Loading...
HomeMy WebLinkAboutLetter; Deferred SubmittalsWe do more than building PCORPORAONbuildings, ��9hj,' we're building Sb�tlons. ,: Internet:www.rkdavis.corin CCCO53853T' Si,' J �5 0 December 15, 2021 s�m�fPin�h� Andrew Manero St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, Florida 34982 RE: Maverick Boats — Phase 2 — Gel & Grinding Booths Deferred Submittals errnit No. 2 OMNI Dear Andrew: Please see attached documents being submitted to satisfy the deferred submittal requirement for the above reference permit. 1) Provide Wind Load Compliance on the Exhaust Stacks. On the Ventilation Solutions drawings, page V-8, detail "F" provides the guy wire details and their connection to the pre-engineered metal building structure. Attached please find engineering letter from MBI Companies, Inc. providing the loads created by the guy wires to the metal building structure. Also attached please find an engineering letter indicating that the metal building structure is "adequate and structurally sound" to accept the loads shown. 2) Provide a copy of the separate fire alarm/sprinkler permit. Signed and sealed fire alarm and fire sprinkler drawings are attached for your records. A Fire Marshal fire alarm permit and a Fire Marshal fire sprinkler system permit is also attached. Thank you for assisting us with this project. Sin erely, R ger A. riesit Project Manager ill.. i1 .1