HomeMy WebLinkAboutAPPROVED, HARTMAN PG5ST. LUCIE WORKS
Section A (General information)
Master Permit N0,
Process No,
Contr�ttors Name. ti , License H
Job Address
0 Low 51ope
❑ Asphaltic Shingles
❑ New roof 0 Repalr
tow Slope Roof Area (SF)
ROOF CATEGORY
❑ Me nically Fastened Tile 0 MortarfAdhesive Sex Tiles
F. etal Panel/Shingles Mood Shingles/Shakes
0 Prescriptive BUR-RA-5 150
ROOF ROOF TYPE.
❑ Maintenance Reroofing
ROOF SYSTEM INFORMATIp f
Steep Sloped Roof Area (SF) �j 1
❑ Recovering
Total ff,
Section B (Roof Plan)
Sketcfi Roof Plan; Illustrate all levels and sections, roof drains, scuppersr overflow scuppers and overflow drains.
Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and Iacatlon of parapets.
C: '_:I::�000CCCC1C:C1
i�ii����■i�i���i�ii��,
� ia'iiiii���i� ■% irr�
NEON= M
0 IN Room
ii MiiiiEl
MMMINE■w■uME■M ■ ■