HomeMy WebLinkAbout Engineering N ®5 ti022
BENCHMARK ENGINEERINU
petm n�n9
OF TIME TREASURE COAST I.I.G.
806 Delaware Ave. (772) 267-1399
Fort Pierce, FL 34950 bench markensineerinatc@smail.com
1/3/22
Re: Permit# SLC-2107-0549
Certification of Inspection—After The Fact Garage
Widner Residence
4871 Jorgensen Road
Fort Pierce, FL
Dear St. Lucie County Building Official:
Please be advised that Benchmark Engineering has approved the following inspections at the
aforementioned location and herby certifies that the construction is in substantial compliance
with FBC2020 and plans produced by Benchmark Engineering. Inspection dates and field notes
are provided and attached hereto. Voluminous photos were obtained from the owner during
construction and also taken during the inspections. Photos shall be retained at Benchmark
Engineering.
Thank you for your diligence and please feel free to contact me at(772) 267-1399 with any
comments or concerns that you may have.
Sincerely,
Digitally signed by Bowdoin G.
Bowdoin G. Hutchinson'==,,Hutchinson
Date: 2022.01 .03 17:13:02 -05'00'
Bowdoin G. Hutchinson P.E.
\\\\I I'll III/////,i
p0\N G.
vo •''��� '•,cyy This item has been electronically signed
_ N and sealed by Bowdoin G. Hutchinson, P.E.
087 = using a Digital Signature and Date. Printed
copies of this document are not considered
of signed and sealed and the signature must
'c40RIDA ,-'•aAp be verified on any electronic copies.
L
[Ill .
Inspection Date of Method of Inspection, Notes Result
Inspection
Request Exemption per Section 1803.2; Garage is
104 Compaction Test N/A Approved
built adjacent to existing home w/no fill added
121 Temite Spray 3/1/18 Owner to provide Certificate of Termite Approved
Treatment
116 Mono Pre-Pour 12/27/21 Review of owners photos:#5 rebar per plan Approved
140 Const. Rough Framing 12/28/21 Visual,cut sample view port thru drywall &review Approved
owners photos
141 Insulation 12/14/21 Visual, R-30 batt ceiling Approved
Visual,drywall &reviewed owners photos,
148 Window/Door Attach 12/29/21 Approved
conformed w/NOAs
Visual,cut sample view port thru drywall&review
650 Frame-All 12/28/21 owners photos,conductors inspected @ rect.& Approved
switches
133 Window/Door Bucks 12/29/21 Visual, removed sample partial trim, back out ws Approved
&reviewed owners photos
Visual, removed partial 5-V,5/8" CDX w/clips
134 Roof Sheathing 12/14/21 modified bitumen underlament, 10D coil @ 4" OC Approved
all,in truss cords w/Zircon MT 6 Metal Detector
Visual,cut sample view port thru drywall&review
135 Wall Sheathing 12/28/21 owners photos, 12D @ 4" OC w/Zircon MT 6 Approved
Metal Detector
145 Truss DRWG 12/14/21 Visual &review owners photos, HTS 16s field, Approved
LSTA gable @ 48"OC
167 Roof Final 12/14/21 Visual, removed#9 self sealing screws Approved
280 Electrical Final 12/28/21, Visual, removed sample recpt.&switch plates, Approved
1/3/22 trip test all GFI, Reinspected; Replaced (1)GFI
993 Final Site Survey N/A Previously provided to SLCBD(on file) Approved
999 Final Inspection 1/3/22 As noted Approved
I