Request for -Day Temporary Power Release
Date:. �_ Z Permit Number
°roject Addr ss;
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL € OWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMEN 1` IN PREPARATION FOR A FINALINSPELTION. IN CONSIDERATION OF APPROVAL OF THE
REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FCILkOWS!
I. 'rears temporary pourer release is mquested for the above stated purpose only, and there will be no
occupancy of ,any typo, other than that permitted by construction during this time Period.
2, As witness by Our signatures, we hereby agree to r bide by all terms and conditions of this agreement,
including Building Division Policy, which is incorporated herein Cry reference.
a, All conditions end requirements listed in the adachao document entitled "Requirements for 30 Day
Power ('ec iesting" have been fulfillers and the premise is ready for cmepliance inspection.
4. All reteluests for an extension boyorld 30 days must be made in writing to the Building Official staling
the reason for the request, Power may be removed from the site and/or a Stop Work Order issued if
then Firral inspection has not been approved within 30 clays. A tea of $100,00 will be required to Btt
the Strop Work Oidor.
WE HEREElY RELEASE AND AGREE TO HOLD HARMLESS, ST, LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABII I iIETND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANS CTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE
DISCONNE CTfO OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT,