Loading...
HomeMy WebLinkAboutKSM Soil Compaction ReportHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #:2200050-1d/JM/ct NUC #215 Nuc Model:MC-1DR-P Nuc Serial #:MD80404215 2701 Navajo Avenue Ft. Pierce, Florida Garage Pad DEPTH PEN READ DRY DENSITY MAX. DRY PROCTOR VALUE (P.C.F) PERCENT COMPACTION 1 S.E.0" - 12"14D 106.7 107.0 99.7% 2 S.W."14D 106.2 "99.3% 3 Center "14D 106.4 "99.4% 4 N.W."13D 103.9 "97.1% 5 N.E."13D 104.8 "97.9% Proctor Optimum Moisture: Proctor Max. Dry Density: P.C.F. @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets 1/4/2022 Email to: gilberto.arbelo@gmail.com PE # 68366 Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Soil Description: JOB LOCATION: PERMIT #: CONTRACTOR:Gilberto Arbelo 2109-0559 Julie E. Keller, P.E. President Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Respectfully Submitted: ITEM TESTED: 107.0 TEST LOCATION OF SAMPLE Proudly Serving Florida since 1990 Disclaimer:Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test.KSM is not responsible if the tested area has been altered from the approved inspected condition. SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 January 3, 2022DATE TESTED: 2.9% 9.0% Brown/Gray Sand Certified Women Owned Business - WBE Minimum Requirement for Staked Foundation In Place Moisture: 102.0 103.0 104.0 105.0 106.0 107.0 108.0 4 5 6 7 8 9 10 11 12 W E I G H T P . C . F . D R Y Moisture -% of Dry Weight