Loading...
HomeMy WebLinkAboutSystem Construction PlansLOCATION SKETCH PARCEL ID#(s): 2311-411-0004-000-1 KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. www.calisunshine.com VICINITY SKETCH CIVIL SITE PLAN N.T.S. (FOR REFERENCE ONLY) F.D.E.P. EG2#15 EQUIPMENT DESCRIPTION MANUFACTURER / MODEL I. DOUBLE -WALLED UNDER6ROUND STORAGE TANKS XERXE5 DIMT-III 200 2. DOUBLE -WALLED PRODUCT PIPE APT XP 618 5. VENT PIPING NOV DUALOY 5000 241 4. V 15PENSER 5UMP5 APT LMM-561'7-56 425 5. 5TP 5UMP5 - SINGLE WALL FIBER6LA55 PETROLEUM CONTAINMENT INC. PC455OU-502 205 6. DOUBLE -WALLED 5PILL BUCKET5 OPYV EDGE I0-5112D (FILL); I0-5112P (VAPOR) 108 I. MECHANICAL LINE LEAK DETECTOR FE PETRO STP-MLD-6, 5TP-MLD-D 555 8. OVERFILL PROTECTION SYSTEM OPW '7150-410-C 6q11 a. LEAK DETECTION CON50LE FRANKLIN FUELING 5Y5TEM5 T5-550 EVO 652 10. D15CRIMINATIN6 TANK SUMP LEAK SENSOR FRANKLIN FUELING 5Y5TEM5 FMP-DT5 652 11. DI96RIMINATIN6 D15PEN5ER SUMP LEAK 5EN50R FRANKLIN FUELING 5Y5TEM5 FMP-DD5 652 12. TANK LEVEL INVENTORY MONITORING PROBE FRANKLIN FUELING 5Y5TEM5 FMP-LL5-151 652 15, TANK INTER5TITIAL LEAK SEN50R FRANKLIN FUELING SYSTEMS FMP-HI5-XL 652 PETROLEUM STORAGE AND DISTRIBUTION SYSTEM CONSTRUCTION PLANS Wawa #5380 (ORN ' ) Orange Ave. & Kings Hwy. (S.. APPLICANT: WAWA, I N C 7022 TPC DR., SUITE 200 ORLANDO, FL 32822 (407) 408-6177 CONTACT: Scott Kearney, P.E. EMAIL: Scott. Kearney@wawa.com stillwater TECHNOLOGIES St. Lucie County, PETROLEUM ENGINEER: STILLWATER TECHNOLOGIES, INC. 1700 N, ORANGE AVE:., SUITE 100A ORLANDO, FL 32804 (407) 206-7222; FAX (407) 206-7223 CONTACT: Rick Blecha, P.E. EMAIL: rblecha@stillwatertech.com Corner) CODE REFERENCES: • NFPA 30 (2018) - FLAMMABLE & COMBUSTIBLE LIQUIDS • NFPA 30A (2018) - MOTOR FUEL DISPENSING FACILITIES • PEI/RP 100-17 - RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND LIQUID STORAGE SYSTEMS • NFPA 70, N.E.C. 2017 • FLORIDA BUILDING CODE (FBC) 2017 (6th Edition) • FLORIDA FIRE PREVENTION CODE - 6th Edition FLORIDA SAS DRAK Ns5 PASE= DE 5CRIFTION DATE RE=\/.DtN%TE: RE \/.DATE: RE\/.DATE: COVER SHEET 6-0. (1-20,000 GAL. TANK IN/ 2-22,000 GAL. Oct/08/14 12/01/18 07/51/lat 05/15/20 COMPARTMENTAL I ZED TANKS) FLORIDA TANK DETAILS 6-1. (1-20,000 6AL. TANK YV/ 2-22,000 6AL. Oci/05/14 12/01/18 07/51/I01 2(0 1 "- C» G>ZS COMPARTMENTAL I ZED TANKS) 6-2. FLORIDA TANK DETAILS (1-20,000 6AL. TANK W/ 2-22,000 GAL.. Oct/08/14 12/01/18 07/51/la � ����� COMPARTMENTAL I ZED TANKS) a L U C I E COUNT 6-5. FLORIDA GASOLINE DETAILS STACKED 8 DISPENSER LAYOUT Oa/08/14 12/01/0 07/51/I0f 9000 05/15/20 6-4. FLORIDA 6A5/DIE5EL SUMP DETAILS Oct/08/14 12/01/1E5 07/51/ICt FLORIDA G-5. GENERAL NOTES 4 LEGEND (1-20,000 GAL. TANK W/ 2-22,000 GAL. O4i/08/14 12/0I/118 07/51/la COMPARTMENTALIZED TANKS) - DISTRICT �� �r 6-(6. FLORIDA CONCRETE DETAILS STACKED 8 05/OS/IS 07/51/'I°� '� SY�I I,a ET SE ,Vfs,17 T % e —.-..o—"""" K fd�� r' No. 50701 STATE OF zz NOV 10 2020 Date cc � I��QIC° A'W. , — a "V-V . m GOVE'K "> H EET z z YNA, NA, ORANSE AVE. g � I NSS � O_ O_ a- Ln Ln Cc > > z ST. LUG I E C0UNT)0`FL m J J H w U (I)-20,000 SAL. TAN< lN/ (2)-22,000 SAL.. z z " GOMFAf;;�TMENT'ALIZED TANGS) o � W SCALE DATE.`. � DFcA WN BY CHECKED BY � T-i m F- Ln AS NOTED Oi/S 1 /I cl STILLNATER FA5 M -I-lc;] _.,. i V— IANzwa 7022 TPC DR., SUITE 200 ORLANDO, FL 32822 PHONE: 407-355-9958 fAX: 407-355-9987 (5 === 0 DRAWING NO. I OF 7 -€HEET NO. ( (TYP) 2" CLEARANCE TO #4 x (12) #4 x oou:r orcrRV01R, 1 BUCKET (TYP.) (16)#4x8' M^ ""•" OLE R TO REBAR TYP. "D_� TANKFIELD REINFORCING DETAIL CG-1 )SCALE: 1 /411 =1 '-0" R Y4 1�0N0L 17H I C CUR SCALE: NTS FRP PULTREDED STRAP - TO BE COORDINATED AITH TANK MANUFACTURER GALVANIZED %" X 15" JAW 5M RUBBERIZED UNDERCOATING, (TYP) TO JAA TURNBUCKLE \� 12" X 15" 4000 LE, PSI CONCRETE A/ REBAR PER TANK MANUFACTURER SPECIFICATIONS 6" TANK MAT LENGTH = 40' FOR 20,000 GAL. TANKS, 42' FOR 22,000 SAL. TANKS d 4 p c 5/4" REBAR o C ® d C D p p O TANG HOLD Z�OV N SETAIL 6-1 SCALE: III _ 1 1-0 ii d A 4 a C d d a 2" RAIN GAP (DIESEL VENT) 3" VENT GAP (GASOLINE VENT) NOTE: ALL G,ALVANIZED PIPING BELOW &RAVE TO BE WRAPPED AITH TANK STRAPS - SPACED PITGHMASTIG. PER MANUFACTURER 5" G,ALVANIZED 1 VENT (SASOLINE) M N) ACKNO=III I FORGED TURNBUCKLE5 AND FRP w TGHWLEDSEMENT BM RUBBERIZED PULTREDED STRAP; PROTECT WITH 5L5 I �= I (- UNDERCOATING � ANODE PER TURNBUCKLE; WRAP AND 5" SALVANIZED SUPPORT GOAT WITH PITCHMA5TIG. ALL ANODE _I - 1/7-4 MIN. TS/T I -I LEAD WIRES TO TERMINATE AT TANK (DO NOT PAINT) OVERFILL ALARM SOX I" G,RG FOR OVERFILL I I I.. 22K 20K 22K I I I -I 5TP SUMP MANHOLE OF EACH TANK. 2" GALVANIZED VENT ALARM =III= GOMPART. REGULAR GOMPART. I I -III- 5'-O` (DIESEL) 5" GALVANIZED COUPLING, III=III TANK UNLEADED TANK I=) I I REINFORCED CONCRETE DEADMEN FOLD I II I I I I I L PER TANK MANUFACTURER SPEC. 5'ASIALVANIZED GAP • .. 5-24 CONDUIT SEALOFF SPARE =I I 1=I (=I I=I I=I I=1 I=I - 20,000 OR 22,000 GAL DOUBLE -=I 5 -O I I - I I FUTURE USE -- M I N=I I I=I I I=1 I I=I 11=I I I=III=I I M I I=I I I=I I I I I WALL FIBERGLASS TANK UL 1516 11 LISTED 4 ALCOHOL COMPATIBLE I I I I b" IDEAL SHIELD 10'-6" O.D. I I I BOLLARD (2 TYP) 2" COUPLING, MARAFI FILTER FABRIC 5 OZ/YD2; NON WOVEN NEEDLE PUNCH CONTINUOUS FROM ONE SIDE Dfll 5" G,ALVANIZED VENT TO OTHER; OVERLAP JOINTS BY 12„ (SITE SPECIFIC -VERIFY W/ PETROLEUM MANAGER) 5' X &' GONG. PAD (SASOLINE) 5" AMERON 5000 L (REGULAR UNLEADED) (MAIN) TAN U I 2 AMERON 5000 L (DIESEL) 3" AMERON 3000 L (E-FREE L-- E55 UNLEADED) (T5) 6-1 /� SCALE: 1/8" - 1 I-OII 2 5NING, JOINT- S" SAING, JOINT 16" 12' O.G. O.G. Y I `lT 57Ar< CHASE FOR FUTURE USE - (4" APT DUCTING W/ FLEX ENTRY BOOT BLANKS) MONITORING HELL PREMIUM PRODUCT LINES (2) 10,000 GALLON COMPARTMENT (115 OCTANE) CHASE FOR FUTURE USE FROM (TI TO T5) (TO MPD'S) REGULAR UNLEADED PRODUCT LINES (2) 40 -0" (TO MPD'S) T3 (DIESEL) 10,000 GALLON COMPARTMENT (UL5D) UL5D PRODUCT LINE5 (2) 2'-0" (TYP. 5 ad], 5 ULTRA LOW SULFUR DIESEL 12,000 GALLON TANK (UL5D) END OF MONOLITHIC CURB MONOLITHIC CURB BRINE RESERVOIR (TYPIGAL)(5) T4 (RU L) T2 (RUL) 5" AMERON 5000 L GASOLINE VENT PIPING (MAIN HEADER 4 T5 VENT) . 6'X6' VENT I STACK PAD MANIFOLD UNLEADED 2G,000 GALLON TANK (57 OCTANE) PRODUCT CROSSOVER 2" AMERON 5000 L DIESEL VENT PIPING MONITORING WELL END OF MONOLITHIC CURB E-FREE PRODUCT PIPING I15l-41 1 1 5'-41: 5'-4:: COMPARTMENT CHASE FOR FUTURE USE (FROM T5 TO T5) (57 OCTANE) CONSTRUCTION JOINT (TYP.) CONTROL JOINT (SEE DETAIL) (SEE DETAIL) NOTES: I. TANK(5): SHALL BE UNDERWRITERS LABORATORY LISTED (UL-151(o) AS GALLED FOR ON THE SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND SHALL BE DOUBLE WALL TANKS OF FIBERGLASS REINFORCED PLASTIC (FRP). INSTALLATION OF TANKS $ PIPING SHALL BE IN ACCORDANCE IN/ THE LATEST EDITION OF THE INSTALLATION SPECIFICATION AS PROVIDED BY WAWA, INC. s MANUFACTURER'S INSTRUCTIONS. 2. PRIOR TO TE5TING, PETROLEUM CONTRACTOR SHALL VERIFY TIGHTNE55 OF MANWAY BOLTS. VERIFY 5OLT5 TO BE SET PER MANUFACTURERS TORQUE 5ETTIN65 $ APJU5T AS REG. (TYP.) 5. SEE SHEET 4 FOR EXACT LOCATIONS OF SUMP PIPE ENTRANCES. 4. SEE SHEET 2 FOR SPECIFIC TANK DETAILS. A � TANiG F I ELD LAYOUT 6-I SCALE: 1/8 5 0 v����l��i�l�����ll'�Gi14' p 7 SCALE: S/Q" = 11-0II stillwater TECHNOLOGIES '0" NJ 5000 L 4T) 5000 L (SAS _ No. 50 1 7 E STATE F 'rod®A� '�t o RID P 'r "� '9/ONA � /,� ,� III NOV 10 2020 Date X\ �. ®R OR E S DEADMAN BURIAL Wawa � �' WATER AT GRADE JWL 03/3.In4 a ZC company TANK DATA INSTALLATION NOM. CAP. (GAL,) 22000 ( 12k x IOk) TOTAL COVER INCLUDING SOIL & 4.50 TYPE (SINGLEWALL=I,DW-3) 3 TOP :SLAB (FT) DRY-1; WET=2 2 TOP SLAB THICKNESS (IN) 8.00 NOM. TANK DIA, (FT.) 10 TOP SLAB L:ENGTI-1(FT) 46.00 ****************************+* x****a ********** TOP SLAB WIDTH (FT) 13.33 PROD. STORED (GAL) 0 DEADMAN LNG (FT) 42.00 SPEC. GRAV. USED 1.00 DEADMAN WID (IN) 18.00 BRINE FILL (GAL) 224 DEADMAN THK (IN) 12.00 SAFETY FACTOR' OF 42" DIAMETER SUMPS 4 DOWN FORCE/UP FORCE = T.47 :1 TOTAL WEIGHTS DOWN FORCES CONCRETE WEIGHT 47070.22 LBS. BACKFILL WEIGHT 23712L83 LBS: TANK WEIGHT 11500.00 LBS. PRODUCT WEIGHT 0.00 LBS. TOTAL DOWN FORCE----- 295692,05 LBS. UP FORCES TANK DISP. FORCE 200517.43 LBS. TOTAL UP FORCE----- 200517.43 LBS. WORKSHEET TANK DATA SHELL DIAMETER--- --------- 10.00 FT. * ACTUAL CAP (GAL) 22176.00 SHELL LENGTH - --- --- 31.90 FT. * TANK WT. (LBS.) 11500.00 DOME PROJECTION---------- 5.00 FT. * O.A,L. (FT.) 41.90 MID POINT HEIGHT- --------- 8.83 FT. NUMBER OF RIBS 25.00 COLUMN HEIGHT-------------- 13.83 FT: RIB VOLUME ------------------ 2631,00 CU. IN. DOME A. (SQ FT) 78.54 DOME VOL. (CU FT) 52160 REINFORCED CONCRETE VOLUMES (CU.FT.1 TOP SLAB--------- --------- 408.89 DEADMEN 1.26.00 FORCE = VOL. X 88 LBS/CF 35982.22 FORCE (LBS) = VOL. X 88 LBS/CF 11088.00 TOP SLAB & DEADMEN FORCE 47070.22 LBS. BACKFILL VOLUMES (CU. FT.) OVER TANK SHELL- 1417.39 OVER DEADMEN 1743.00 OVER TANK DOMES----- ---- 431,97 END WEDGE 359,07 TOTAL WET VOLUME 3952.03 FORCE = VOL. X 60 LBS/CF 237121.8331 LBS: BUOYANCY SHELL VOLUME---- 2652.62 CUBIC FT. DOME VOLUME--- ---- 523.60 CUBIC FT. RIB VOLUME ---- ----- 38.06 CUBIC FT. TOTAL VOLUME 3214 29 CUBIC FT. VOL X 7.48 GAL/CUTT, 24042 86 GALLONS FORCE = GAL X 8.34 (LBS./GAL.) 200517.43 LBS. < XCIRRX,"Es DEADMAN BURIAL WAWA WATER AT GRADE ,IWL II/ oni a company TANK DATA INSTALLATION NOM. CAP. (GAL.) 20000 TOTAL COVER INCLUDING SOIL & TYPE (SINGLEWALL=I;DW=3) 3 TOP SLAB (FT) 4.50 DRY=1, WET=2 2 TOP SLAB THICKNESS (IN) 8.00 NOM. TANK DIA. (FT.) 1.0 TOP SLAB LENGTII (FT) 40.00 **+ ********4 xx ********* x ******** u*** x** ** x**** x TOP SLAB WIDTH (FT) 13.00 PROD. STORED (GAL) 0 DEADMAN LNG (FT) 40.00 SPEC. GRAV. USED 1.00 DEADMEN WID (IN) 18.00 BRINE FILL (GAL) 194 DEADMAN THK (IN) 12.00 SAFETY FACTOR # OF 42" :DIAMETER SUMPS 2 DOWN FORCE/UP FORCE = 1.57 :1 TOTAL WEIGHTS MOWN FORCES CONCRETE WEIGHT 41066.67 LBS. BACKFILL WEIGHT 224301.69 LBS: TANK WEIGHT 8900.00 LBS. PRODUCT WEIGHT 0.00 LBS. TOTAL DOWN FORCE----- 274268.36 LBS. UP FORCES TANK DISP_ FORCE 175216.07 LBS. TOTAL UP FORCE----- 175216.07 LBS. WORKSHEET TANK DATA SHELL DIAMETER--- --------- 10.00 FT. * ACTUAL CAP (GAL) 19782.00 SHELL LENGTH----------------- 27.73 FT. * TANK WT. (LBS.) 8900.00 DOME PROJECTION---------- 5.00 FT. * O.A.L. (FT.) 37.73 MID POINT HEIGHT---------- 8.83 FT. * NUMBER OF RIBS 22.00 COLUMN HEIGHT------------- 13.83 FT.*** **4 z*x *********** x z** z* x** RIB VOLUME - ---------- ------- 2631.00 CU. IN.. DOME A. (SQ FT) 78,54 DOME VOL. (CU FT) 523.60 REINFORCED CONCRETE VOLUMES (CU. FT.) TOP SLAB------------------ 346.67 DEADMEN 120,00 FORCE = VOL. X 88 LBS/CF 30506.67 FORCE (LBS) = VOL. X 88 LBS/CF 10560.00 TOP SLAB & DEADMEN FORCE 41066.67 LBS. BACKFILL VOT.ITMES LCU. FT.) OVER TANK SHELL------------ 1286.73 OVER DEADMEN 1660.00 OVER TANK DOMES--------- 43 L97 END WEDGE 359.67 TOTAL WET VOLUME 3738.36 FORCE = VOL. X 60 LBS/CF 224301.69 LBS. BUOYANCY SHELL VOLUME ---- 2251.61 CUBIC FT. DOME VOLUME -------------- 523.60 CUBIC FT. RIB VOLUME --------------- 33.50 CUBIC FT. TOTAL VOLUME 2808.71 CUBIC FT. VOL X 7.48 GAL/CUTT. 21009.12 GALLONS FORCE = GAL X 8.34 (LBS./GAL.) 175216..07 LBS. � 5U0Y/A:NC`I' CALCULATIONS 6-I SCALE: N.T.S. - 0 0 0 z � � � o C w Www� z z z w w w M001- q�T-iW o M O *-i Q o o M N z TANK D BTA I I_S V�AA NA, ORANGE AVE ® K I N&S HV�Y. (SA. CORNER) ST. LUC I E COUNTY,, FL_ (I)-201000 69AL. TANI< Val/' (2)-22,000 COAL_. GOMFARTMENTAL_ I M-D TANGS) SCALE DA TE: DRAWN B `✓.• CHECKED BY - AS NOTED 01/5 1 /1 1 1 STILLNATER FAE3 t4awa 7022 TPC DR., SUITE 200 ORLANDO, FL 32822 PHONE: 407-355-9958 fAX: 407-355-9987 0 === DRAWING NO. 2 OF -1 SHEET NO. 4" DIA. FRP OR SGH. 40 PVC, RISER BRINE HYDROSTATIC RESERVOIR 2 HIGH GROWN TYP. SENSOR COMMUNICATION TO TL5-350R AROUND ALL OFIENINC75 4" DIA. I=RP OR SGH. 40 PVC RISER -- BRINE HYDROSTATIC RESERVOIR SENSOR COMMUNICATION TO TLS-550R �� MONITORING SYSTEM (TYP. 3) .020 SGHD 40 PVC SLOTTED „ PE. .020 SLOT TO A�(ONITORING SYSTEM (TYP. 3) 2 INTERSTITIAL TURBINE 2 G GRO P. AROUND ALL OPENINGS HYDROSTATIC 5EN50R V4ELEXTEND 12" MIN. BELOW � SPILL MANHOLE 4 -6 AVERAGE BURIAL 4'-6" AVERAGE BURIAL SPILL CONTAINERS (ALL BOTTOM OF TANK $ WITHIN DEPTH AS MEASURED AT 2' FROM FINISH GRADE CENTER OF TANKS. ANY HYDROSTATIC SENSOR - DEPTH AS MEASURED AT TANKS) CENTER OF TANKS. ANY DEVIATION FROM THIS DEPTH DEVIATION FROM THIS DEPTH TO BE APPROVED BY SPILL CONTAINERS (ALL TO BE APPROVED BY CORROSION 3M PROTECTION CONSTRUCTION MANAGER TANKS) CONSTRUCTION MANAGER TAPE TANK FIELD ONLY PRIOR TO TANK -NR51NE SETTING ACTIVITIES. ONLY. PRIOR TO TANK OBSERVATION VAPOR FILL SETTING ACTIVITIES. TURBINE VAPOR FILL ILL VAPOR TURBINE ,. ,...- ..... .., . 'A' .:. �: FORGE CONCRETE S AB ;4•; ';:: °• � .'�.. •�� REIN L REINFORCE CONCRETE 5L B f (SEE CIVIL DRAWINGS) a (SEE CIVIL DRAWINGS) I N-TANK GAUGE PROBE W/ clO% OVERFILL ALARM BUNG HOLE IN -TANK GAUGE PROBE -�o-5- 1;I',IIiI Il B�piIIy':IIYI1•III :.LU%:o��n- r��N/�,iG p�! HOLES OI/�o'III LIIi' EiS � 6 p�J�IIII CALIBRATION.SG�Q0% OVERFILL ALARM INSTALL PER MFRSGALIBRATION. REQUIREMENTSINSTALL PER MFR'5 � "° I �A-� i�6LJs!III� L _SI�jIIlIIIIIIIIiIIIIII - R0 31I!iiI'I,;,�I .!SIii clE R I �1S 0-T-�;�,C _ O I B.,-�- 1 I E REQUIREMENTS OOO _ QQWRAPPED ITH 3M-0' IiII;rI 4T6I,,IIIIi I 1�III'IiII ri IIIIII �a��0 =II�CV�'01�ICiIIIrIII �,;IitIilLII'IiII i � � III,II j iI:I�IiI �r�!,IIjIiiIIiI 1II�iIII I;„'�I �I - - -0- ,I �c O�°°g�• Op � I 0�OQOQ00 �cc�OO44OOO 0BUNG HOLE CORROSION PROTECTION -PETR SUBMERSIBLE PUMP TAPE. ° FEO 2 H.P. FE-PETRO 2 H.P. OOO(HOLD 4 -6 OF_ 20,000 GALLONSUBMERSIBLE PUMP —DROP TUBE BOTTOM)(HOLD 4 -6" OFF 10,000 GALLO 22000 GALLON SET AT a5% DOUBLEWALL COMPARTMENT DOUBLEWALL UNDERGROUND OpU0"HO�O�ca-a 30 O0° 10 BOTTOM) CAPACITY OBOMPARTMENTALIZE 10-6oFIBERGLA.5 STORAGE o°O UNDERGROUND R)PP 12,000 GALLON U o FIBERGLASS = O O COMPARTMENT O_pTo OOo" 4 BAGKFILL (TYP.) MAX. GRAVEL BED 4" TO 22.5-STORAGE TANK oPEA GRAVEL BED 4 BAGKFILL (TYP.) 6"MAX. 09 22.50o �OOop OQ0°0 O oQ °° ° ° 0 ° 0 ° pr) p Y�(��a�a1a�a8p�op"4 7`rFIGAL COtvIFAR7M NTALIZED TAN< SEAT1ON T`F I rAL TAN< SECT1 ON - I - F, Fi � �FTI w wZ e o Q ocV 4 5 9 10 13 141 1516 15 1'4 10 5 4 322 21 20 19 18 _ 3 6 7 :16 1718 19 2017 413 � 9 8 7 6 2 1 2 8 -A _ IJ _ hw wx Z 10'-4 O.D. RIBS �J10-0O.D. SHELL Q 10 -4" O.D. RIBS 10f-0" O.D. SHEL 'Loo GUIDE cli GUIDE LUG LUG GUIDE GUIDE LUG LUG 5 2 7 834 9 15 16'� 17'18I110 9 -4 "(TYP) -5 422 21'20I'19 18I17 16;�1�14 13I ;'4 11 10 9 8 7 6 32 12 6 120 1'-41 41'-10J" REVIEWED C,0IvFA TvENTALIZFD TAN< ELEVATION SHOlNINC57 STR F SFASINO TAN< ELEVATION SHOWINC9 ST AF SFAG1NC-6" COMPLIANCE . �—SCALE: 1/4"=1'-0" G SCALE: 1/4=1'-0ST. LBOCUCIE COUNTY o TANK DETAILS MAN= VIIIIIIIiA�NA, ORAN6F AVE. (�) <N65 H�N%r. Wawa '��ztc� r' ` 7022 TPC DR., SUITE 200Stillwater(S.�. CORNER WwwoTECHNOLOGIES ORLANDO, FL 32822 No. GT. LUGI COUNTY/ FL PHONE: 407-355-9958 fAX: 407-355-9987 w1700 N. Orange Ave. Suite 100A TATE F LUUjJ()-20,000 &AL. TAN< V�/(2°1-22/000 CGL. Orlando, Florida 32804 G01,IFART ENTALI.Zr= TAN<S)A (407) 206-7222 (407) 206-7223 fax `�� ®N� t VN o, o� v — °� Uj SCALE DA TE.• DRA 64/N B "Y. CHECKED B Y.• __- FL. Cert. of Auth. #8326 DRAWING N0. M o a NOV 10 2020 CD AS NOTED 0/51/1ci STILLAATER FAE3 3OF-7 STILLWATER PROJECT #464-182 DateDate M N o SHEET N0. Z -- w........ 0602 NOTES , . I. SITE PLAN RELATED ITEMS DISPLAYED HAVE ! . �?\ BEEN BASED ON SITE PLANS PREPARED BY ZONING, STEVE DOBBS DATED 04/021/20. D USE-, @ X ° 2. FINAL LOCATIONS OF DIESEL AND 1 { �_o ° ETHANOL —FREE DISPENSERS TO BE VERIFIED �' u,^ WITH WAWA PROJECT MANAGER. CONFIRM LOCATIONS OF 4+1's AND 5+1+1'5. 0 NINE1 .. 4 5. VERIFY ALL PIPING WITH WAWA PROJECT VENT LINES 3" GALVANIZED VENT STACK FOR MANAGER PRIOR TO INSTALLATION. GASOLINE (2" GALVANIZED VENT STACK FOR DIESEL) ABOVE GRADE, 3" RIGID DOUBLE WALL 1N ink, _. �...�ll ��..�:���� ::_. FIBERGLASS FOR GASOLINE (2 FOR DIESEL) — ___ ii BELOW GRADE. PER MANUFACTURER'S c € I I II ? \.,� INSTRUCTIONS, TERMINATE SECONDARY W/ FRP TERMINATION FITTING. SET MIN 5'BEHIND _. CURB. INSTALL (2) 6" IDEALSHIELD BOLLARDS r��r' .:,.... v I FRONT \\ N F NT OF VENT STACK IN PVC SLEEVE (PER "? \��� SPEC). SET IN V X 6CONCRETE PAD. .......sl E ­ RUMMM i;�`'fi` i✓''� ' � � 3 3 _ 1 , J,. Aj( E _........_.__._..._._ k.. t^, 1 ...,..,...,€ T y. I I \c L _... ._ _...______..._...' I.. I Iff RE O� a... .. _ c_ _.......... .w....... .< E-STOP D TO DI EXTERIOR. CONFIRM GT IU10CATION WITH OWNER i LOAC)ING ZONE i 1,44 ... TNrF I GAL_ P I F I NCG RUNS 6-5SCALE: I I = SO 1_p 11 Ao�T4�A . 9 f . 3 4, 1 m I I I 10 ' s200 I E Mf'L�g 11° '3�;T5 ' Aside ! Is 4 I1=1 1 g la > i f Itl?I! _ 211 APT XP D I �.... 15 II , 13 I 1 �� F s! i:.,........j • a lief= 6 li!(14 1._ k I Ill I ! I F `• LABEL Cr.419 4 p BY FUELIN( II F IN • I,II 15 1 � (EI. UEL t € It . 16 BOLLA \ WMIIN LOGATIO MULTI -PRODUCT D I SPENSER (Tyr) ETHANOL FREE MPPS BOLLARD; 6" IDEAL TRASH 5TAINLF-55 STEEL OVAL ISLAND SHIELD BOLLARD (TYP) UNIT (T1'P.) FORM PER SPEC (CAULK) 4'-102" 4'-10]" 5'-5" 41_I I I Iall V _� _ STORE o ❑ ct� DI5PEN5 R "A" _ M� O SIDE \J M 40" / MIN. CLEAR 2' 5' 2' REGYGL.E FIRE EXTINGUISHER HOUSING UNIT (TY'P.) (WAWA SUPPLIED) TO BE SPILL CONTAINMENT KIT (ONL)" AT INSTALLED BY PETROLEUM END POSITIONS — 2 TOTAL PER SITE) CONTRACTOR (TYP) NOTES: I. VERIFY WITH BUILDING/ CANOPY DRAWINGS BY ARCHITECT NOT FOR CONSTRUCTION) 2. BOLLARDS BETWEEN DISPENSERS SHALL BE PROVIDED AT END POSITIONS ONLY (VERIFY PLAN WITH LAYOUT). ('E_3_� ISL_ANI�) PLAN 1\1� - ja 5(fALE: FIRE EXTINGUISHER HOIJSI146 (WAWA SUPPLIED) TO BEIN5TALLED BY 45" TO TOP OF PETROLEUM CONTRACTOR FIRE EXTINGUISHER TRASH (TYP) UNIT RECYCLE UNIT 14' SPILL CONTAINMENT KIT �11 ONLY AT END POSITIONS MIN. (2 TOTAL PER SITE) CLEAR (TYP) 4'-1011 �41-2" '-2"-- 4'-l011 (TYP) _ (TYP) 21-0 SEE NOTE 2 SEE NOTE 2 IDEAL SHIELD BOLLARD COLOR: DISPENSER SIDE "A" RED I. REFER TO BUILDING/ CANOPY DRAWIN65 BY ARCHITECT (NOT FOR CONSTRUCTION) 2. CURB REVEAL TO BE 6" AT CENTER OF 15LAND FORM (No MORE, NO LESS) 5. BOLLARDS BETWEEN DISPENSERS SHALL BE PROVIDED AT END POSITIONS ONLY VERIFY PLAN WITH LAYOUT). C CANOf="%' ELEVATION 15/1 4" ASPHALT ^� N �.,. u�, I, CONCRETE GLEAN APPROVED BACKFU I Ll_ O,J FIFE TREG NH SEGTION NOT TO SGALE STORE > 6"CONCRETE 6" STONE BASE 2' AS SPECIFIED ON B'-5" 51TE PLAN PAVING DETAIL PAST EDGE OF CANOPY VERIFY YV SITE PLAN) 61LBARCO ENCORE '700 DISPENSER ENCORE 5L DISPENSER DOUBLE POPPET - MALE SHEAR VALVE (ALIGN WITH TOP OF ISLAND) STABILIZER BAR KIT — DISCRIMINATING D 15PEN5ER PAN SENSOR. ^ D 1 SPENSER SUMP (ENCORE) BY—PASS TUBE — NOTES: I.) SEE SHEET 67-5 FOR TABLE WAWA SUPPLIED MATERIAL FOR SPECIFIC PART IDENTIFICATION. WICK CONNECT SWIVEL GLAMSHELL FITTING — 2"' XP SERIE5 2" SECONDARY TEST BOOT SIDE VIEV� E�)ISF NS R SUMF — INLINE G-✓ / SCALE: 5/411 = I I-01I DISPENSER STABILIZER BAR KIT S S CONNECTOR S.S.FLEX CONNECTOR N/ 2" X 2" X I JI/211 QU I GK CONNECT FITTING ,,-- 4" CORRUGATED DUCT (RETRACTABLE ONLY) 2" XP SERIES SECONDARY CONTAINED PIPE 2" DUCTED ENTRY BOOT NOTES: I.) SEE SHEET 6-5 FOR TABLE WAWA SUPPLIED MATERIAL FOR SPECIFIC PART IDENTIFICATION. YV 2" X I Y2" DOUBLE POPPET -MALE N/ 2'° X IGK CONNECT SHEAR VALVE (ALIGN FITTING WITH TOP OF ISLAND) DISCRIMINATING CONTRACTOR TO D I SPENSER PAN PROVIDE PURGE SENSOR VALVE PER WAWA FUEL EQUIPMENT R 1 A • <I DEPARTMENT DISPENSER 2" XP SERIES SUMP (ENCORE) SECONDARY QUICK CONNECT --__ i CONTAINED PIPE SWIVEL GLAMSHELL FITTING - 2" XP SERIES I 4" CORRUGATED 2" SECONDARY TEST I DUCT (RETRACTABLE BOOT ONLY) APT TEST K I T \ / I ^ I 2" DUCTED S 11l I Y `I ENTRY BOOT rff� CISFENSER SUMF—7ERM1NA71Nr_9 Li-5 / Sr-.,ALE:11 =I Ip II DIESEL INLET (4+1 M.P.D.) PRODUCT SHEAR HIGH PRODUCT (15 VALVE OCTANE) I NLET LOW PRODUCT 07 2"x2" S.S. OCTANE) INLET CONNECT FITTING • (2) 5/4" CONDUITS (2) 5/4" CONDU I T5 —�� _ _ _ VEEDER ROOT PONER/DATA — I NTERCOM/MUZAK 5.5.FLEX CONNECTOR N/ 2" X 2" X I Y2" QUICK CONNECT D 1 SPENSER SUMP FITTING (ENCORE) USE 2" S.S. SPOOL FITTING TO MAINTAIN E-FREE � PRODUCT RUN HUSKY I" SAFETY APT-GLAMSHELL BREAKAWAY GOUPL I NG FITTING NOTES: " DIAMETER Ho5E 1.) INSTALL DISPENSER IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 2.) VERIFY ALL PRODUCT INLETS FOR SPEC I F I G TYPE OF DISPENSER BEING INSTALLED PRIOR TO DRILLING SUMP ENTRY BOOT ACGE55 HOLES PRESsuRE 3.) SEE SHEET 6-5 FOR TABLE WAWA SUPPLIED MATERIAL FOR SPECIFIC PART ACTIVATED AUTO IDENTIFICATION. NOZZLE 4.) E-FREE PRODUCT RISER HILL NEED TO TIE INTO THE MPD INLET PER MANUFACTURERS INSTRUCTIONS. HOSE SWIVEL (7'� I SF IDS R SUMF — SECT 1 ON V I � 64+0 DISPENSER—`- SCALE: RAISED ISLAND D15PEN5ER SUMP (SEE DETAILS THI5 SHEET) DISPENSER J PROFILE 6-5 NOT TO 5G/iLE stillwater TECHNOLOGIES a I A .Zz SIONiL NOV 10 2o20 Date m m L— °< < ? m wO O a > > o w w m a to J Q > QQ O w W w w w w Ln C3 C7 tn 0 w Ln�- �— i N O Q Ln M N oo� m N O (4) 15/16 X 1-7/16 ANCHOR BOLT SLOTS 5/4" CONDUIT FOR POWER AND 2 WIRE 3'—O 2'-43�411 1 1/2" NPT PRODUCT INLET COUPLING (TYP.) VERIFY LOCATION FOR SPECIFIC M.P.D. (� 5/4" CONDUIT FOR INTERCOM / MUZAK =1 _I CS I � 5/4" GONDU I T FOR DATA 5/4" CONDUIT FOR ATG ".� ",.� a 1 1 /2" NPT PRODUCT INLET /8 I" NPT VAPOR COUPLING COUPLING (TYP.) VERIFY LOCATION FOR SPEC I F I C M.P.D. 1gOTE5: I. CONTRACTOR 15 RESPONSIBLE FOR CORRECT ORIENTATION OF THE STUB— UP'5 TO THE D I SPENSER. 2. "STUB — UP" FROM HEADERS MUST MATCH LOCATION SHOWN IN THIS PLAN TO MATCH D15PEN5ER"5 INTERNAL CONFIGURATION. �. NORIENTATION WITH WAWA FUE DEPARTMENT. 3. CONTRACTOR TO VERIFY DIESEL DISPENSER L ' I I C� UNDER D I SPENSER CONTAINMENT 4. D I MEN51 ONS SHOWN IN THE ��I EW ARE TO BE USED FOR 5 Z N U AND CONCRETE CUTOUT CLEARANCES. 5. USE CONDUIT KNOCKOUT IN METAL SUMP TOP FOR PLACEMENT OF DISPENSER CONDUITS. 6. VERIFY ALL PRODUCT INLETS FOR SPEC I F I G TYPE OF D I SPENSER BEING INSTALLED PRIOR TO DRILLING SUMP ENTRY BOOT ACCE55 HOLES D I SPENSER 5ASE 17 I DENS I ONS SCALE: 5/4"4-011 STABILIZER p 2" XP SERIES SECONDARY BAR _' g CONTAINED PIPE 5/4" POWER TO DISPENSER JUNCTION BOX 4" CORRUGATED DUCT 5/4" DATA TO (RETRACTABLE ONLY) DISPENSER JUGNTI ON BOX 2" DUCTED ENTRY BOOT ® ® ® QUICK CONNECT GLAMSHELL COUPLING a> 5/4" INTERGOM/MUZAK 3/4" VEEDER ROOT TO D 1 SPENSER SUMP GLASS I JUNCTION BOX (ENCORE) APT SECONDARY SECONDARY TEST BOOT ~ ~ ~ ~ BY-PA55 TUBE PRODUCT SHEAR VALVE NOTES: 1.) SEE SHEET (5-5 FOR TABLE NANA SUPPLIED MATERIAL FOR SPECIFIC PART IDENTIFICATION. 2.) VERIFY ALL PRODUCT I NLET:5 FOR SPECIFIC TYPE OF DISPENSER BEING INSTALLED PRIOR TO DRI LL I N6 SUMP ENTRY BOOT ACCESS HOLES. 3.) E-FREE PRODUCT RISER WTI L,/L NEED I TO TIE INTO THE MPD INLET PER MANUFACTURERS INSTRUCTIONS. PLAN Y I E Y `I, 6 E�) I SF NSER SUMF I;)F—TA I L_ — I NL. I NE (5+1+1) DIESEL INLET E—FREE INLET PRODUCT SHEAR HIGH PRODUCT M5 VALVE OCTANE) INLET (2) 5/4" CONDUITS — — — I r LOW PRODUCT (5-7 PO4NER/DATA OCTANE) INLET DISPENSER SUMP (2) 3/4" GONDU I TS (ENI�ORE) _ — VEEDER ROOT I NTERCOM/MUZAK 5.5.FLEX CONNECTOR N/ 2" X 2" X I Y2" QU I GK CONNECT FITTING REVIEWED FOR APT-GLAMSHELL E COMPLIANCE NOTES: COUPLING S T, CI CAI NTY 1.) INSTALL D 1 SPENSER IN ACCI'VRDANCE W 1 TH MANUFACTURER'S INSTRUCTIONS. °'' 2.) VERIFY ALL PRODUCT INLETS FOR SPECIFIC TYPE OF DISPENSER BEING INSTALLED PRIOR TO DRILLING SUMP ENTR: l BOOT ACCESS HOLES 3.) SEE SHEET 6-5 FOR TABLE NANA SUPPLIED MATERIAL FOR SPEC I F I G PART IDENTIFICATION. 4.) E-FREE PRODUCT RISER WILL_ NEED TO TIE INTO THE MPD INLET PER MANUFACTURERS INSTRUCTIONS. I�) I SF NS R SUMF — SECTION V I kN (5+1+1) \,G-S/ SCALE: 5/411= 11_p11 D FENSER DETAI L_Cj - STACKED 8 V�AV�A, ORANGE AVE:. @) <INC�S HK*'. wa (SA. `rORNER) 7022 TPC DR., SUITE 200 ORLANDO, FL 32822 ST. LUC I E C0UNTY FL PHONE: —3555-9 / fAX: 407-355-9987 (I)-20,000 65AL. TANG N1 (2)-22,000 COAL. GOMFAf'TMENTAL I ZEZ'� TANGS) SCALE DA TE,, Dk'A WN B Y. CHECKED B Y- DRAWING NO. AS NOTES 07/51 /11 571LLVN A7ER FA5 40F'7 SHEET NO. BRINE RESERVOIR SUMP ELECTRICAL SEAL OFF; INSTALL CONDUIT FROM BOTTOM OF SUMP-7 , 3/4" RG ELEGTRIGAL CONDUIT 4" PLASTIC—/ RISER GAP KIT EVO INTERSTITIAL MONITORING SENSOR NOTES: I.) SEE SHEET 5 FOR TABLE WAWA SUPPLIED MATERIAL FOR SPECIFIC PART IDENTIFICATION. GLA55 I JUNCTION BOX A�), PL,4N VIEW -BRINE RESERVI OR 67-4) SGALE: 1 " = 1'-O" NOTE: CONDUIT (PAR, VR, SPR) I RG ELECTRICAL CONDUIT (SPARE) GLASS I JUNCTION BOX 2" XP SERIES SECONDARY 4TAINED PIPE-1 2" DUCTED ENTRY BOOT APT GLAM5HELL COUPLING FE PETRO 2 HP SUBMERSIBLE PUMP 4" CORRAGATED DUCT (RETRACTABLE ONLY) 2" DUCTED ENTRY BOOT 2" SECONDARY TEST BOOT DISCRIMINATING TANK SUMP SENSOR 5/4" RG ELECTRICAL CONDU I T 5" FIBERGLASS SLEEVE 2" BALL VALVE 10' MAG INVENTORY PROBE 3.0 GPH MECHANICAL LEAK DETECTOR L BLANK (TI TO T4 ONLY) NOTE: A_ REFER TO VIEW G-1 FOR CHASE LOCATIONS CHASE FOR FUTURE USE NOTES: BLANK I.) SEE SHEET 6-5 FOR TABLE (TI TO T3 ONLY) WAWA SUPPLIED MATERIAL FOR SPEGIFIG PART IDENTIFICATION. I" RG ELECTRICAL BLANK (TI TO T2 ONLY) UIT (POWER) OND SUIMF FLAN V I E�N - TAN< G-4 SCALE: I = I'-0" NOTES: 1) SEE SHEET 6-5 FOR TABLE WAWA 5UPPL I ED MATERIAL FOR SPECIFIC PART 4" CORRUGATED DUCT TO T3 T3 PRODUCT PIPING (2" APT XP PIPING) DISCRIMINATING TANK SUMP SENSOR -� I" RG ELECTRICALS CONDUIT (SPARE) 3" FIBERGLASS SLEEVE 5/4" RG ELECTRICAL CONDUIT (LOW VOLTAGE) 4w— JUNGTION BOX GLASS I ENTRY BOOT APT CONDUIT 1 " RG ELECTRI GAL —� CONDUIT (POWER) 2" DUCTED ENTRY BOOT T3 PRODUCT PIPING (2" APT XP PIPING) 4" CORRUGATED DUCT TO TI BLANK CHASE FOR FILL 4" TOP GAP AND FILL FUTURE USE CONNECTION ADAPTOR 4" CORRUE'PATED ° DUCT TO T.2 d d ° d d BLANK CHASE FOR ° FUTURE USE: 10' MAG INVENTORY PROBE NOTES: I.) SEE SHEET 6-5 FOR TABLE WAWA SUPPLIED MATERIAL FOR SPECIFIC PART IDENTIFICATION. GLASS I JUNCTION BOX ;�-.. 42" MANII 8 SKIRT \ 10' MAG INVENTORY - PROBE FE PETRO 2HP NOTES: DOUBLE77-WALLED APT CONDUIT SUBMERSIBLE PUMP I.) SEE SHEET 6-5 SPILL BUCKET ENTRY BOOT E FOR TABLE WAWA All 1 SUPPLIED MATERIAL �?!6 FE PETRO 2HP FOR SPECIFIC: PART 2" DUGT3=D '- SUBMERSIBLE PUMP IDENTIFICATION. 4" GALVANIZED ENTRY BOOT �I APT QUICK. CONNECT METAL RISER WITH 2" XP SERIES GLAMSHEL.L COUPLING 3M CORROSION SECONDARY CONTAINED PROTECTION TAPE PIPE — 0 4" CORRUGATED 11 DUCT O T5 FOR 2 BLANK SECONDARY 4" CORRUGATED _ 2" BALL VALVE TEST SOOT FUTURE USE DUCT (RETRAGTIBILE DISCRIMINATING TANK ONLY) r 4"CORRU6ATED DUCT �— BUNG HOLE SUMP SENSOR (RETRACTIBILITY ONLY) NOTE: NOTES: REFER TO VIEW G-1 I.) SEE SHEET G-5 FOR TABLE FOR CHASE LOCATIONS WAWA SUPPLIED MATERIAL FOR SPECIFIC PART IDENTIFICATION. FLAN \,/ I DN - TAN< 5 6 4/ SCALE: I " = 1'-O" NOTES: I .) SEE SHEET 5 FOR TABLE WAWA SUPPLIED MATERIAL FOR SPEC I F I G PART IDENTIFICATION. 2.) ONLY DUCTING WILL BE ADDED AND NO PRODUCT PIPING INSTALLED LJNLE55 DIRECTED BY A WAWA PROJECT MANAGER. RG ELECTRICAL 5" FIBERGLASS SLEEVE CONDUIT (LOW VOLTAGE) DISCRIMINATING TANK CONDUIT --- SUMP SENSOR ENTRY BOOT I" RG ELECTRICAL CONDUIT (POWER) GLASS I JUNCTION BOX 4 CORRUGATED I" RG ELECTRICAL DUCT TO TI , CONDUIT (SPARE) BLANK CHASE FOR / \ FUTURE USE 10' MAG INVENTORY SUBMERSIBLE PUMP PROBE FE PETRO 2HP a / LEAK DETECTOR / 3.0 GPH MECHANICAL T-4 PRODUCT CROSSOVER PIPING 4" CORRUGATED TO T2 /— DUCT TO 7-5 E 1 SUMP PLAN VIEW - TANK 4 0-4) SCALE: I " = I '-0" BLANK CHASE FOR FUTURE USE NOTE: REFER TO VIEW G-1 FOR CHASE LOCATIONS IDENTIFICATION. NOTES: 2.) ONLY DUCTING WILL BE ADDED AND NO PRODUCT PIPING INSTALLED UNLESS I.) SEE SHEET 6-5 FOR TABLE WAWA SUPPLIED MATERIAL FOR SPECIFIC PART DIRECTED BY A WAWA PROJECT MANAGER. IDENTIFICATION.2.) ONLY DUCTING WILL BE ADDED AND NO PRODUCT PIPING INSTALLED UNLESS 10' MAG INVENTORY BLANK 4" CORRUGATED DIRECTED BY A WAWA PROJECT MANAGER. PROBE CHASE FOR DUCT (RETRACTABLE FUTURE USE ONLY) FROM T-4 3" FIBERGLASS SLEEVE FROM TI (T2 3/4" RG ELECTRICAL ONLY) CONDUIT (LOW VOLTAGE) I" RG ELECTRICAL CONDUIT SPARE CONDUIT ENTRY BOOT II�IIIIIII DISCRIMINATING TANK 4 CORRUGATED SUMP 5E:N5OR DUCT (RETRACTABLE GLASS I ONLY) GLASS I JUNCTION BOX T-5 PRODUCT � \ GROSSOV'ER PIPING JUNCTION BOX TO T4 I " RG CONDUIT �- ENTRY BOOT 4" CORRUGATED �---- 10' MAG INVENTORY DUCT TO T3 , PROBE ELECTRICAL 3/4" RG ELECTRICAL BLANK CHASE FOR / CONDUIT CONDUIT (LOW VOLTAGE) FUTURE USE 3.0 GPH MECHANICAL (POWER) 5" FIBERGLASS SLEEVE o LEAK DETECTOR DISCRIMINATING TANK Elo APT CLAM5HELL / SUMP SENSOR I" RG FE PETRO 2 HP COUPLING \ o I" RG ELECTRICAL ELECTRICAL 1 SUBMERSIBLE PUMP CONDUIT (SPARE) CONDU I T 4" CORRUGATED BLANK (POWER) DUCT (RETRACTABLE CHASE FOR FUTURE USE eQ ONLY) FROM T3 (T2 ONLY) E-FREE PRODUCT 5.0 GPH MECHANICAL E-FREE PRODUCT PIPING PIPING LEAK DETECTOR NOTE: '�` 2 "x2 "x "2 CROSS REFER TO VIEW FE PETRO 2 HP FOR CHASE LOCATIONS SUBMERSIBLE PUMP NOTE: A REFER TO VIEW G-1 FOR CHASE LOCATIONS G SU1"--1f= FLAN VI DN - TAN< :2 '_o�� - F5U1�i� FLAN �I �W fi�N�K � �-J-4SCALE: I"= 1 6-4 SGALE: I SILL RISER DETAIL CG-4 i SCALE: I " = I '-0" Y E I N T/ 4" TOP GAP AND SWIVEL °. .dYAF0R a. ADAPTOR (FOR DIESEL PROVIDE THREADED GAP) add a d c APT QUICK CONNECT GLAM5HELL COUPLING - J SUI�f SECT 1 ON - TAN< 112141$ 5 C-;-4 SCALE: I" NOTES: I.) SEE SHEET 6-5 FOR TABLE WAWA SUPPLIED MATERIAL FOR SPECIFIC, PART IDENTIFICATION. 10' MAC, INVENTORY PROBE - GLASS I JUNCTION BOX 42 MANWAY $ SKIRT — 2 HP VARIABLE SPEED 5TP. 2" BALL VALVE ON OUTLET OF 5TP NOTES: DOUBLE -WALLED I.) SEE SHEET 6-5 SPILL BUCKET 2" DUCTED FOR TABLE WAWA ENTRY BOOT SUPPLIED MATERIAL = FOR SPECIFIC PART 2" XP SERIES IDENTIFICATION. SECONDARY " 5ECONDARY 4" GALVANIZED CONTAINED PIPE TEST BOOT METAL RISER WITH 3M OORRO51ON PROTECTION TAPE =1"'RIGID CONDUIT VAPOR EXTRACTOR VALVE/F I TTI N(5 BUNG HOLE AMERON 3000 FIBERGLASS VENT PIPING \/ENT / VAFOfi� RISER DETAIL FILL 1041 APPROPRIATE BONDING MATERIAL, THEN WRAP ENTIRE JOINT Yil 4" MIN. FIBERGLA55 MATTING, RE51N 4 HARDENER TO TOP 8 BOTTOM JOINTS -LOK ACCESS COVER ADJU5TABLE BODY R15ER 5T-LOK ACCESS COVER UNIVERSAL SUMP BASE GUT HERE AND BOND IN FIELD FOR 42" COLLAR I N5TALLATI ON TURF 1 NE SU1II-I INSTALL DETAIL r7-7 5GALE: I " = I'-0" stillwater TECHNOLOGIES 1700 N. Orange Ave. Suite 100A Orlando, Florida 32804 (407) 206-7222 (407) 206-7223 fax ' FL. Cert. of Auth. #8326 STILLWATER PROJECT #464-182 ,��\\\011 11110/1 �.° o.o 7 `� = STATE OF 4 - _p sP ef�a " fiLy0 R 4D P ° ,d� f11111 NOV 10 2020 Date 4" CORRUGATED DUCT (RETRACTABLE ONLY) DISCRIMINATING TANK SUMP 5EN50R 3" FIBERGLASS SLEEVE SUI�i� SECTION - TANK 5 SCALE: I" = I'-0" BRINE o-IS" BUCKET RESERVOIR 1 \ i 'r . CODE COMPUANC „r u ' SPILL GONTA I NER5 ----OBSERVATION WELL MIN. 2' SOLI D PIPE FROM /-- EVO INTERSTITIAL GRADE / SENSOR (SGHDL 40-PVC) / .020 SLOTTED BUNG HOLES 5CHDL 40-PVC i� II SECTION \/I - V�l TYFIGIL TANiCs FILL I$ 5R I NE RESERV I OR 6-4) SCALE: 5/8" = I '-0" o m TANK SUMP * RI E-j E R. D ETA I LS l NAA, 0RANCGE AVE. (,z-p < I NCG5 HVN'YI z z z cn (S.l�l. CORNER) w cl�LO w w 0 ST. LUGI GOUNT`I, FL Q w Q w Q w w (I)-20,000 CGAL. TANK Val,/ (2)-22,000 OAL. C_IIFAfi'T�ENTALI ZED TAN<S ) m Go w SCALE DATE. DRA WN BY CHECKED BY m C o�a CD ° AS NOTED O�/� I /I � STI LLW,�TER FA5 M cV C51. Z awa 7022 TPC DR., SUITE 200 ORLANDO, FL 32822 PHONE: 407-355-9958 fAX: 407-355-9987 0�z DRAWING NO. 5 OF -r SHEET NO. General Notes I. Petroleum Contractor shall furnish all Items with the exception of the Items "Furnished by Wawa". 2. Contractor shall complete and furnish all documentation as required by the Wawa representative at the time of the punch list Inspection. 5. Operation is to be 24 hours, 7 days a week, attended in accordance with NFPA 30A, Chapter 4 4 Chapter cl. 4. Interior E-stops at cashier positions are detailed on Building Electrical plans, in addition to exterior E-stops shown on these plans. 5. Wawa to provide the required labels 4 warnings detailed in NFPA 309-5.2 4 6. Contractor must use only manufacturer approved tools for installation of all piping 4 dispenser sumps. No use of hax saws, hand saws, 5awzoll, utility knives, etc. will be allowed. 7. The Petroleum Contractor will furnish and Install seal off fittings for the conduit at the canopy columns for connection by the General Contractor. The Petroleum Contractor wlll epoxy plug all seal off fittings as required in the electrical room, at the dipensers, and canopy columns. 8. Petroleum Contractor will receive all Wawa supplied equipment 4 will be responsible for any damage not Identified to Wawa upon delivery. Petroleum Contractor to notify Wawa Project Manager within 72 hours of receiving equipment. a. The Petroleum Contractor will be contracted to complete all tank Installation, petroleum underground piping, backflll, stone subbase, fine grading 4 all electrical conduit rough In assoclated with the pump and tank within time period determined by the Wawa Project Manager. Concrete pour (for the tank area, pump islands, and canopy areas), dispenser installation 4 wiring wlll be scheduled during project wlth Wawa Project Manager. 10. The General Contractor wlll layout tank pad, canopy pad 4 footer locations, excavate, form 4 pour footings for steel canopy, Install canopy drain laterals from canopy columns to storm sewer laterals, Install hose bibs at canopy area. 11. All manhole openings on the tank slab shall be installed with a 2" x 18" run crown of concrete to prevent water intrusion into the manhole. 12. All curbing surrounding tank slab shall be poured monolithic In conjunction with tank slab. Installation All work to be coordinated wlth Wawa Project Manager, General Contractor 4 Sub -contractors (Including coordination of electrical conduit runs to the canopy 4 tank pads with the General Contractor). All installation activities to be performed In strict accordance with PEI "Recommended Practices for Installation of Underground Liquid Storage Systems", PEI/RPI00-05, PEI "Recommended Practices for Installations 4 Testing of Vapor Systems", PEI-RP300-04 or most current PEI versions, manufactures installation manuals for all products, state 4 local code 4 the specifications 4 notes contained In these drawings. Any discrepancy between these sources shall be Identified 4 brought to attention of Wawa's representative before activity is performed for resolution. Contractor is responsible for all local permits. Contact Wawa representative to verify that all required permits have been obtained. Contractor portions of registrations for state agencies shall be completed 4 given to Wawa's representative upon completion. Excavation All excavation to be sized to provide minimum bedding clearance 4 depth of burials o shown. (54" minimum from finish grade to top of tank) Contractor to adhere to all 05HA standards for excavations. All excavations greater that 4 feet in depth are to be shored In accordance with 05HA standard (201GRR 1926.650-652). Fall Protection to be provided around tank excavation at all times In accordance w/applicable 05HA regulations. Prior to backfill 4 tank Installation, filter fabric shall be Installed In accordance with applicable methods. Filter fabric is determined by site specific requirements 4 use shall be determined by Wawa Petroleum Dept. Tanks Tanks will be provided by Wawa 4 delivered to the site by the manufacturer. Contractor Is responsible for scheduling delivery via Wavia's representative, unloading 4 Inspection of tanks. Any problems encountered should immediately be disclosed to the Wawa representative 4 Wawa Fuel Equipment Department before activity is performed for resolution. All tank handling 4 installation is to be In strict accordance with manufacturer's "Installation Manual 4 Operating Guidelines". All checklists Including shipping documents are to be completed 4 provided to Wawa's representative. Wawa requires the use of a crane for all tank handling activities. Tanks shall be installed with zero slope, dead level, with fills towards curb side or as directed by Wawa's representative. All manway bolts to be securely fastened prior to sump Installation. All brine levels to be adjusted to 7 1/2" after tanks have been secured with hold down water. Tanks shall be installed, backfllled to top of tank 4 filled with water ballast the day they are delivered. Deviation from this process must be authorized by Wawa's representative. Scheduling is imperative to meet the process. Tanks shall be U.L. listed (UL-1516) as called for on the site specific drawing 4 shall be fiberglass reinforced plastic (frp) doulble wall tanks. Installation of tanks 4 piping shall be In accordance with the latest edition of the installation manual's as provided the manufacturer. Prior to testing, the gasoline contractor shall verify manway bolt tightness. Verify bolts are set per manufacturer's torque settings 4 adjust as necessary. Backf I I I Wawo recommends that all back fill is to be Pea Gravel, naturally rounded aggregate nominal 1/4" (1/8" min., 5/4" max) In size. Pea 6ravel is to be washed, free flowing, free of ice, snow and debris 4 conform to ASTM 0-55 par. cl.l, size numbers 6 through 8 of Table 2. When Pea 6ravel is not readily available crushed stone may be used. The material is to be a mix of angular particles, sizes between 1/8" and 1/2", and no more than 5% (by weight) of the material mall pass through a #8 sieve. The Contractor will provide Wawa's representative certification from the supplier that the material conforms to A5TM 0-55 4 any other applicable specification. Disposal of Excavated Material All excavated material Is to be treated as clean back fill, removed 4 disposed by contractor. Warva's representative must be notified immedlately If any contaminated materials are encountered or suspected. In the event contaminated material Is encountered, such material is to be segregated by contractor 4 1,4111 be transported 4 disposed by third party. Anchoring All tanks are to be anchored as shown on drawings. Deadmen may be field constructed or prefab as available from tank manufacturer. Contractor to use reinforced precast concrete deadmen, length typically equal to the length of the tank, with anchor bolts to correspond with straps. All tank straps must be provided by tank manufacturer 4 Installed In strict accordance with manufacturer Instructions 4 spaced as directed. Connect anchor to straps with 5/4" forged steel turnbuckles. All exposed turnbuckles 4 anchor bolts must be wrapped 4 coated with mastic 4 protected with 18 lb. anodes per tank side. Wire rope may not be used. PPing Product piping Is to be 2" dio. APT XP Series In ducting. All runs are to be continuouos, all Joints are to be made In dispenser containment units 4 tank sumps only. A separate ball valve is required for each piping run. Piping connections to submersible pump to be 2" galvanized or approved stainless steel flex line. Contractor will provide loading 4 credit given to Wawa for All entry boots 4 fittings are to be APT product only. Risers 4 transportation 4 disposal. fitting to shear valves are to be UL listed stainless steel flexible connectors. Excavation Dewaterina Wawa will provide soils 4 groundwater data for site to determine if dewatering is necessary. Contractor shall be responsible for installation of all dewatering equipment, if necessary, 4 shall furnish pumps with appropriate dewatering rates for use In 4 around the excavation to maintain as dry an excavation as possible. Contractor shall be responsible for any required permits to discharge water to the closest available source. In the event that these measures are not sufficient to control the dewatering, Wawa's representative shall be notified 4 Wawa shall secure third party services to assist in dewatering. Contractor is responsible for continuous monitoring of ground water until facility is open. Testin Final precision testing of tanks, lines will be performed for Wawa by third party. All other testing is to be performed by contractor 4 witnessed by Wawa's on site representative. All testing shall be performed in accordance with manufacturer instructions. Contractor shall perform air test on tanks at time of delivery. Use 5 - 5 psi for a minimum of 60 minutes. Primary piping to be air tested at 50 psi for a minimum of 60 minutes while soaping Joints. (Do not exceed 60ps1 max) Secondary testing to be performed of no more than 5 psi for a minimum of 60 minutes. Air testing must remain 1n place on all piping (primary 4 secondary), with appropriate gauges until dispensers are set in place. Gauge reading needs to be documented that air test Is good prior to dispenser set process. Upon completion of dispenser set process, an additional air test must be performed again on all piping until product Is delivered 4 purge process begins. All sumps, including tank, spill bucket and dispenser to be hydrostactically tested In accordance with Federal, state 4 local regulations. At a minimum all sumps should be tested with water to a level 6" above highest Joint or penetration for a minimum of 8 hours and verified liquid tight by the installing contractor. Initial 4 ending water level measurements to be observed by a Wawa representative. Failure to perform this test w►II result in a retest 4 subsequent repairs at contractors expense. All tests shall be recorded and given to Wawa's representative and included in the closeout documentation. Hold Pown Product Water Is to be used as hold down. Water is to be clean, free of debris 4 particles. Contractor Is responsible for securing and disposing of water. Tanks are to be filled to min. clO% capacity. Prior to removing water contractor Is to provide -12-hour notice to Wawa's representative. Wawa will make arrangements for delivery of product to replace water; all measurable levels of water shall be removed prior to replaclnq with gasoline. Verification of water removal shah to WaWa's representative. Water should remain in tanks until oleum work Is completed 4 tank mat Is installed. Conduit Requirements: See E I to E 5; Verify with k onopy drawings by architect NOTE: Conduits to be stO-' edge of canopy and tank pads by general contractor n contractor is responsible for balance. - (1) 1" 6RG to eOCF. 1 column for spare. (column closer Store) - (1) 1" 6RC: to each cc column for lighting. (column furthest i store) - (5) 1" 6RG to each dlbpe>rf3er. (I power, I data, I intercom/Muzok) - (1)" 6R0 to each dispenser. (Sump sensor) - (1)" 6RG to each Interstitial reservoir. (Sump sensor) - (2) 1" 6RG to each 5TP tank containment unit. (I power, I spare) - (1) 6RC to each 5TP tank containment unit. (Sump sensor/ Tank level magnostrictive probe) - (1) 6RG to each multi -port containment unit. (Sump sensor) - (2) 1" GRC to vent stack for overfill alarm 4 pressure device power. Pipe Testing Testing of the secondary containment piping Is required. The containment termination fitting In the sump is to be Installed with the valve turned down. After testing, the valve is to be opened to allow drainage of the secondary piping to the sump monitor probe. STEEL FITTINGS DIMENSIONS MATERIAL THREAD Steel Pipe Nipples ASTM A 53 ASME A5ME Glass 150/PN 20 A5TM A 755 (F 4 E) 5.120.1 5.1 16.3 Steel Pipe Nipples A5TM A 55 A5ME SAME Glass 150/PN 20 N/A (F 4 E) 6.1 20.1 5.1 16 3 Schedule 40 U.CG Conduit All U.G. conduit shall be rigid galvanized steel. Conduit minimum bury depth Is 24" per coda. All Junction boxes shall be class I div. 2 rated. All electrical conduit In sump shall Include o seal -off entering 4 leaving, which shall be Installed 6" min. above highest penetration in sump. Dispenser conduits to be installed through metal sump top conduit knockouts. Sump Penetrations All penetrations of the tank sumps shall be sealed with double bulkhead fittings 4 not to exceed 151,6 angle in any direction to ensure the proper installation of all bulkhead compression fittings 4 resultant of water tightness. 611barco Dispenser Installation Contractor shall install all dispensers In accordance with most current manufacturer installation practices. Strict adherence to Installation guidelines should be followed at all times. Dispenser DATA communication wiring shall be Installed In separate conduit 4 shall be twisted pair, minimum 18 gauge, color coded for data 4 GRIND wiring, 150 rated 600 volts, oil 4 gas resistant. Wiring shall be home run Prom dispenser to universal distribution box (D-Box) with no splicing. (See chart below) The dispenser communication DATA/FUEL loop shall be wired in a manner that will allow for dispensers to be split equally on each distribution board In the Fuel loop D-box. The dispenser communication GRIND loop shall be wired in a manner that will allow for dispensers to be on one (1) distribution board In the GRIND loop D-Box. Dispenser power wlring shall be run in separate conduit 4 shall be 12 A1046 with home runs from the dispenser to the breaker panel or isolation relay. Two (2) Spare wires of different color to be run also, terminating in J-box 4 trough in electrical room. GILBARCO DISPENSER WIRE COLOR REFERENCE yQ,_ COLOR MIN, AWG UaL 1 BLACK 12 HOT TO A-2 2 WHITE 12 NEUTRAL TO A-13 3 GREEN 10 GROUND TO A-10 4 RED 12 TO PREMIUM STP 5 BLUE 12 TO RUL STP 6 YELLOW 10 SPARE 7 BROWN 12 SPARE 8 BLACK 18 TO A-9 (PUMP 2 WIRE IN (+)) TWISTED PAIR, NON -INSULATED, 9 RED 18 TO A--19 (PUMP 2-WIRE OUT (-)) NON SHIELDED 10 PURPLE 18 TO B-9 (CRIND 2 WIRE IN (+)) TWISTED PAIR, NON -INSULATED, 11 YELLOW 18 TO B-19 (CRIND 2-WIRE OUT (-)) NONSHIELDED Incon Tank Gauge Installation All Automatic Tank Gauge (ATG) installation 4 wiring to be performed in full accordance manufacturer's Installation manuals. Contractor 4 electrical contractor performing AT6 Installation must have manufacturer installation certification. All probe and sensor wiring splices shall use manufacturer supplied :splice kits 4 contained in a Glass I electrical Junction box. All probe and sensor wiring must be 18AW6 min shielded 'Belden' cable or equivalert. Specific attention must be given to Manufacturer grounding requirements (#12 AWG conductor, buried ground to earth ground bus at (power distribution panel). Installation Includes Overfill Alarm and acknowledgements switch on vent: riser. Overfill should be wired to Relay Output; I located the Power Supply Module. Positive, shut down of submersible controllers must be wired via the automatic tank gauge (ATG) Turbine Pump Interface (TPI) port. It Is the petroleum installation contractor's responsibility to run appropriate data cabling to properly shut off all5TP's In an individual manner as controlled by the AT6. Except for the Unleaded 5TP'5, each STP should have a home run wiring from the specified STP controller Isolation relay box (STP-PHI) to the appropriate 5TP controller (MAG). Unleaded 5TP's should have a home run wiring from the Isolation relay box to the AT'6's AG Input Module (Channel 1). Programming of the ATG will be the responsibility of the local programming/start up contractor selected to service the location. Goord►notlon should be taken between the Installation contractor and the programming / start up contractor to Insure that proper wiring and programming corresponds to the requirements for positive shutdown process. Tank Leveling Requirement Installation and programming required for all compartmentalized U5T sites. Wiring to be added to all sites regardless of tank style and layout. Contractor will Install one (1) 5-concuctor "loop" data shielded cable from ATG console Communication Port (R5-485) to the corresponding MAG-VFC's TPI ports as shown. Sump sensors Sensors to be mounted at side of tank where product penetration Into sump is made 4 below lowest penetration fitting within sump area. Mount sensor flush to lowest point In sump bottom. All tank sump sensors shall be discrim►nating for the presence of hydrocarbons. Equipment Start -Up/ Purging 4 Calibration Contractor shall notify Wawa representative 72 hours prior to equipment startup. Dispenser, tank monitor 4 submersible pump commissioning to be performed by service vender as selected by Wawa. Permanent electrical service to store must be installed prior to equipment startup. EVO to be operational upon gas entering the tanks. Upon completion of equipment commissioning by service vendor, Contractor shall purge all dispensing equipment in accordance with manufacturers' standard practices. Wawa requires a minimum of 150 gallons be purged from each meter after air is removed from product lines. Purging of air from the product lines shall be accomplished using the product piping shear valve. Product shall be purged until no air is observed; a minimum of 50 gallons per shear valve. Initial purging of air shall NOT be done using the nozzle. Severe damage may occur to dispensing equipment. If damage occurs, Contractor is responsible for all repairs. Refer to manufacturer's instructions for proper purging procedures. Failure to purge from the shear valve wlll result in fortifelture of final payment. Petroleum Contractor shall return to the site to purge 4 collbrote pumps, 4 shall return to the site for start up by a third party, as scheduled by the Wawa Project Manager. Petroleum Contractor to be onsite during all third party testing activities. The brine level In the tanks shall be verified 4 adjusted to 6 Y2" at greater than one tank capacity prior to store opening. Wawa Petroleum Closeout Documentation Needed The following Items are required at the time of completion from all gasoline installation contractors: I. Tank Installation Checklists 4 associated delivery bill of ladings. 2. Product Piping Warrantly Sheet - completed and signed. 3. Tank Registration 691211cation or Permit (If applicable). Please forward to the Wawa Enviromental Department two (2) weeks after the Installation of U5Ts. 4. Flammable Liquid Permit (If applicable; 1-41 In PA, must have signature of final inspection) 5. Tank and Line Test Results (from Crompco) 6. Weight 4 Measure Notification (written) 4 completed calibration Forms. 7. EVO Warranty Reglstration Form (Provided by Start-up Contractor) 8. 6llbarco Commissioning Checklist (Provided by Start-up Contractor) ci. Pictures of the entire Installation process (tanks, piping and completed fuel court) 10. As -built drawinas for underground tanks, piping, conduits, and any utilities. 11. Pea gravel certification of ASTM C-53 from store supplier. Two (2) of each of these items need to be delivered by the petroleum contractor at the time of the gasoline punch list walk. Failure to provide the proper documentation w►II delay and/ or forfeit final payment. WAWA SUPPLIED MATERIAL PART NUMBER DESCRIPTION DISPENSERS DHW-3617 APT FIBERGLASS DISPENSER SUMP SBK-3 APT STABILIZER BAR FSS-50 PISCES FIRE EXTINGUISHER (PAONLY!!) 1OP-0152 OPW PRODUCT SHEAR VALVE FF15X18EZMXEZFFT FLEXINGTEE FLEX CONNECTOR B2KMP-R200 SS45o Elbow Fitting QR90TREE SS 90o elbow fitting QRSPOOL SS Connector spool 362-206-03 EBW VAPOR SHEAR VALVE FFEZ01X18-2FG90 FLEXING 2" 90o FG X 1-1/2IViNPT WAWA ISLAND II 3'X5'X13" SS ISLAND FORM RDEB-200-SC APT RIGID ENTRY BOOT 408090001 APT BLANK FOR RIGID ENTRY BOOT SMA-2020 ENVIRONTO NPT CONVERSION FITTING SBC-2200 2" SWIVEL BARB FITTING 124284 IRPCO 8'6 X 3/41N. MSXMS CURB HOSE 124026 IRPCO 81N. X 3/41N. MX MS WHIP HOSE 159597-03 HUSKY 1+XS DIESEL NOZZLE (GREEN) 159543-04 HUSKY 1+XS GAS NOZZLE (BLACK) 2273 HUSKY DIESEL BREAKAWY TANKS 708592901 EBWSHUTOFFTUBE EOH-FDC-1 DROP TUBE DEBRIS COLLECTOR/FILL STRAINER 1C-3112P OPW DW SPILL BUCKET FOR VAPOR 1C-3112D OPW DW SPILL BUCKET FOR VAPOR FL-90 FIBRELITE 36" MANHOLE ASSEMBLY PC4550U-3C2 PC[ SUMP WITH TWIST LOK LID 633T-8070 4" X 3" DIESEL FILL ADAPTER 634TE-7085 DIESELFILLCAP 311-400-11 EBW EXTRACTOR 412-40 EXTRACTOR VALVE CAP (diesel riser) SWV-101-SS EBW VAPOR SWIVEL 21BV-0200 OPW 2" Ball Valve 1711LPC-0300 OPW LOW PROFILE VAPOR CAP 17-1/2#ANODE ZINC BAG ANODE 3/4X18-TURN TURNBUCKLE 810-4-K EBW SITE WELL KIT (no manholes) (4 i n MD) F-20-FF-LCX BRAVO 2" ENTRY BOOT W/ EPDXY F-10-FF BRAVO CONDUIT ENTRY BOOT W/EPDXY 329356-002 PROBE MODULE 329358-001 SENSOR MODULE 329359-001 FOUR RELAY OUTPUT MODULE 846390-110 10'6" MAG PLUS PROBE 846400-001 DIESEL INSTALL KIT 305XPA 4" CAP AND ADAPTOR 794380-352 DISCRIMINATING TANK SUMP SENSOR 794380-303 DUAL FLOAT HYDRO SENSOR EOHSMBA UNIVERSAL SENSOR MOUNT KIT FEB-400-R APT 4" ENTRY FOR RISERS & OW'S (Brines) FL-180 FIBRELITE 18" ENCLOSED MANWAY FL-100 FIBRELITE 42 MANHOLE 23-0033 OPW UPDRAFT VENT FOR DIESEL M-1600 RISER SUPPORT BRACKET 21BV-0200 OPW 2" Ball Valve 3/4X18-TURN TURNBUCKLE 810-4-K EBW SITE WELL KIT (no manholes) (4 in MD) FL-7A FIBRELITE LIFTSTICK FL-FRP-ID FIBRELITE ID PLATES FP-500 FILLPIPEIDTAG STP-DHI FE PETRO ISOLATION BOX ISTM-2 FE PETRO 2HP SUB PUMP MAG-VFC FE PETRO CONTROLLER STP-MLD-D FE PETRO DIESEL LEAK DETECTOR 623V-3203 OPW PRESSURE VAC VENT S11-VENT VENT STACK SUMP (MID ONLY) GAS MONITORING SYSTEM T550EDP/R EVO DISPLAY, PRINTER TS-ACI 12 I N P UT AC INPUT TS-PRB 12INPUT PROBE TS-3WSNS 81NPUT3WIRE TS-RLY 8INPUT RELAY OUTFI T FMP-LL3-131 LEAK DET/ INV MAG LL3 PROBE 131" TSP-IGF4P 4" FLOAT SET FOR UP TO E15 TSP-IDF4 DIESLLINSTALLKIT TSP-C4A INVENTORY PROBE INSTALLKIT FMP-DTS DISCRIMINATING TANK SUMP SENSOR FMP-DDS DISC. DISP. PAN SENSOR FMP-HIS-XL HYDRO INTERSTITIAL SENSOR XL TS-RA2 OVERFILLALARM TS-RK ALARM ACKNOWLEDGEMENT SUBMERSIBLE PUMPS STP-DHI FE PETRO ISOLATION BOX ISTM-2 FE PETRO 2HP SUB PUMP MAG-VFC FE PETRO CONTROLLER STP-MLD-D FE PETRO DIESEL LEAK DETECTOR FUEL LINE PIPING XP-200-SC APT 2" PIPING DCT-400 APT 4"CONDUIT MS-XP-200-200 APT CLAMSHELL COUPLING (Tank field) QRS-XP-200 APT QR COUPLING (MPDs) BPT-200 APT BY-PASS TUBE STB-200 APT SECONDARY TEST BOOT TRK-200 APT TEST KIT DISPENSER PACKAGE ENC700S NN2 ENCORE 700S 4+0 BLENDER DISPENSER, GASOLINE 4 GRADE, 2 HOSE OUTLETS, 2 SIDES W/SITE SPECIFIC OPTIONS ENC700S NL2 ENCORE 700S 4+1 BLENDER DISPENSER, GASOLINE 4 GRADE + DIESEL, 4 HOSE OUTLETS, 2 SIDES W/SITE SPECIFIC OPTIONS ENC700S N15 ENCORE 700S 3+1+1 BLENDER DISPENSER, GASOLINE 3 GRADE + DIESEL+ FLEX, 6 HOSE OUTLETS, 2 SIDES W/SITE SPECIFIC OPTIONS PA0261000022 DISTRIBUTION BOX (2 BOARD)