HomeMy WebLinkAboutCreekside Lot 5 Code 800 1.5.22.pdfA Universal
3 Engineering
a' Scioncma
r� Company
4) f MI `
INSPECTION RESULTS
Inspection Date: // ��
Project: Cev2e L Sf��
Address: 3 73 / s0�
Check one:
XRegular Inspection:
❑ Reinspection
Permit No. -10 / c J o
Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wail/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type
Area Inspected/Code: MOF/�(
Inspection Results: AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ P-Disapproved ❑ Not Ready
Conditions/Comments
1.
2.
3.
4.
5.
6.
7.
Inspector's Name:
Lic.#:
OFFICES THROUGHOUT FLORIDA
2
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teampfa.corn