Loading...
HomeMy WebLinkAboutENGINEERING - STRUCTURAL OPINION LETTER USA Engineering, LLC • 2818 Cypress Ridge Blvd. • Suite 110 • Wesley Chapel, FL 33544 • Office: (813) 994-0365 Date: October 20, 2021 Britnee Zimmerman Smartlink Program Manager USA Engineering, Inc. 2818 Cypress Ridge Blvd., Suite 110 Wesley Chapel, FL 33544 (813) 994-0365 Subject: Structural Opinion Letter T-Mobile: USA Engineering Designation: Site Number: Site Name: Project Number: A2P0322M SFL247-3_595 – Hutchinson Island Club A2P0322M Site Data: Dear Ms. Zimmerman, 10410 S. Ocean Drive, Jensen Beach, FL, St. Lucie County Latitude: 27° 16' 26.0”, Longitude: -80° 12' 30.0” 110-Foot-Tall Building USA Engineering have been requested to perform a structural evaluation of T-Mobile’s antenna and equipment installation with regards to its impact on the existing elevated platform and existing building located at the above- referenced address. The evaluation is based on the following information: Documents Remarks Date Source  Construction Drawings Rev 1 10/19/2021 USA  Mount Analysis (Passing) Mount Replacement Analysis Report 10/5/2021 USA  RFDS Version 6 7/27/2021 Smartlink  Building Drawings Not Available  T-Mobile’s existing rooftop equipment is installed on an elevated steel platform, located on the building roof deck at 110’(±) AGL. The modification to T-Mobile’s platform equipment is as indicated in the table below: Existing   To Be Removed  Proposed   To Be Installed  Battery Cabinet B160 Battery Cabinet  SSC 6160 SSC  CDMA Cabinet ‐  LTE Cabinet ‐  FCOA Cabinet ‐  (3) FRIE, (3) FRLB, (2)  FXFC, (1) Large COVP ‐  USA Engineering, LLC • 2818 Cypress Ridge Blvd. • Suite 110 • Wesley Chapel, FL 33544 • Office: (813) 994-0365 The combined weight of the new T-Mobile equipment being installed on the elevated platform is significantly reduced from the equipment being removed; therefore, it is the engineering judgment of this office that the installation will have no appreciable impact on either the vertical or horizontal loads imposed on the elevated platform or the building roof. Based on the information provided to us at this time, the elevated platform and building roof can support the proposed equipment configuration. T-Mobile’s existing antennas and ancillary equipment is installed on the penthouse wall with a rad center of 120’(±) AGL. The modification to T-Mobile’s antennas and ancillary equipment is as indicated in the table below: Existing   To Be Removed  Proposed   To Be Installed  (6) Antennas (6) Antennas  (3) TMAs, (3) Triplexers (6) RRUs  (6) Existing Wall Mounts (6) WWM01 Wall Mounts  It is the engineering judgement of this office that the proposed antenna and ancillary equipment replacement installation will have no appreciable impact on the penthouse wall. The proposed antenna configuration, with regards to the structural capacity of the proposed mount and wall connections, has been addressed in a separate document. Refer to the Documents table for more information. No conclusions, expressed or implied, shall indicate that USA Engineering has made an evaluation of the original design, materials, fabrication, or potential erection deficiencies. In addition, the conclusions expressed herein are based upon the information contained within the aforementioned documents. Any information contrary to that assumed for the purpose of preparing this evaluation could alter the findings and conclusions as stated. Respectfully submitted by: Marc Maier, P.E. FL PE No: 72513 COA No: 31705 This item has been electronically signed and sealed by Marc P. Maier, P.E., FL License #72513 using a Digital Signature. Printed Copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. Oct 21 2021