Loading...
HomeMy WebLinkAboutTrussG VERIFY 2)2X10 LEDGER BY BUTLER. PLEASE VERIFY A L L END DETAIL TO MATCHSTI FLOOR (2)2X10 LEDGER FLOOR TRUSS END DETAIL Denotes approximate location of tub/shower or toliet. Builder to verify locations for truss placement. Dimensions shown for floor truss placement are approximate. 2)2X10 LEDGER BY BUTLER. FLOOR TRUSS LAYOUT Scale: 3/8"=V-0" U Q NOTE: H 1.AI1 walls shown are load bearing unless otherwise noted. Load bearing wall designed by others. (n 2.This drawing is for truss placement only. It is not laid out or placed by truss engineer of record. It's sole purpose is for field installation only. 3.Refer to individual truss design drawings for truss calculations and special loading conditions. 2-0-00 4.Truss designed in this layout for vertical load only. Lateral load designed by Project Engineer. 5.Structural sheathing designed by others. 6.Simpson installation shall be per connector manufacturer's guildelines. All connectors and tie downs, other than truss to girder truss connectors,are to be specified and supplied by others. 7.All truss spacing is 24" O.C.;Otherwise especial noted. 20-00-00 8.All truss bottom need rigid ceiling directly applied or add 2x4 bracing spaced 6'-0" O.C.. 9.Only Truss Reaction >5000# or Uplift >1000# Values Shown On the sealed truss design drawings. REVIEWED FOR -.,ODE COMPLIANCE ; T. L.1.)I E COUNTY socc Pao REVISIONS FOR APPROVAL: 08/17/2021 REV #1: FOR CONSTRUCTION I ROOF LOADING TCLL = PSF TCDL = PSF BCLL = PSF BCDL = PSF TOTAL = PSF DUR. _ FLOOR LOADING TCLL = PSF TCDL = PSF BCLL = u PSF BCDL = PSF TOTAL = PSF DUR. _ WIND SPD,Vult = MPH RISK CATEGORY = EXPOSURE CATEGORY = OCCUPANCY CATEGORY = NET UPLIFTS DEAD LOADS = PSF DESIGN CRITERIA FBC 2020 TPI 2014 Truss member design & connector plates are designed for ASCE 7-16 and maximum forces from both components and claddings and main wind force resisting systems.These trusses have been reviewed to carry an additional 10 psf. non -concurrent bottom chord live load. All wood beams are assumed to be drop or headers U.N.O.. Steel beams supplied by others. FBBO = Flush Beam By Others DBBO = Drop Beam By Others SBBO = Steel Beam By Others N1 : 2x top chord side scab by others,see truss design drawings for details. N2 : Conv. frame overhang by others. THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.These trusses are designed as individual building components to be incorporated into the building design at the specification of the building designer. See individual design sheets for each truss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179. UNIVERSAL TIMBER STRUCTURES 623 West Bridgers Ave, Auburndale, Florida 33823 (863) 965-0213 Telephone (866) 688-7526 Toll Free (863) 967-1082 Fax a)w E U O aJ +j •0 N L. U DESIGNER SCALE JOB # m O � E - •� v W J z C c t\ 0 O O d. v � O U PETER 3/8"=1'-0" J21-0213 MBA # SHEET P21-0246 1of1