Loading...
HomeMy WebLinkAboutCreekside Lot 125 Code 137 1.3.22.pdfA Universal Engineering A SGeness Company INSPECTION RESULTS �c1K� Inspection Date: 3 202 Permit No. "OW3 Project: iGF ?/G% Peree Address: 96/6 %l lu'(AC- t�2• 119f I �W Check one: ❑ Regular inspection: Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -in Slab Floor Rough -in Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural X Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Ughting Protection Equipment E uipment Re -inspection Re -inspection Re -ins ection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: l Area inspected ode: (COGE /37 I Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ), DP -Disapproved ❑ Not Ready Conditions/Comments 1. P/Z5l�i0U5 Gl�,ese[6(r/5 fJAr2� .(roT E.-(l �4Y75fiE1� 2. 3. 4. 5. 6. 7. 71 7 Inspectors Name: �&�4V C. htIA11WI� Lic.p: OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 - (772) 924-3580 (fax) www.teanifa.com