Loading...
HomeMy WebLinkAbout21-139A - Bryn Mawr Condos 2021 - Bldg A - Rep 7 - 01.04.22M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139A Report No. 7 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 1 of 2 THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. A 5061 N. HWY A1A, FORT PIERCE, FL 34949 SLC BLDG. DEPT. PERMIT NUMBER: 2106-0405 PROJECT NAME: Bryn Mawr Condominiums Concrete Repairs 2021 – Bldg. A DATE: January 4, 2022 CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: Limited access balconies – Units 302 and 604 OBSERVATIONS: Unit 302 • A temporary weather wall has been placed at the east facing living room SGD. • The owner hired a separate door contractor to remove the SGD. • Corroded bars have been exposed, power tool cleaned, and coated with approved corrosion inhibitor. Unit 604 • Loose stucco was removed from the ceiling adjacent to the living room SGD. • Concrete was sounded and no concrete repairs are necessary. RECOMMENDATIONS: Unit 302 • Remove the temporary weather wall after the SGD is re-installed. • Repair any interior finishes that were damaged by the temporary wall. Unit 604 • Apply new stucco at the ceiling to match the surrounding areas. Contractor to move swing stage to the 06 stack. (At the far south edge of the building.) Repair areas have been marked out for Units 206 & 506. ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139A Report No. 7 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 2 of 2 Pic 1 – Unit 302 Surface spall at living room SGD. Pic 2 – Unit 604 Loose stucco has been removed.