Loading...
HomeMy WebLinkAboutEnginerred letter ACB2 Engineering Inc. Testing & Engineering Services Certificate of Authorization 8131 P.O. Box 823612 Pembroke Pines, Florida 33082 Ph : 954-245-8976 To: St. Lucie County, November 2°d, 2021 Building Department Re: After the Fact Flat Roof Inspection ��11 For Residence located at: 787 NE Prima Vista Boulevard, oePa�t' Port St. Lucie, Fl Contractor/Permit No: Superior Roofing/2109-0354 Dear Building Official: This letter is to advise Building Department that we have performed an inspection and reviewing the photographs for the flat roof system work installation. Based on our roof inspection, we found the following: The Iso boards were fastened as follows: The 1' zone was fastened with screws and plates 9 per board. The field was fastened with screws and plates 12 per board. The perimeter was fastened was fastened with screws and plates 12 per board. The corners were fastened with screws and plates 12 per board. Two layers of All Weather membrane were hot mopped to the insulation boards and the last layer of GMS modified was also hot mopped over the roof system. Based on our inspection and reviewing the roofing work, we can certify that the referenced work has been performed in conformance with the permit and 2020 FBC 7`h edition. Please note we consider this letter an after the fact inspection to cover for inspections normally performed by the building officials during roof construction. This inspection does not cover roof drainage and does not provide a guarantee against roof leaks since these are still responsibilities of the contractor. Cordially,ACB2 Engineering Inc. Antonio Acevedo, P.E. # 36466 gECENED ACB2 Engineering Inc. Nov ZVI Testing & Engineering Services counw Certificate of Authorization 8131 St.P '"Q P.O. Box 823612 Pembroke Pines, Florida 33082 Ph : 954-245-8976 To: St. Lucie County, November 2°d, 2021 Building Department Re: After the Fact Flat Roof Inspection For Residence located at: 787 NE Prima Vista Boulevard, Port St. Lucie, 171 Contractor/Perin j No: Superior Roofing/2109-0354 Dear Building Official: This letter is to advise Building Department that we have performed an inspection and reviewing the photographs for the flat roof system work installation. Based on our roof inspection, we found the following: The Iso boards were fastened as follows: The V zone was fastened with screws and plates 9 per board. The field was fastened with screws and plates 12 per board. The perimeter was fastened was fastened with screws and plates 12 per board. The corners were fastened with screws and plates 12 per board. Two layers of All Weather membrane were hot mopped to the insulation boards and the last layer of GMS modified was also hot mopped over the roof system. Based on our inspection and reviewing the roofing work, we can certify that the referenced work has been performed in conformance with the permit and 2020 FBC 71n edition. Please note we consider this letter an after the fact inspection to cover for inspections normally performed by the building officials during roof construction. This inspection does not cover roof drainage and does not provide a guarantee against roof leaks since these are still responsibilities of the contractor. Cordially,ACB2 Engineering Inc. Antonio Acevedo, P.E. # 36466 ', 0a ��