HomeMy WebLinkAboutTrugard Vinyl Skirting021 TruGard�
Deo2rtment PREMIER
e County VINYL SKIRTING
White
o Optional, self -ventilating 13" wide
panels with patented interlock design
and easy accessibility
Cameo
2-piece top trim system securely holds
panels in place
® Solid 13" wide panels with patented
interlock design and easy accessibility
Victorian
Gray
° Ground spikes fasten vinyl ground
channel in place
0 Vinyl ground channel can be shaped to
Sand
follow the contour of the ground to hold
panels securely
T R U G A R D G®MPGNEI°J I 'LUNID RF P CEMENT PARTS
Maintain your investment with premier quality skirting from TruGard
CODE
DESCRIPTION
LENGTH
PACK. DATA
WHITE
CAMEO VICTORIAN
GRAY
SAND
A
15 TLVMS
— ---
SOLID SKIRTING PANEL (13" EXPOSURE)
..-------
12 FT.
- —
15 PC/CTN
...- - ----- -----------
0201040
----------
0201057
0200954
0201055
B
15 VENT
VENTED SKIRTING PANEL (13" EXR)
12 FT.
15 PC/CTN
0201028
--
0201058
0200953
0201054
C
TTF
TOP TRIM FRONT —
12 FL
40 PC/CTN—
_ 0201020
0201060
0200950
0201051
D
Tim
TOP TRIM MOUNTING
12 FT.
40 PC/CTN
0201021
0201059
0200951
0201050
E
VGC
VINYL GROUND CHANNEL
12 Fr.
_
40 PC/CTN
0201022
0201061
0200952
0201052
F
SP/NAIL
NAIL & SPIKE KIT
128 SPIKES/
0201065
---
256 NAILS
- _
7" SKIRTING SPIKE
------------------------
100/BUNDLE
---
0201070
1" HEX HEAD SCREW 500 PER BOX
---....... ------ —
WINDGUARD 24 IN. 32 PER BUNDLE 0200818
POLYCLIP® SKIRTING ATTACHMENTS 50 PER BAG
B. VENTED PANEL
(15VENT)
�i-
C. TOP TRIM FRONT D. TOP MOUNT
(TTF) (TTM)
0263102
0201075
E. VINYL GROUND . GROUND SPIKES
CHANNEL (V�� &
NAILS (SP/NAIL)
G®
ter.•.. A uu1/ CJ11 1
V �
STYLEC -qr-,F-SE
Fiberglass Step ;Anchoring
Guidelines
Concrete installation
C.ist of Components (PU11;11�Sed Locally)
i
C i
. '' II 2.Grh7/�E'x:�Ox2�4"E',cits
2t-)ch I/-Vx20x 1741its
2ewh 2uxh U4' ! 4 r1� 1hE"'NYC
Lraa*t Chuac I
Ar4W 2 �1411/'r' N��s
Concrete Installatiorj Guidelines
1) Drill f4" hole through step and bracket at
desired position ;1
hrough lower wooden
frame member.
2) InstaIl L-brackets using '/1'3 x 20 x 2 3/4"
Bolts, washers, and nuts,
3) Mark location o:f"hole in L-Bracket on the
concrete.
4j Move the step away .from the home. Drill
holes- in concret6 at the desired locations,
Tap in %4y' conc�ete acicliors.
5) Replace step so hat the tops of the concrete
anchors protruck through the L-Brackets.
Secure with the!:
iiuts and washers,
Grou°rld° i`n tat.iation.
List of Components
(2) 494154 Anchor Assemblies
Each assembly Includes:
(1) 'IS inch Anchor
(1) 3/8" x 1 %a" lag screw
(1) 7/16" X 1 J/" washer
Ground Installation Guidelines
1) Set step in desired position and mark the
anchor placements on the ground. Remove
step.
2) Screw the anchors in the ground so that the
eye of the anchor will be in the position as.
shown.
3) .Replace step and mark the place where the
hole ki the eye of the anchor meets the side
ort'he stop at the height of the lower frame
member.
4) Fastcn screw into lower frame member
though eye of the anchor and washer.
VU'AA1EtN I4G: p'ailure to anchor the step properly
can result in injury. place'the step aagairrst the
house. Make sure the surface on which the step
rests is level.
Style Crest,.Inc. Drawer A Fremont, Ohio 43420