HomeMy WebLinkAboutLetter; Deferred SubmittalsWe do more than building PCORPORAONbuildings,
��9hj,' we're building Sb�tlons.
,: Internet:www.rkdavis.corin
CCCO53853T' Si,' J �5
0
December 15, 2021 s�m�fPin�h�
Andrew Manero
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, Florida 34982
RE: Maverick Boats — Phase 2 — Gel & Grinding Booths
Deferred Submittals
errnit No. 2 OMNI
Dear Andrew:
Please see attached documents being submitted to satisfy the deferred submittal requirement for the
above reference permit.
1) Provide Wind Load Compliance on the Exhaust Stacks. On the Ventilation Solutions drawings,
page V-8, detail "F" provides the guy wire details and their connection to the pre-engineered
metal building structure. Attached please find engineering letter from MBI Companies, Inc.
providing the loads created by the guy wires to the metal building structure. Also attached
please find an engineering letter indicating that the metal building structure is "adequate and
structurally sound" to accept the loads shown.
2) Provide a copy of the separate fire alarm/sprinkler permit. Signed and sealed fire alarm and fire
sprinkler drawings are attached for your records. A Fire Marshal fire alarm permit and a Fire
Marshal fire sprinkler system permit is also attached.
Thank you for assisting us with this project.
Sin erely,
R ger A. riesit
Project Manager
ill.. i1 .1