Loading...
HomeMy WebLinkAboutPermit ReviewPermit 2102-0498 Review response 5/ 14/21 1 .See revised A3.2. FOR FILLED CELL SPACING 2. See revised A5.5 FOR CORRECTED PRODUCT APPROVALS Mario Arbucci Coastal Construction and Design, Inc. Permit 2102-0498 Review response 4/ 16/21 1. See new revised survey. 2. See revised FDEP report. 3. See larger fire sprinkler plan. 5 See soil boring report. 7. See revised complete plan set. 8. See Al.1 revised. 9. See Al.1 revised. IO.See revised A3.2. 11. See revised Al.1 12. See revised A6.1. 13. See revised A6.1. 15. See revised Al. 1. 18. See revised FDEP permit. 19. See revised plan. 20. See revised A3.2. 21. See revised A3.2. 22. See revised A3.2. 23. See revised A4.1. 24. See revised A4.1. 26. See revised A4.1 27. Hydro venting deleted. 28. See original truss engineer seal. 29. See revised energy calc's. 30. See revised energy calc's. 31. See revised A5.5. 32. See revised A5.5. 33. See Certification for wind load compliance form. Mario Arbucci Coastal Construction and Design, Inc. RECEIVED APR i b 1011 PQrmiMng Department St. Lucie County `le G�ti << Q� � a �G ao PERMIT 2102-0498 1. HOLLOWCORE SHOP DRAWINGS 2. ENGINEERS INSPECTION LETTER OF HOLLOWCORE FLOOR 2