HomeMy WebLinkAbout30 day power release0
23
Pax -
Request for SO-D"Tem odrWy: Psis!
Mr. Permirt Wfirnber
Project Adder )17\\
RECEIVED
01"T 17 2018
ST. Lucie County, Permitting
��q
THE uNDtmGNF_D HEREBY REQUEST' RELEASE OF ELE=CAL POWER TO THE ABOVE DEPMSED
PROPERTY, FOR A. PEU01) NOT -TO. �XMP _7HJRTY00) • ()AYS, FOR THE P URPOSE. 6F�I�MSMG SYSTEMS
AND EQUIPMENTINPREPARATION FMAFNALANSPEMON. IN NS6' RMON OF APPROVAL OF THE
REQUBSr WE-MBOY AYLEDGE ANC) AGREE AS FOLLOWS'
1. 'This trip mry power rekase is requested 1br tie aWve stated ptmose only, and there vA he no
cnUmnty of any type, 60ier than that Oernfitted by toisMxton 'during this firno Pen6d.
Z. AS witness by oUr!0qn40�rOs, We hereby :agri? tb abide by all,W.M arfco�ditionis Of this agr4emerit,
incitichiig Building' Division Policy, which is ln06r'P,6raW* herein Ice.
3. AM conditions.'and iretvireindrft llstjed in the;i=L4ed document entitILd, Nequirements. -for 30 Day
Power forTestifigm have'beiin fulfflled'6nd th6 premise is ready for complibnte Inspection.
4. All ripquestg for air edension beyond 30 days -must bt: made In wtilIng to the, RkAding bffidal sating
he reason' for th* refire, � pow Maybe removed:from the site, ancf/br a $to..ftrkldrdiar issued if
-sioo.60 will be required to lift
the khal:MspecUori hat riot Seen approved within 36days, A fee Of
the Stbp work Order.
WE KERMY RELEASE -AND AGME TO HOLD HARMLESS,,ST. LUCIE COUNW, AND TH EMP mom
i
EMI
ALL LIAe=ES AND CLAIMS -OF ANY TYPE..6F'NAT-JJ9E VLOUCH KAY ARTSENOW OR imj7ME FUTURE OUT
DAMA U.E- TO M
Or TKS-1V. NSACTION, INCLUDMA- KY GE -WHICH. BE lkUiM�D:'
'O
74. EVEW, bF VidEAMON 7 7MIS AGREEMEM
HE
DEW , NECftON (r 0�� PQWEk 1�
OwNeR, DATE
MfRACM DATE
������
LZC-� ZOOO/ZOOOd 869-1 999L8L8ZLL
Wodi Lti: L L 8 L -L H L