HomeMy WebLinkAboutPERMIT DOCUMENTSCAUTION- POOL/SPA REFINISHING OPERATIONS
During pool refinishing or acid cleaning, the water flow through the heater must
be shut off. Water {low to the heater must remain off until water chemistry is once
again in balance and the water is clear in appearance. Failure to follow these in-
structions may void heater warranty.
CONTROL IRRIGATION AND STORM RUNT OFF
• Control Irrigation: Irrigation water spray can damage heater components.
Regardless of water quality, it is important that irrigation be directed
away from the heat pump.
• Prevent rain water runoff from pouring directly into the heater.The heater is
designed to withstand normal rainfall, but solid streams of water from roof
drip-Iines may eventually damage heat pump components.
• If the heat pump resides beneath a roof edge, to promote heat pump longevity,
.a rain leader (gutter), or rain shield, will be necessary.
MAINTAIN PROPER CLEARANCES AROUND HEATER
• For maximum efficiency, proper air flow clearances around heater must be
maintained. .
• It is important to keep the area immediately adjacent to the heat pump clear
of items such as shrubs and bushes, lawn furniture, chemicals containers. etc.
These items can prevent air from circulating fully through the heater, and will
result in inefficient operation or damage to the heat pump.
• In addition, do not place objects on top of the heat pump; doing so will block
the air from exiting the heater, and will result in damage to the compressor
and fan motor.
• Proper clearances are also necessary in order to access the heater for service.
Gan
C
FR!
1 12"
AIR
COIL BASK
0
' 12' FRONT 12
TOP VIEW 10
PERMIT # ISSUE DATE
PLANNING & DEVELOPMENT SERVICES
Building & Code Compliance Division
BUILDING PERMIT
SUB -CONTRACTOR AGREEMENT
R Thompson Electric have agreed to be
(Company Name/Individual Name)
the Electrical Sub -contractor for Tryon Plumbing
(Type of Trade) (Primary Contractor)
For the project located at 5006 Sunset Blvd
(Project Street Address or Property Tax ID #}
It is understood that, if there is any change of status regarding our participation with the above mentioned
project, the Building and Code Regulation Division of St. Lucie County will be advised pursuant to the
filing of a Change of Subcontractor notice.
CoN"TRACTo IGNA-fuRE er) S B-ONT OR SIGNATURE (Quai.er)
Robert Tryon
PRINT NAME
CFC058068
COUNTY CERTIFICATION NUMBER
State of Florida, County o, St Lucie
The foregaing instrument was signed before me this 15 day of
November ,,Ay Robert Tryon
who is personally knows Wlr has produced a
as idenfificati
STAMP
tgna a of Notary Public
Melissa L Butterfield
Print Name of Notary Public
Robert Thompson
PRINT NAME
EC13007306
COUNTY CERTIFICATION NUMMER
State of Florida, County of St Lucie
The foregoing instrument was signed before me this 15 day of
November ' 20-21 by Robert Thompson
who is personally known r has produced a
as identill tian.
T7 STAMP
V1gnatu n o ry Pu
Melissa L Butterfield
Print Name of Notary Public
HIER
ate of Florida
erf'elq ed" ^rdyNotary Public State of Flonda GG 302065 Mellssa l Butterfield23 'y My Commisaiori GG 30T065 ~4oFw+?' cxpves021412023
Revised 11ns;2016
.T e
I
. - - .1.i.." � =. �`r� • � is
• +►• a 4i1t. F•r.
..'01
Am
16-16
slow
`-t'��
+w•i�Moovia
•
t
+.Play of
Me
.
+k_pad
VON
A�6 jf'��
1
Juliano Faleiros
5006 Sunset Blvd
Ft Pierce, FI 34982
f
? t
1'
2$ 28 ova
OAS (392 )
(1008 )
1D
24
2 #6 THHN
1 #10 THHN
Run through attic %" smurf to house panel
Bond pool heater to pool pump
Sol #8 bond wire
60 amp breaker