Loading...
HomeMy WebLinkAboutTrugard Vinyl Skirting021 TruGard� Deo2rtment PREMIER e County VINYL SKIRTING White o Optional, self -ventilating 13" wide panels with patented interlock design and easy accessibility Cameo 2-piece top trim system securely holds panels in place ® Solid 13" wide panels with patented interlock design and easy accessibility Victorian Gray ° Ground spikes fasten vinyl ground channel in place 0 Vinyl ground channel can be shaped to Sand follow the contour of the ground to hold panels securely T R U G A R D G®MPGNEI°J I 'LUNID RF P CEMENT PARTS Maintain your investment with premier quality skirting from TruGard CODE DESCRIPTION LENGTH PACK. DATA WHITE CAMEO VICTORIAN GRAY SAND A 15 TLVMS — --- SOLID SKIRTING PANEL (13" EXPOSURE) ..------- 12 FT. - — 15 PC/CTN ...- - ----- ----------- 0201040 ---------- 0201057 0200954 0201055 B 15 VENT VENTED SKIRTING PANEL (13" EXR) 12 FT. 15 PC/CTN 0201028 -- 0201058 0200953 0201054 C TTF TOP TRIM FRONT — 12 FL 40 PC/CTN— _ 0201020 0201060 0200950 0201051 D Tim TOP TRIM MOUNTING 12 FT. 40 PC/CTN 0201021 0201059 0200951 0201050 E VGC VINYL GROUND CHANNEL 12 Fr. _ 40 PC/CTN 0201022 0201061 0200952 0201052 F SP/NAIL NAIL & SPIKE KIT 128 SPIKES/ 0201065 --- 256 NAILS - _ 7" SKIRTING SPIKE ------------------------ 100/BUNDLE --- 0201070 1" HEX HEAD SCREW 500 PER BOX ---....... ------ — WINDGUARD 24 IN. 32 PER BUNDLE 0200818 POLYCLIP® SKIRTING ATTACHMENTS 50 PER BAG B. VENTED PANEL (15VENT) �i- C. TOP TRIM FRONT D. TOP MOUNT (TTF) (TTM) 0263102 0201075 E. VINYL GROUND . GROUND SPIKES CHANNEL (V�� & NAILS (SP/NAIL) G® ter.•.. A uu1/ CJ11 1 V � STYLEC -qr-,F-SE Fiberglass Step ;Anchoring Guidelines Concrete installation C.ist of Components (PU11;11�Sed Locally) i C i . '' II 2.Grh7/�E'x:�Ox2�4"E',cits 2t-)ch I/-Vx20x 1741its 2ewh 2uxh U4' ! 4 r1� 1hE"'NYC Lraa*t Chuac I Ar4W 2 �1411/'r' N��s Concrete Installatiorj Guidelines 1) Drill f4" hole through step and bracket at desired position ;1 hrough lower wooden frame member. 2) InstaIl L-brackets using '/1'3 x 20 x 2 3/4" Bolts, washers, and nuts, 3) Mark location o:f"hole in L-Bracket on the concrete. 4j Move the step away .from the home. Drill holes- in concret6 at the desired locations, Tap in %4y' conc�ete acicliors. 5) Replace step so hat the tops of the concrete anchors protruck through the L-Brackets. Secure with the!: iiuts and washers, Grou°rld° i`n tat.iation. List of Components (2) 494154 Anchor Assemblies Each assembly Includes: (1) 'IS inch Anchor (1) 3/8" x 1 %a" lag screw (1) 7/16" X 1 J/" washer Ground Installation Guidelines 1) Set step in desired position and mark the anchor placements on the ground. Remove step. 2) Screw the anchors in the ground so that the eye of the anchor will be in the position as. shown. 3) .Replace step and mark the place where the hole ki the eye of the anchor meets the side ort'he stop at the height of the lower frame member. 4) Fastcn screw into lower frame member though eye of the anchor and washer. VU'AA1EtN I4G: p'ailure to anchor the step properly can result in injury. place'the step aagairrst the house. Make sure the surface on which the step rests is level. Style Crest,.Inc. Drawer A Fremont, Ohio 43420