°C) \\l\l Max.Test Load,Push/Pull [Ibs/ft] 113(540OPa)/84(4000Pa) linear performance warranty2. 'See Installation Manual 'APT test conditions according tolEC/TS62804-1:2015,method A(-150OV,96h) QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION 2 See data sheet on rear for further information. o UL 61730,CE-compliant, r��N ch/I rWVI Ib 63'� O d Quality Controlled PV-T30 Rheinland, ��® I�bV°.-1 `NW�1 I�Ib°,J p1. (--p-1 I4D,Rol Epp o IEC 61215:2016,IEC 61730:2016, THE IDEAL SOLUTION FOR: u.s.Patent No.9,893,215(so lare'.a), avRna°.°a Horizontal 76.4in 43.3in 48.0in 16561bs 24 24 32 - oCPVCertificationon9oin9. CD°..e4US packaging 1940mm 1100mm 1220mm 751kg pallets pallets modules (110 Rooftop arrays on UL 61730 iD;,;;2`z zi1o. residential buildings Note:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. CELLS Hanwha CELLS ,Inc. Engineered in Germany 400 Spectrum Centerer Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiryQus.q-cells.com I WEB www.q-cells.us Data Sheet Enphase IQ 7 and IQ 7+ Microinverters Enphase Microinverters INPUT DATA(DC) IQ7-60-2-US/IQ7-60-B-US IQ7PLUS-72-2-US/IQ7PLUS-72-B-US Region:AMERICAS Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V The high-powered smart grid-ready Max DC short circuit current(module Ise) 15 A 15 A Overvoltage class DC port 11 11 Enphase Enphase IQ 7 MicroTM and Enphase IQ 7+ MicrOTM DC port backfeed current 0 A 0 A Q 7 and I Q 7 dramatically simplify the installation process while PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit achieving the highest system efficiency. OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak Microinverters Part of the Enphase IQ System,the IQ 7 and Maximum umcontinutput 240 VA 290VA Maximum continuous output power 240 VA 290 VA IQ 7+ Microinverters integrate with the Enphase Nominal(L-L)voltage/ranger 240 V/ 208V/ 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V IQ Envoy'"', Enphase IQ Battery'"", and the Enphase Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Enlighten'"" monitoring and analysis software. Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz IQ Series Microinverters extend the reliability AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms standards set forth by previous generations and Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III undergo over a million hours of power-on testing, AC port backfeed current 0 A 0 A enabling Enphase to provide an industry-leading Power factor setting 1.0 1.0 warranty of up to 25 years. Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6% 97.6% 97.5% 97.3% CEC weighted efficiency 97.0% 97.0% 97.0% 97.0% MECHANICAL DATA Ambient temperature range -400C to+65°C Relative humidity range 4%to 100%(condensing) Easy to Install Connectortype(I07-60.2-US&IQ7PLUS-72-2-US) MC4(or Amphenol H4 UTX with additional Q-DCC-S adapter) Connector type(I07-60-B-US&IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). • Lightweight and simple Adaptors for modules with MC4 or UTX connectors: • Faster installation with improved,lighter two-wire cabling PV2 to MC4:order ECA-S20-S22 PV2 to UTX:order ECA-S20-S25 • Built-in rapid shutdown compliant(NEC 2014&2017) Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) Productive and Reliable Cooling Natural convection-No fans Approved for wet locations Yes • Optimized for high powered 60-cell and 72-cell*modules Pollution degree PD3 • More than a million hours of testing Enclosure Class 11 double-insulated,corrosion resistant polymeric enclosure • Class 11 double-insulated enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor • UL listed FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Smart Grid Ready Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break Complies with advanced grid support,voltage and disconnect required by NEC 690. _ frequency ride-through requirements Compliance CA Rule 21 (UL 1741-SA) Remotely updates to respond to changing UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, grid requirements CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and • Configurable for varying grid profiles NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC • Meets CA Rule 21 (UL 1741-SA) and DC conductors,when installed according manufacturer's instructions. U *The IQ 7+Micro is required to support 72-cell modules. 1.No enforced DC/AC ratio.See the compatibility calculator at httos://enphase.com/en-us/su000rt/module-compatibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. E N P H AS E® To learn more about Enphase offerings,visit enphase.com E N PHASE. To learn more about Enphase offerings,visit enphase.com u �./ ©2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 Data Sheet Enphase IQ Combiner 3 Enphase Networking MODEL NUMBER IQ Combiner 3 X-I0-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy'"printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5%)and optional*consumption monitoring(+/-2.5%). ACCESSORIES and REPLACEMENT PARTS(not included,order separately) Enphase Mobile Connect" CELLMODEM-03(4G/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 CELLMODEM-01 (3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, CELLMODEM-MI(4G based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Enphase The Enphase IQ Combiner 3" with Enphase Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5%). IQ EnvoyTM consolidates interconnection Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. IQ Combiner 3 equipment into a single enclosure and BRK-10A-2-240 Circuit breaker,2 pole, 10A,Eaton BR210 v g BRK-15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 (X-I AM1-240-3) g y BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 Q- streamlines PV and storage installations b EPLC-01 Power line carrier(communication bridge pair),quantity 2 providing a consistent, pre-wired solution for XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) residential applications. It offers up to four XA-ENV-PCBA-3 Replacement 10 Envoy printed circuit board(PCB)for Combiner 3 ELECTRICAL SPECIFICATIONS 2-pole input circuits and Eaton BR series Rating Continuous duty busbar assembly. System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating 125 A Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output) 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Max.continuous current rating(input from PV) 64 A Smart Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy j) Includes IQ Envoy for communication MECHANICAL DATA and control — - -—- —— — — -- --Flexible networking supports Wi-Fi, — Dimensions(W%HxD) 49.5 x 37.5 x 16.8 cm(19.5"x 14.75"x 6,63"),Height is 21,06"(53.5 cm with mounting brackets). • Ethernet,or cellular Weight 7.5 kg(16.5 Ibs) t I I Ambient temperature range -400 C to+461 C(-400 to 1150 F) Optional AC receptacle available for PLC ? bridge Cooling Natural convection,plus heat shield - Provides production metering and optional Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction consumption monitoring Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors •"I 1 60 A breaker branch input: 4 to 1/0 AWG copper conductors IMain lug combined output: 10 to 2/0 AWG copper conductors Simple Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. — I Reduced size from previous combiner Altitude To 2000 meters(6,560 feet) Centered mounting brackets support single INTERNET CONNECTION OPTIONS stud mounting Integrated Wi-Fi 802.11b/g/n • Supports back and side conduit entry Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) • Up to four 2-pole branch circuits for 240 VAC Cellular Optional,CELLMODEM-01 (3G)or CELI-MODEM-03(4G) or CELLMODEM-M I(4G based LTE-M) plug-in breakers(not included) (not included) • 80 Atotal PV or storage branch circuits COMPLIANCE Compliance,Combiner UL 1741 CAN/C Reliable 47CFRSPart 15,Class B,ICES 003 Production metering-ANSI C12 20 accuracy class 0.5(PV production) • Durable NRTL-certified NEMA type Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 3R enclosure U • Five-year warranty *Consumption monitoring is required for Enphase Storage Systems. o ` UL listed To learn more about Enphase offerings,visit enphase.com LISTED E N P H AS E ©2018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. E N P H AS E® To learn more about Enphase offerings,visit enphase.com 2018-09-13 �m� f P QRai [" — Fully Integrated Mounting and Racking System Fast, Simple Installation : It Just Clicks The QRail Series is a strong and versatile solar array mounting system that provides unrivaled benefits to solar QCIickTechnologyTM designers and installers. Combined with Quick Mount PV's industry-leading waterproof mounts, QRail offers a The universal mid and end clamps use patented QClick r- v1. complete racking solution for mounting solar modules on any roof. technology to simply"click" into the rail channel and _ remain upright, ready to accept the module.The - Easily design array configurations with the QDesign software pre-assembled clamps fit virtually all module frames and it J« application. Generate complete engineering reports and calculate require no extra hardware, eliminating pre-loading and , ti! a precise bill of materials for all the mounting, racking and reducing installation time. UNIVERSAL END CLAMP UNIVERSAL BONDED MID CLAMP • accessories needed for a complete solar array. 2 2 clamps for modules from 2 clamps for modules from 30-45mm or38-50mm thick 30-45mm or38-50mm thick click! Comprehensive, One-Source Solution Installing is as easy as 1-2-3 QRail, together with Quick Mount PV's waterproof mounting products, provides the benefit of a single-sourced, QSplice"Technology seamlessly integrated rooftop installation that works with all roof types — composition/asphalt shingles, QRail's innovative internal QSplice installs in seconds, requiring no flat or curved tile, metal shingle, shake, slate and low slope roofs. The QRail system also works with any roof tools or screws. Simply insert QSplice into the rail and slide the other _ rail on to create a fully structural, bonded splice.An external splice is QSPLICE attachment system for maximum flexibility. also available. 1 - Superior Strength and versatility QRail is engineered for optimal structural performance. The system �r - is certified to UL 2703, fully code compliant and backed by a 25-year HEAw '' Installs in se — erequired warranty. QRail is available in Light, Standard and Heavy versions to -match all geographic locations. QRail is compatible with virtually all STANDARD - Fully Integrated Electrical Bo n d i n g IGMT modules and works on a wide range of pitched roof surfaces. Modules The QRail system provides an integrated electrical bonding path, ensuring that all exposed metal arts and QRails come in two lengths— y P g g P g p p can be mounted in portrait or landscape orientation in standard or 168 inches(14 ft)and 208 inches(17.3 ft) the solar module frames are electrically connected. All electrical bonds are created when the components are shared-rail configurations. Mill ond Block Finish installed and tightened down. GODWIN ENGINEERING AND DESIGN, LLC 8378 Foxtail Loop,Pensacola, FL 32526 1 (850)712-4219 1 chad@godwineng.com November 23,2021 To: St. Lucie County Building Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Re: Levy- Residential PV Roof Mount Installation 8405 Fort Walton Ave Fort Pierce, FL 34951 Plan Reviewer, This letter is regarding the installation of a new roof mounted Solar PV System on the existing residential structure at the address above.I have reviewed the attachment plan and have determined that the roof mounted PV system is in compliance with the applicable sections of the following Codes as amended and adopted by the jurisdiction: 2020 Florida Building Code 7th Edition,FBC ASCE 7 Min. Design Loads for Buildings&Other Structures Per 2020 FBC,the Roof Mounted PV system will be subject to the following design criteria: Design Wind Speed(V„lt) - 160mph 3sec gust, Exposure Category- C The PV System consist of the modules,railing,and connection hardware.The system will add a dead load of approximately 3 psf to the roof. The existing roof covering is Asphalt Shingle with min. Y2"plywood decking and 2"x 4" roof trusses 24" O.C. The roofing,decking,and roof trusses are in good condition.The existing structure will be adequate for supporting the additional PV dead load and wind loads. The securement method of the PV system is to be flush mounted to the asphalt shingle roof with the Q-Rail Light railing and flashings/attachments.The attachments can be attached up to 24"apart in roof zones 1, 2e, 2r,&3.The mounts should be staggered,where possible,to allow distribution of the design loads evenly to the structure.The mounts shall be installed using(2) M5 x 60mm stainless steel Lag bolts. Please see attached documents and contact me should you have any questions. Donnie C , Sincerely, Godwin No 81360 =,;. *: D. Chad Godwin,PE 81360 202 1 .1 1 .23 -O�c <oq (.(', Exp. 02/28/2023 5:25:08 ''SS'ONAIEN '00'06- ANI 00 ASCE 7-16 CHAPTER 29 WIND LOADS-Rooftop Solar Panels Minimum Design Loads-Part 1:Enclosed(Gable,Hip,Flat h<60ft,0°<6<45°) Wind Load Parameters-Inputs Wind Load Paramaters Risk Category II Table 1.5-1 Wind Speed(asd) 124 mph FRC R301.2.1.3 Basic Wind Speed(1 160 mph Figure 26.5-1B Effective Wind Area 21.28 It' 26.20 Roof Angle 8'to 20' Wind Directionality Kd 0.85 Table 26.6-1 Roof Type Hip Topographic factor Ka 1.00 26.8 or 26.8.2 Exposure Cat. B,C,or D C Section 26.7 Ground Elevation Factor KQ 1.00 Table 26.9-1 Mean Roof Height h 15.00 ft Velocity Exposure Coefficient Kr 0.85 Table 26.10-1 Roof attachment RT-Mini 60mm to Rafter Array Edge Factor YE 1.50 29.4.4 "Modules are considered Exposed Rafter/Truss Spacing 24 in O.C. Solar Panel Equalization Factor j, 0.67 Fig.29.4-8 No.of Rails 2 Velocity Pressure qh 28.41 psf qn=0.00256 K,K„Kki No.of Modules-Portrait 4 Added Safety Factor 1.2 No.of Modules-Landscape 14 Allowable Pullout per mount 569.0 Ibs Module Model Number Chi DUO ML-G30+ 0.4h or 0.6h 6.00 ft Flat-0.6h,Gable,Hip-0.4h bldg.least horizontal dim(typ.) 180 10%of least horizontal dim 1.50 ft 1D%orlepnnor.Dlm.-Ah,wmme.eri::maoec but Pp1-man either4%ofI-Ahor.or Elevation <1000 ft Roof Zone Set Back a 3.00 ft arc.(na)roof-D.6h) Est.#of attachment points 139 h2 5 In Na>unp(p-lnelghfa-roof) PV Dead Lood Module and Racking Slim 2hz 30 in mlp di-array,nali be from me rom edge Gable Rdfge or hlpi-ii #of Modules 18 Dimensions,LxWxH(in) 74 x 41.1 x 1.26 0.25 in - rw- cis der Hof 1c7ft Module Wmm 49 Ibs Width ft all 1.00 ft eor,:ortai d�.ea�reo g p el edge Array Wmo 873 Ibs Length ft d2 0.25 ft eoo:omai d�.fa�re from g p-lm me pearen edg-me Pena row Micro/optimizer W- 72 Ibs Module Area r2pl.28 Ft` O.Sh 7.50 ft *modwes.refoeid-.pored th-r-hm z.sip from-edge PV Rail Ww rA 20 Ibs Module load ratings Notes Total Weight WN.I 965 Ibs Ultimate Allowable Total Area AT 382.95 ftz Load Rating-Snow(psf) 1 113.4 1 75.6 Eq.1 Point Load=Roof Zone psf TA Dead Load Dp„ 2.52 psf Load Rating-Wind(psf) 784 -56.0 Eq.2 TA=(Module Length/2)*Max Span Weight/attachment 6.9 Ibs Eq.3 'Max span Equation,SF=Allowable pullout/Point Load PVAttachment-Results Eq.4 Max Span=Allowable Pullout/(SE-Roof Zone psf•L/2) Roof Zones-Hip 1 2e 2, 3 a)The Max span between attachment points must not exceed the rail spans provided by racking manufacture. GCp-Upliftg-13 -1.7 -1.7 -1.7GCp Down .7 0.7 0.7 b) Allowable Module load ratings are determined by SF=1.5 Pgh(GCP)(7'E)�_"; 5.9 -45.9 -45.9 psf 29.4-7 P=gn(GCp)(7'EI(y,) 0.0 20.0 20.0 psf 29.4-7 Max Allowable Span2 2 2 R 'notes 8 8 8 Max span 33%(in) Donnie C �;CENs�.,�i`'� "° 8136° Godwin 2021 .11 .23 �0�• STATE OF ° 1 15:25:17 THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY DONNIE CHAD DATE.PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES ASCE 7-16 CHAPTER 29 WIND LOADS-Rooftop Solar Panels Minimum Design Loads-Part 1:Enclosed(Gable,Hip,Flat h<60ft,0*<6<45*) Wind Load Parameters-Inputs Wind Load Paramaters Risk Category II Table 1.5-1 Wind Speed(asd) 124 mph FRC R301.2.1.3 Basic Wind Speed(Ult) 160 mph Figure 26.5-1B Effective Wind Area 21.28 It' 26.20 Roof Angle 0`to 7' Wind Directionality Kd 0.85 Table 26.6-1 Roof Type Flat Topographic factor Ka 1.00 26.8 or 26.8.2 Exposure Cat. B,C,or D C Section 26.7 Ground Elevation Factor K* 1.00 Table 26.9-1 Mean Roof Height h 15.00 ft Velocity Exposure Coefficient Kr 0.85 Table 26.10-1 Roof attachment RT-Mini 60mm to Rafter Array Edge Factor yr 1.50 29.4.4 *Modules are considered Exposed Rafter/Truss Spacing 24 in O.C. Solar Panel Equalization Factor j, 0.67 Fig.29.4-8 No.of Rails 2 Velocity Pressure ch 28.41 psf qn=0.00256 K,K„Kki No.of Modules-Portrait 11 Added Safety Factor 1.2 No.of Modules-Landscape 0 Allowable Pullout per mount 569.0 Ibs Module Model Number Chi DUO ML-G30+ 0.4h or 0.6h 9.00 ft Flat-0.6h,Gable,Hip-0.4h bldg.least horizontal dim(typ.) 180 10%of least horizontal dim 1.50 ft m dl-hor.oim.oro.dn,wmmever::maoec butnvJ-man either4%duarthor.or Elevation <5000 ft Roof Zone Set Back a 9.00 ft art.Inar rod-o.6hl Est.#of attachment points 44 h2 5 in rva>ioip(p-1 heignfah-oor) PV Dead Load Module and Racking Spm 2hz 30 in mm di-arrar,naii be from merod edge Gable R,dge or hiprii #of Modules 11 Dimensions,LxWxH(in) 4 x 41.1 x 1.26 0.25 in mp rw- cis der nof>s.7ft Module Wmpd 49 Ibs Width �27� .45 ft all 1.00 ft eor,:ornai d,.ea�reo g ip ei edge Array Wmod, 534 Ibs Length .17 ft d2 0.25 ft rvorao*fai d�.fa*re I- g p-im me pearen edg-me pearow Micro/optimizer Wmir 44 Ibs Module Area .28 ft` O.Sh 7.50 ft *moawes.re�op:iaeree.po::e ma.rewrtnm z.sip rrom rod.eg. PV Rail Ww rm 9 Ibs Module load ratings Notes Total Weight W,dl 586 Ibs Ultimate Allowable Total Area Ar 234.03 ftz Load Rating-Snow(psf) 113.4 75.6 Eq.1 Point Load=Roof Zone psf*TA Dead Load D,, 2.530 psf Load Rating-Wind(psf) -84 -56.0 Eq.2 TA=(Module Length/2)*Max Span Weight/attachment 13.3 lb s Eq.3 *Max span Equation,SF Allowable pullout/Point Load PVAttachni-Results Eq.4 Max Span=Allowable Pullout/(SF*Roof Zone psf Roof Zones-Flat 0°to 7" 1. 1 2 3 a)The Max span between attachment points must not exceed the rail spans provided by racking manufacture. GCp-Uplift -0.9 -1.7 =-213 -3.2GCp Down 0.3 0.3 b) Allowable Module load ratings are determined by SF=1.5 p=ghlGCollygl�yal -23.1 -46.0 psf 29.4-7 =gnIGCpIIyrl(y,) 8.6 8.6 psf 29.4-7 Max Alloable Span 6 2 R *notes Max Cantilever(in) 24 8 8 Max span*33%(in)