Loading...
HomeMy WebLinkAboutAPPROVED TRUSSCUTSAlpine, an ITW Company 6750 Forum Drive, Suite 305 Orlando, FL 32821 Phone: (800)755-6001 www.alpineitw.com Site Information:Page 1: Customer: Central Florida Truss, Inc.Job Number: 21-0821 Job Description: /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Address: 2962 BENT PINE DRIVE, Port St Lucie, FL Job Engineering Criteria: Design Code: FBC 7th Ed. 2020 Res.IntelliVIEW Version: 20.02.01A JRef #: 1Xbb7610005 Wind Standard: ASCE 7-16 Wind Speed (mph): 170 Design Loading (psf): 55.00 Building Type: Closed This package contains general notes pages, 65 truss drawing(s) and 3 detail(s). Item Drawing Number Truss Item Drawing Number Truss 1 347.21.0852.52539 T1 2 347.21.0852.51788 T2 3 347.21.0852.52866 T3 4 347.21.0852.52914 T4 5 347.21.0852.53038 T5 6 347.21.0852.53069 T6 7 347.21.0852.52913 T7 8 347.21.0852.51773 T8 9 347.21.0852.52413 T9 10 347.21.0852.51741 T10 11 347.21.0852.52381 T11 12 347.21.0852.51678 T12 13 347.21.0852.51413 T13 14 347.21.0852.51975 T14 15 347.21.0852.52554 T15 16 347.21.0852.51319 T16 17 347.21.0852.52631 T17 18 347.21.0852.51366 T18 19 347.21.0852.51648 T19 20 347.21.0852.52633 T20 21 347.21.0852.52663 T21 22 347.21.0852.52148 T22 23 347.21.0852.52194 T23 24 347.21.0852.52678 T24 25 347.21.0852.51866 T25 26 347.21.0852.52725 T26 27 347.21.0852.51381 T27 28 347.21.0852.52149 T28 29 347.21.0852.52086 T29 30 347.21.0852.52460 T30 31 347.21.0852.51647 T31 32 347.21.0852.51632 T32 33 347.21.0852.51382 T33 34 347.21.0852.52085 T34 35 347.21.0852.52664 T35 36 347.21.0852.52834 T36 37 347.21.0852.52131 T37 38 347.21.0852.52241 T38 39 347.21.0852.52288 T39 40 347.21.0847.05357 V1 41 347.21.0847.06413 V2 42 347.21.0847.07543 V3 43 347.21.0847.08567 V4 44 347.21.0847.09630 V5 45 347.21.0847.10600 V6 46 347.21.0847.11733 J1 47 347.21.0847.12727 J1T 48 347.21.0847.13800 J2 49 347.21.0847.14803 J3 50 347.21.0847.15743 J3G 51 347.21.0847.33943 K1 52 347.21.0847.51423 K1T Florida Certificate of Product Approval #FL1999 Printed 12/13/2021 9:06:00 AM 12/13/2021 COA #0 278 Alpine, an ITW Company 6750 Forum Drive, Suite 305 Orlando, FL 32821 Phone: (800)755-6001 www.alpineitw.com Site Information:Page 2: Customer: Central Florida Truss, Inc.Job Number: 21-0821 Job Description: /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Address: 2962 BENT PINE DRIVE, Port St Lucie, FL Item Drawing Number Truss Item Drawing Number Truss 53 347.21.0847.53497 K2 54 347.21.0848.01677 K3 55 347.21.0848.02987 C1 56 347.21.0848.04237 C2 57 347.21.0848.05880 C2T 58 347.21.0848.07333 C3 59 347.21.0848.08460 C3T 60 347.21.0848.09680 C4 61 347.21.0848.10837 C5 62 347.21.0848.11973 C5T 63 347.21.0848.13013 C6 64 347.21.0848.14127 C6A 65 347.21.0848.15177 C6T 66 BRCLBSUB0119 67 VAL180160118 68 VALTN160118 Florida Certificate of Product Approval #FL1999 Printed 12/13/2021 9:06:00 AM 12/13/2021 COA #0 278 General Notes Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities: The design responsibilities assumed in the preparation of these design drawings are those spec ified in ANSI/TPI 1, Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to independently verify the accuracy or completeness of the information provided by others and may rely on that information without liability. The responsibility for verification of that information remains with others neither employed nor controlled by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component designs and not for the technical information furnished by others which technical information and consequences thereof remain their sole responsibility. The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and loads for each truss component match those required by the plans and by the actual use of the individual component, and for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any additional factors required in the particular application. Truss components using metal connector plates with integral teeth shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to exceed 19% and/or cause corrosion of connector plates and other metal fasteners. The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss component design loads, inspection of the truss components before or after installation, the design of temporary or permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports, installation of the truss components, observation of the truss component installation process, review of truss assembly procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in the installation of the truss components and/or its connections . This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request. Temporary Lateral Restraint and Bracing: Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2, B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to and may not be relied upon for the temporary stability of the truss components during their installation. Permanent Lateral Restraint and Bracing: The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional. These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building Designer. Connector Plate Information: Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations, gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60. Information on model code compliance is contained in the ICC Evaluation Service report ESR -1118, available on-line at www.icc-es.org. Fire Retardant Treated Lumber: Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special handling care must be taken to prevent breakage during all handling activities. Page 1 of 3 General Notes (continued) Key to Terms: Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be found in calculation sheets available upon written request. BCDL = Bottom Chord standard design Dead Load in pounds per square foot. BCLL = Bottom Chord standard design Live Load in pounds per square foot. CL = Certified lumber. Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot. FRT = Fire Retardant Treated lumber. FRT-DB = D-Blaze Fire Retardant Treated lumber. FRT-DC = Dricon Fire Retardant Treated lumber. FRT-FP = FirePRO Fire Retardant Treated lumber. FRT-FL = FlamePRO Fire Retardant Treated lumber. FRT-FT = FlameTech Fire Retardant Treated lumber. FRT-PG = PYRO-GUARD Fire Retardant Treated lumber. g = green lumber. HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches. HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep adjustment. HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds. Ic = Incised lumber. FJ = Finger Jointed lumber. L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value. L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the referenced panel point. Reported as 999 if greater than or equal to 999. Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection. Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases. Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases. Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases. NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot. PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds. PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds. PP = Panel Point. R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc). -R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc). Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the indicated location (Loc). RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non -gravity (wind or seismic) load cases, at the indicated location (Loc). Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the identified location (Loc). TCDL = Top Chord standard design Dead Load in pounds per square foot. TCLL = Top Chord standard design Live Load in pounds per square foot. U = maximum Upward design reaction, in pounds, from all specified non -gravity (wind or seismic) load cases, at the indicated location (Loc). VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in inches. VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment. VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load. VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment. W = Width of non-hanger bearing, in inches. Refer to ASCE-7 for Wind and Seismic abbreviations. Uppercase Acronyms not explained above are as defined in TPI 1. Page 2 of 3 References: 1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org. 2. ICC: International Code Council; www.iccsafe.org. 3. Alpine, a division of ITW Building Components Group Inc.: 514 Earth City Expressway, Suite 242, Earth City, MO 63045; www.alpineitw.com. 4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org. 5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www. sbcacomponents.com. Page 3 of 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E; Bot chord: 2x6 SP #2; B3 2x6 SP 2400f-2.0E; Webs: 2x4 SP #2; W3,W13 2x6 SP #2; W12 2x4 SP 2250f-1.9E; Nailnote Nail Schedule:0.128"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 2 Rows @ 3.50" o.c. (Each Row) Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at 0.00 to 92 plf at 18.45 BC: From 20 plf at 0.00 to 20 plf at 3.67 BC: From 10 plf at 3.67 to 10 plf at 17.99 BC: 1807 lb Conc. Load at 3.67, 5.67, 7.67, 9.67 BC: 1919 lb Conc. Load at 11.67,13.67,15.67,17.67 Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. End verticals not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. It is the responsibility of the Building Designer and Truss Fabricator to review this drawing prior to cutting lumber to verify that all data,including dimensions and loads, conform to the architectural plans/specifications and fabricators truss layout. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M 7860 /-/-/-/3126 /- H 8972 /-/-/-/3571 /- Wind reactions based on MWFRS M Brg Width = 3.5 Min Req =1.5 H Brg Width = 3.5 Min Req =1.7 Bearings M & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1324 -3318 C - D 1472 -3699 D - E 1593 -3991 Chords Tens.Comp. E - F 2564 -6431 F - G 2835 -7133 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. L - K 3024 -1202 K - J 5724 -2280 Chords Tens.Comp. J - I 7434 -2960 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - B 1412 -3494 B - L 3447 -1368 C - L 206 -462 C - K 1743 -696 K - D 1402 -542 K - E 1121 -2809 Webs Tens.Comp. E - J 2646 -1031 J - F 682 -1712 F - I 744 -1804 I - G 7792 -3096 G - H 1408 -3513 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.159 J 999 360 VERT(CL):0.290 J 696 240 HORZ(LL):0.052 C - - HORZ(TL):0.095 C - - Creep Factor: 2.0 Max TC CSI:0.884 Max BC CSI:0.884 Max Web CSI:0.778 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T1 Ply: 2 Qty:1 SEQN:196838 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T51 / DrwNo:347.21.0852.52539 SSB /FV 12/13/2021 2 Complete Trusses Required T4 B3 W3 W12 W13 1'5"12 16'10"10 1" 1'10"4 1'10"4 5'8"14 3'10"10 7'9"10 2'0"12 11'0"11 3'3"1 14'7"4 3'6"9 17'9"8 3'2"4 18'5"6 7"14 5'8"6 5'8"6 7'7"14 1'11"8 11'4"3 3'8"5 15'1"6 3'9"3 17'11"14 2'10"8 18'4"6 4"82'6"82'1"34'11"310'1" A B C D E F G HIJKLMN 5 12 3X3 1.5X4 7X10 7X6 4X10 5X8 8X10 5X5 5X8 7X6 H0610 SS0612 H0615 4X5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E; Bot chord: 2x6 SP #2; B3 2x6 SP 2400f-2.0E; Webs: 2x4 SP #2; W3,W13 2x6 SP #2; W12 2x4 SP 2250f-1.9E; Nailnote Nail Schedule:0.128"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 2 Rows @ 3.50" o.c. (Each Row) Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at 0.00 to 92 plf at 18.45 BC: From 20 plf at 0.00 to 20 plf at 3.67 BC: From 10 plf at 3.67 to 10 plf at 17.99 BC: 1807 lb Conc. Load at 3.67, 5.67, 7.67, 9.67 BC: 1919 lb Conc. Load at 11.67,13.67,15.67,17.67 Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. End verticals not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. It is the responsibility of the Building Designer and Truss Fabricator to review this drawing prior to cutting lumber to verify that all data,including dimensions and loads, conform to the architectural plans/specifications and fabricators truss layout. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M 7860 /-/-/-/3126 /- H 8972 /-/-/-/3571 /- Wind reactions based on MWFRS M Brg Width = 3.5 Min Req =1.5 H Brg Width = 3.5 Min Req =1.7 Bearings M & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1324 -3318 C - D 1472 -3699 D - E 1593 -3991 Chords Tens.Comp. E - F 2564 -6431 F - G 2835 -7133 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. L - K 3024 -1202 K - J 5724 -2280 Chords Tens.Comp. J - I 7434 -2960 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - B 1412 -3494 B - L 3447 -1368 C - L 206 -462 C - K 1743 -696 K - D 1402 -542 K - E 1121 -2809 Webs Tens.Comp. E - J 2646 -1031 J - F 682 -1712 F - I 744 -1804 I - G 7792 -3096 G - H 1408 -3513 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.159 J 999 360 VERT(CL):0.290 J 696 240 HORZ(LL):0.052 C - - HORZ(TL):0.095 C - - Creep Factor: 2.0 Max TC CSI:0.884 Max BC CSI:0.884 Max Web CSI:0.778 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T1 Ply: 2 Qty:1 SEQN:196838 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T51 / DrwNo:347.21.0852.52539 SSB /FV 12/13/2021 2 Complete Trusses Required T4 B3 W3 W12 W13 1'5"12 16'10"10 1" 1'10"4 1'10"4 5'8"14 3'10"10 7'9"10 2'0"12 11'0"11 3'3"1 14'7"4 3'6"9 17'9"8 3'2"4 18'5"6 7"14 5'8"6 5'8"6 7'7"14 1'11"8 11'4"3 3'8"5 15'1"6 3'9"3 17'11"14 2'10"8 18'4"6 4"82'6"82'1"34'11"310'1" A B C D E F G HIJKLMN 5 12 3X3 1.5X4 7X10 7X6 4X10 5X8 8X10 5X5 5X8 7X6 H0610 SS0612 H0615 4X5 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J 1357 /-/-/768 /526 /207 G 940 /-/-/534 /350 /- Wind reactions based on MWFRS J Brg Width = 3.5 Min Req =1.5 G Brg Width = 3.5 Min Req =1.5 Bearings J & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 288 -640 D - E 454 -965 Chords Tens.Comp. E - F 440 -1131 F - G 668 -1665 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. I - H 551 -93 Chords Tens.Comp. H - G 1461 -547 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. J - C 406 -984 C - I 861 -306 D - I 232 -579 Webs Tens.Comp. D - H 612 -214 H - F 359 -548 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.043 F 999 360 VERT(CL):0.082 F 999 240 HORZ(LL):0.014 D - - HORZ(TL):0.028 D - - Creep Factor: 2.0 Max TC CSI:0.472 Max BC CSI:0.766 Max Web CSI:0.268 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T2 Ply: 1 Qty:1 SEQN:196861 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T49 / DrwNo:347.21.0852.51788 SSB /FV 12/13/2021 1'5"12 16'10"10 1'9"4 1'9"4 4'6"14 2'9"10 8'11"10 4'4"12 13'6"15 4'7"5 18'4"14 4'9"15 1'4"4 1'4"4 4'5"6 3'1"2 8'8"6 4'3" 18'3"6 9'7"2'2"22'7"26"34'5"610'1" A B C D E F G HIJK 5 12 3X4 1.5X4 3X4 3X4 4X7 3X4 5X8 4X5 1.5X4 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J 1357 /-/-/768 /526 /207 G 940 /-/-/534 /350 /- Wind reactions based on MWFRS J Brg Width = 3.5 Min Req =1.5 G Brg Width = 3.5 Min Req =1.5 Bearings J & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 288 -640 D - E 454 -965 Chords Tens.Comp. E - F 440 -1131 F - G 668 -1665 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. I - H 551 -93 Chords Tens.Comp. H - G 1461 -547 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. J - C 406 -984 C - I 861 -306 D - I 232 -579 Webs Tens.Comp. D - H 612 -214 H - F 359 -548 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.043 F 999 360 VERT(CL):0.082 F 999 240 HORZ(LL):0.014 D - - HORZ(TL):0.028 D - - Creep Factor: 2.0 Max TC CSI:0.472 Max BC CSI:0.766 Max Web CSI:0.268 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T2 Ply: 1 Qty:1 SEQN:196861 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T49 / DrwNo:347.21.0852.51788 SSB /FV 12/13/2021 1'5"12 16'10"10 1'9"4 1'9"4 4'6"14 2'9"10 8'11"10 4'4"12 13'6"15 4'7"5 18'4"14 4'9"15 1'4"4 1'4"4 4'5"6 3'1"2 8'8"6 4'3" 18'3"6 9'7"2'2"22'7"26"34'5"610'1" A B C D E F G HIJK 5 12 3X4 1.5X4 3X4 3X4 4X7 3X4 5X8 4X5 1.5X4 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 1357 /-/-/759 /523 /201 G 940 /-/-/525 /350 /- Wind reactions based on MWFRS K Brg Wid = 3.5 Min Req =1.5 G Brg Wid = 3.5 Min Req =1.5 Bearings K & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 263 -594 D - E 275 -587 Chords Tens.Comp. E - F 409 -931 F - G 546 -1514 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. J - I 905 -215 I - H 1288 -399 Chords Tens.Comp. H - G 1281 -400 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - C 396 -988 C - J 842 -291 Webs Tens.Comp. J - E 376 -875 I - F 215 -478 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.029 H 999 360 VERT(CL):0.057 H 999 240 HORZ(LL):0.014 G - - HORZ(TL):0.028 G - - Creep Factor: 2.0 Max TC CSI:0.966 Max BC CSI:0.560 Max Web CSI:0.267 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T3 Ply: 1 Qty:1 SEQN:26597 SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T52 DrwNo:347.21.0852.52866 SSB /WHK 12/13/2021 1'5"12 16'10"10 1'9"4 1'9"4 4'3"4 2'6" 5'11"10 1'8"6 10'11"10 5' 18'4"14 7'5"4 1'4"4 1'4"4 4'1"12 2'9"8 6'1"10 1'11"14 10'8"6 4'6"12 18'3"6 7'7"2'2"22'7"26"3 3'7"64'3"1410'1" A B C D E F G HIJKL 5 12 3X4 1.5X4 3X4 3X4 4X4 3X8 5X5 3X4 5X5 6X8 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 1357 /-/-/759 /523 /201 G 940 /-/-/525 /350 /- Wind reactions based on MWFRS K Brg Wid = 3.5 Min Req =1.5 G Brg Wid = 3.5 Min Req =1.5 Bearings K & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 263 -594 D - E 275 -587 Chords Tens.Comp. E - F 409 -931 F - G 546 -1514 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. J - I 905 -215 I - H 1288 -399 Chords Tens.Comp. H - G 1281 -400 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - C 396 -988 C - J 842 -291 Webs Tens.Comp. J - E 376 -875 I - F 215 -478 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.029 H 999 360 VERT(CL):0.057 H 999 240 HORZ(LL):0.014 G - - HORZ(TL):0.028 G - - Creep Factor: 2.0 Max TC CSI:0.966 Max BC CSI:0.560 Max Web CSI:0.267 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T3 Ply: 1 Qty:1 SEQN:26597 SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T52 DrwNo:347.21.0852.52866 SSB /WHK 12/13/2021 1'5"12 16'10"10 1'9"4 1'9"4 4'3"4 2'6" 5'11"10 1'8"6 10'11"10 5' 18'4"14 7'5"4 1'4"4 1'4"4 4'1"12 2'9"8 6'1"10 1'11"14 10'8"6 4'6"12 18'3"6 7'7"2'2"22'7"26"3 3'7"64'3"1410'1" A B C D E F G HIJKL 5 12 3X4 1.5X4 3X4 3X4 4X4 3X8 5X5 3X4 5X5 6X8 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at -2.30 to 93 plf at 7.84 TC: From 46 plf at 7.84 to 46 plf at 12.84 TC: From 93 plf at 12.84 to 93 plf at 18.28 BC: From 4 plf at -2.30 to 4 plf at -0.13 BC: From 20 plf at 0.00 to 20 plf at 8.54 BC: From 10 plf at 8.54 to 10 plf at 12.81 BC: From 20 plf at 12.81 to 20 plf at 18.28 TC: 215 lb Conc. Load at 8.54 TC: 200 lb Conc. Load at 8.78,10.78 TC: 548 lb Conc. Load at 12.81 BC: 271 lb Conc. Load at 8.54 BC: 101 lb Conc. Load at 8.78,10.78 BC: 181 lb Conc. Load at 12.81 Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Left end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 2038 /-/-/-/826 /- G 1803 /-/-/-/693 /- Wind reactions based on MWFRS K Brg Wid = 3.5 Min Req =1.5 G Brg Wid = 4.0 Min Req =1.5 Bearings K & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 385 -1102 D - E 409 -1142 Chords Tens.Comp. E - F 1268 -3416 F - G 1408 -3620 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. J - I 3367 -1265 I - H 3247 -1240 Chords Tens.Comp. H - G 3233 -1248 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - C 671 -1646 C - J 1472 -584 D - J 559 -147 Webs Tens.Comp. J - E 1121 -2877 E - I 470 -30 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.106 H 999 360 VERT(CL):0.199 H 999 240 HORZ(LL):0.049 D - - HORZ(TL):0.093 D - - Creep Factor: 2.0 Max TC CSI:0.685 Max BC CSI:0.777 Max Web CSI:0.493 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T4 Ply: 1 Qty:1 SEQN:26594 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T36 DrwNo:347.21.0852.52914 SSB /WHK 12/13/2021 T3 T4 1'5"12 16'11"2 1'9"4 1'9"4 4'3"4 2'6" 7'11"10 3'8"6 12'11"10 5' 18'4"14 5'5"4 1'4"4 1'4"4 4'1"12 2'9"8 8'1"10 3'11"14 12'8"6 4'6"12 18'3"6 5'7"2'2"22'7"26"3 2'9"64'3"14(a) 10'1" A B C D E F G HIJKL 5 12 3X4 1.5X4 3X4 4X5 4X4 4X12 6X6 5X6 1.5X4 5X8 4X7(B2) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at -2.30 to 93 plf at 7.84 TC: From 46 plf at 7.84 to 46 plf at 12.84 TC: From 93 plf at 12.84 to 93 plf at 18.28 BC: From 4 plf at -2.30 to 4 plf at -0.13 BC: From 20 plf at 0.00 to 20 plf at 8.54 BC: From 10 plf at 8.54 to 10 plf at 12.81 BC: From 20 plf at 12.81 to 20 plf at 18.28 TC: 215 lb Conc. Load at 8.54 TC: 200 lb Conc. Load at 8.78,10.78 TC: 548 lb Conc. Load at 12.81 BC: 271 lb Conc. Load at 8.54 BC: 101 lb Conc. Load at 8.78,10.78 BC: 181 lb Conc. Load at 12.81 Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Left end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 2038 /-/-/-/826 /- G 1803 /-/-/-/693 /- Wind reactions based on MWFRS K Brg Wid = 3.5 Min Req =1.5 G Brg Wid = 4.0 Min Req =1.5 Bearings K & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 385 -1102 D - E 409 -1142 Chords Tens.Comp. E - F 1268 -3416 F - G 1408 -3620 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. J - I 3367 -1265 I - H 3247 -1240 Chords Tens.Comp. H - G 3233 -1248 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. K - C 671 -1646 C - J 1472 -584 D - J 559 -147 Webs Tens.Comp. J - E 1121 -2877 E - I 470 -30 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.106 H 999 360 VERT(CL):0.199 H 999 240 HORZ(LL):0.049 D - - HORZ(TL):0.093 D - - Creep Factor: 2.0 Max TC CSI:0.685 Max BC CSI:0.777 Max Web CSI:0.493 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T4 Ply: 1 Qty:1 SEQN:26594 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T36 DrwNo:347.21.0852.52914 SSB /WHK 12/13/2021 T3 T4 1'5"12 16'11"2 1'9"4 1'9"4 4'3"4 2'6" 7'11"10 3'8"6 12'11"10 5' 18'4"14 5'5"4 1'4"4 1'4"4 4'1"12 2'9"8 8'1"10 3'11"14 12'8"6 4'6"12 18'3"6 5'7"2'2"22'7"26"3 2'9"64'3"14(a) 10'1" A B C D E F G HIJKL 5 12 3X4 1.5X4 3X4 4X5 4X4 4X12 6X6 5X6 1.5X4 5X8 4X7(B2) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL I 860 /-/-/557 /315 /112 F 360 /-/-/184 /125 /- Wind reactions based on MWFRS I Brg Wid = 3.5 Min Req =1.5 F Brg Wid = 1.5 Bearing I is a rigid surface. Members not listed have forces less than 375# Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - I 244 -383 I - C 179 -498 Webs Tens.Comp. C - H 431 -121 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 D 999 360 VERT(CL):0.006 D 999 240 HORZ(LL):-0.001 B - - HORZ(TL):0.003 C - - Creep Factor: 2.0 Max TC CSI:0.472 Max BC CSI:0.150 Max Web CSI:0.097 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T5 Ply: 1 Qty:1 SEQN:26589 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T48 / DrwNo:347.21.0852.53038 SSB /DF 12/13/2021 1'5"12 1'9"4 1'9"4 4'3"4 2'6" 8'3" 3'11"12 8'7"4 4"4 1'4"4 1'4"4 4'1"12 2'9"8 8'3"4 4'1"8 8'5"12 2"8 2'2"22'7"23"84'3"1410'1" A B C D E F GHIJ 5 12 3X4 1.5X4 3X4 3X4 4X4 3X8 4X4 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL I 860 /-/-/557 /315 /112 F 360 /-/-/184 /125 /- Wind reactions based on MWFRS I Brg Wid = 3.5 Min Req =1.5 F Brg Wid = 1.5 Bearing I is a rigid surface. Members not listed have forces less than 375# Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - I 244 -383 I - C 179 -498 Webs Tens.Comp. C - H 431 -121 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 D 999 360 VERT(CL):0.006 D 999 240 HORZ(LL):-0.001 B - - HORZ(TL):0.003 C - - Creep Factor: 2.0 Max TC CSI:0.472 Max BC CSI:0.150 Max Web CSI:0.097 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T5 Ply: 1 Qty:1 SEQN:26589 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T48 / DrwNo:347.21.0852.53038 SSB /DF 12/13/2021 1'5"12 1'9"4 1'9"4 4'3"4 2'6" 8'3" 3'11"12 8'7"4 4"4 1'4"4 1'4"4 4'1"12 2'9"8 8'3"4 4'1"8 8'5"12 2"8 2'2"22'7"23"84'3"1410'1" A B C D E F GHIJ 5 12 3X4 1.5X4 3X4 3X4 4X4 3X8 4X4 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 563 /-/-/406 /204 /141 H 887 /-/-/644 /329 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 H Brg Wid = 7.6 Min Req =1.5 Bearings B & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. E - F 823 -427 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. I - H 448 -690 Chords Tens.Comp. H - F 465 -743 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - E 718 -299 Webs Tens.Comp. E - H 333 -784 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.011 F 999 360 VERT(CL):0.020 F 999 240 HORZ(LL):-0.004 F - - HORZ(TL):0.005 F - - Creep Factor: 2.0 Max TC CSI:0.501 Max BC CSI:0.168 Max Web CSI:0.162 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T6 Ply: 1 Qty:1 SEQN:26606 /COMN FROM: Cust: R 761 JRef:1Xbb7610005 T45 DrwNo:347.21.0852.53069 SSB /WHK 12/13/2021 6'11"10 1'8"6 2'1"15 2'1"15 4'4" 2'2"1 6'6"1 2'2"1 8'8" 2'1"15 2'0"3 2'0"3 4'4" 2'3"13 6'7"13 2'3"13 8'8" 2'0"32'1"6 2'1"6 6"32'3"142'11"812'1" A B C D E F G H IJ 5 12 3X4(B1)1.5X4 3X4 4X4 3X8 3X4 1.5X4 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 563 /-/-/406 /204 /141 H 887 /-/-/644 /329 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 H Brg Wid = 7.6 Min Req =1.5 Bearings B & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. E - F 823 -427 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. I - H 448 -690 Chords Tens.Comp. H - F 465 -743 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - E 718 -299 Webs Tens.Comp. E - H 333 -784 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.011 F 999 360 VERT(CL):0.020 F 999 240 HORZ(LL):-0.004 F - - HORZ(TL):0.005 F - - Creep Factor: 2.0 Max TC CSI:0.501 Max BC CSI:0.168 Max Web CSI:0.162 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T6 Ply: 1 Qty:1 SEQN:26606 /COMN FROM: Cust: R 761 JRef:1Xbb7610005 T45 DrwNo:347.21.0852.53069 SSB /WHK 12/13/2021 6'11"10 1'8"6 2'1"15 2'1"15 4'4" 2'2"1 6'6"1 2'2"1 8'8" 2'1"15 2'0"3 2'0"3 4'4" 2'3"13 6'7"13 2'3"13 8'8" 2'0"32'1"6 2'1"6 6"32'3"142'11"812'1" A B C D E F G H IJ 5 12 3X4(B1)1.5X4 3X4 4X4 3X8 3X4 1.5X4 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Loading #1 hip supports 3-5-4 jacks with no webs. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 801 /-/-/-/341 /- I 801 /-/-/-/341 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 I Brg Wid = 7.6 Min Req =1.5 Bearings B & E are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 292 -778 C - D 226 -656 Chords Tens.Comp. D - E 291 -779 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 636 -225 H - G 645 -224 Chords Tens.Comp. G - E 636 -224 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.023 G 999 360 VERT(CL):0.042 G 999 240 HORZ(LL):0.010 E - - HORZ(TL):0.019 E - - Creep Factor: 2.0 Max TC CSI:0.657 Max BC CSI:0.480 Max Web CSI:0.025 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T7 Ply: 1 Qty:1 SEQN:26585 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T32 / DrwNo:347.21.0852.52913 SSB /DF 12/13/2021 8'8" 3'5"4 3'5"4 5'2"12 1'9"8 8'8" 3'5"4 3'8"12 3'8"12 5'1" 1'4"4 8'8" 3'7"2'1"6 2'1"6 6"31'11"62'7"12'1" A B C D E FGHI 5 12 3X4(B1) 4X4 3X4 1.5X4 4X7 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Loading #1 hip supports 3-5-4 jacks with no webs. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 801 /-/-/-/341 /- I 801 /-/-/-/341 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 I Brg Wid = 7.6 Min Req =1.5 Bearings B & E are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 292 -778 C - D 226 -656 Chords Tens.Comp. D - E 291 -779 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 636 -225 H - G 645 -224 Chords Tens.Comp. G - E 636 -224 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.023 G 999 360 VERT(CL):0.042 G 999 240 HORZ(LL):0.010 E - - HORZ(TL):0.019 E - - Creep Factor: 2.0 Max TC CSI:0.657 Max BC CSI:0.480 Max Web CSI:0.025 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T7 Ply: 1 Qty:1 SEQN:26585 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T32 / DrwNo:347.21.0852.52913 SSB /DF 12/13/2021 8'8" 3'5"4 3'5"4 5'2"12 1'9"8 8'8" 3'5"4 3'8"12 3'8"12 5'1" 1'4"4 8'8" 3'7"2'1"6 2'1"6 6"31'11"62'7"12'1" A B C D E FGHI 5 12 3X4(B1) 4X4 3X4 1.5X4 4X7 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; W5,W13 2x6 SP #2; W6, W12 2x4 SP 2250f-1.9E; Nailnote Nail Schedule:0.128"x3", min. nails Top Chord: 1 Row @ 9.00" o.c. Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 92 plf at -2.11 to 92 plf at 6.77 TC: From 46 plf at 6.77 to 46 plf at 43.90 TC: From 93 plf at 43.90 to 93 plf at 52.78 BC: From 4 plf at -2.11 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 6.80 BC: From 10 plf at 6.80 to 10 plf at 43.86 BC: From 20 plf at 43.86 to 20 plf at 50.67 BC: From 4 plf at 50.67 to 4 plf at 52.78 TC: 650 lb Conc. Load at 6.80,43.86 TC: 264 lb Conc. Load at 7.83, 9.83,11.83,13.83 15.83,17.83,19.83,21.83,23.83,25.83,27.83,29.83 31.83,33.83,35.83,37.83,39.83,41.83 BC: 499 lb Conc. Load at 6.80,43.86 BC: 127 lb Conc. Load at 7.83, 9.83,11.83,13.83 15.83,17.83,19.83,21.83,23.83,25.83,27.83,29.83 31.83,33.83,35.83,37.83,39.83,41.83 Plating Notes All plates are 7X8 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. WARNING!This truss is not symmetric, but its exterior geometry makes erection error more probable. It is imperative that this truss be installed properly. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 3954 /-/-/-/1642 /- P 9272 /-/-/-/3884 /- W 317 /-382 /-/-/39 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 P Brg Width = 3.5 Min Req =1.8 W Brg Width = 7.6 Min Req =1.5 Bearings B, P, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1649 -3993 C - D 1910 -4620 D - E 2094 -5021 E - F 1685 -4073 F - G 934 -2263 Chords Tens.Comp. G - H 934 -2263 H - I 678 -295 I - J 4709 -1974 J - K 2190 -891 K - L 748 -279 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 3599 -1480 V - U 3610 -1478 U - T 4687 -1947 T - S 5010 -2095 S - R 4010 -1667 Chords Tens.Comp. R - Q 200 -474 Q - P 1872 -4482 P - O 939 -2323 O - N 224 -646 N - L 225 -663 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 1250 -536 U - D 377 -673 D - T 414 -182 E - S 488 -1118 S - F 666 -181 F - R 868 -2072 G - R 274 -428 Webs Tens.Comp. R - H 3198 -1341 H - Q 995 -2140 Q - I 4534 -1880 I - P 1313 -2939 P - J 1269 -3059 J - O 1419 -499 O - K 826 -2007 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.367 E 999 360 VERT(CL):0.677 E 625 240 HORZ(LL):0.078 C - - HORZ(TL):0.144 C - - Creep Factor: 2.0 Max TC CSI:0.904 Max BC CSI:0.939 Max Web CSI:0.774 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T8 Ply: 2 Qty:1 SEQN:196705 /HIPS FROM: Page 1 of 2 Cust: R 761 JRef:1Xbb7610005 T9 DrwNo:347.21.0852.51773 SSB /WHK 12/13/2021 2 Complete Trusses Required T3 W5 W6 W12 W13 35'4"4 15'3"12 6'9"4 6'9"4 11'2"10 4'5"6 15'6"8 4'3"14 20'6"2 4'11"10 25'4" 4'9"14 30'1"14 4'9"14 35'1"8 4'11"10 39'5"6 4'3"14 43'10"12 4'5"6 50'8" 6'9"4 6'11" 6'11" 10'11"2 4'0"2 20'2"2 9'3" 25'4" 5'1"14 30'5"14 5'1"14 39'8"14 9'3" 43'9" 4'0"2 50'8" 6'11"2'1"6 2'1"6 6"33'4"13'11"118'1"A B C D E F G H I J K L M NOPQRSTUV W 5 12 4X7(B2)1.5X4 4X5 4X7 H0615 6X8 6X8 1.5X4 7X10 6X8 6X8 H0615 4X7 4X5 1.5X4 4X7(B2) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; W5,W13 2x6 SP #2; W6, W12 2x4 SP 2250f-1.9E; Nailnote Nail Schedule:0.128"x3", min. nails Top Chord: 1 Row @ 9.00" o.c. Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 92 plf at -2.11 to 92 plf at 6.77 TC: From 46 plf at 6.77 to 46 plf at 43.90 TC: From 93 plf at 43.90 to 93 plf at 52.78 BC: From 4 plf at -2.11 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 6.80 BC: From 10 plf at 6.80 to 10 plf at 43.86 BC: From 20 plf at 43.86 to 20 plf at 50.67 BC: From 4 plf at 50.67 to 4 plf at 52.78 TC: 650 lb Conc. Load at 6.80,43.86 TC: 264 lb Conc. Load at 7.83, 9.83,11.83,13.83 15.83,17.83,19.83,21.83,23.83,25.83,27.83,29.83 31.83,33.83,35.83,37.83,39.83,41.83 BC: 499 lb Conc. Load at 6.80,43.86 BC: 127 lb Conc. Load at 7.83, 9.83,11.83,13.83 15.83,17.83,19.83,21.83,23.83,25.83,27.83,29.83 31.83,33.83,35.83,37.83,39.83,41.83 Plating Notes All plates are 7X8 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. WARNING!This truss is not symmetric, but its exterior geometry makes erection error more probable. It is imperative that this truss be installed properly. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 3954 /-/-/-/1642 /- P 9272 /-/-/-/3884 /- W 317 /-382 /-/-/39 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 P Brg Width = 3.5 Min Req =1.8 W Brg Width = 7.6 Min Req =1.5 Bearings B, P, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1649 -3993 C - D 1910 -4620 D - E 2094 -5021 E - F 1685 -4073 F - G 934 -2263 Chords Tens.Comp. G - H 934 -2263 H - I 678 -295 I - J 4709 -1974 J - K 2190 -891 K - L 748 -279 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 3599 -1480 V - U 3610 -1478 U - T 4687 -1947 T - S 5010 -2095 S - R 4010 -1667 Chords Tens.Comp. R - Q 200 -474 Q - P 1872 -4482 P - O 939 -2323 O - N 224 -646 N - L 225 -663 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 1250 -536 U - D 377 -673 D - T 414 -182 E - S 488 -1118 S - F 666 -181 F - R 868 -2072 G - R 274 -428 Webs Tens.Comp. R - H 3198 -1341 H - Q 995 -2140 Q - I 4534 -1880 I - P 1313 -2939 P - J 1269 -3059 J - O 1419 -499 O - K 826 -2007 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.367 E 999 360 VERT(CL):0.677 E 625 240 HORZ(LL):0.078 C - - HORZ(TL):0.144 C - - Creep Factor: 2.0 Max TC CSI:0.904 Max BC CSI:0.939 Max Web CSI:0.774 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T8 Ply: 2 Qty:1 SEQN:196705 /HIPS FROM: Page 1 of 2 Cust: R 761 JRef:1Xbb7610005 T9 DrwNo:347.21.0852.51773 SSB /WHK 12/13/2021 2 Complete Trusses Required T3 W5 W6 W12 W13 35'4"4 15'3"12 6'9"4 6'9"4 11'2"10 4'5"6 15'6"8 4'3"14 20'6"2 4'11"10 25'4" 4'9"14 30'1"14 4'9"14 35'1"8 4'11"10 39'5"6 4'3"14 43'10"12 4'5"6 50'8" 6'9"4 6'11" 6'11" 10'11"2 4'0"2 20'2"2 9'3" 25'4" 5'1"14 30'5"14 5'1"14 39'8"14 9'3" 43'9" 4'0"2 50'8" 6'11"2'1"6 2'1"6 6"33'4"13'11"118'1"A B C D E F G H I J K L M NOPQRSTUV W 5 12 4X7(B2)1.5X4 4X5 4X7 H0615 6X8 6X8 1.5X4 7X10 6X8 6X8 H0615 4X7 4X5 1.5X4 4X7(B2) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Additional Notes Negative reaction(s) of -382# MAX. from a non-wind load case requires uplift connection. See Maximum Reactions. WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T8 Ply: 2 Qty:1 SEQN:196705 /HIPS FROM: Page 2 of 2 Cust: R 761 JRef:1Xbb7610005 T9 DrwNo:347.21.0852.51773 SSB /WHK 12/13/2021 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Additional Notes Negative reaction(s) of -382# MAX. from a non-wind load case requires uplift connection. See Maximum Reactions. WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T8 Ply: 2 Qty:1 SEQN:196705 /HIPS FROM: Page 2 of 2 Cust: R 761 JRef:1Xbb7610005 T9 DrwNo:347.21.0852.51773 SSB /WHK 12/13/2021 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; B1,B7 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1917 /-/-/1142 /746 /241 O 3840 /-/-/1754 /1530 /- U 704 /-172 /-/448 /206 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 O Brg Width = 3.5 Min Req =1.5 U Brg Width = 7.6 Min Req =1.5 Bearings B, O, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1308 -3301 C - D 1186 -3016 D - E 1441 -3465 E - F 1214 -2954 F - G 767 -1853 Chords Tens.Comp. G - H 767 -1853 I - J 2808 -1017 J - K 1166 -310 K - L 927 -564 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2920 -1076 T - S 2742 -893 S - R 3473 -1184 R - Q 2922 -943 Chords Tens.Comp. P - O 1235 -2706 O - N 498 -1063 N - L 445 -812 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - S 835 -404 E - R 299 -703 R - F 452 -110 F - Q 561 -1402 Q - H 2315 -921 G - Q 265 -468 Webs Tens.Comp. H - P 797 -1858 P - I 3207 -1241 I - O 1165 -2688 O - J 900 -2345 J - N 471 -100 N - K 371 -573 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.245 E 999 360 VERT(CL):0.468 E 904 240 HORZ(LL):0.065 Q - - HORZ(TL):0.124 P - - Creep Factor: 2.0 Max TC CSI:0.871 Max BC CSI:0.809 Max Web CSI:0.950 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T9 Ply: 1 Qty:1 SEQN:196806 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T2 DrwNo:347.21.0852.52413 SSB /WHK 12/13/2021 B1 B7 35'4"4 15'3"12 4'5"15 4'5"15 8'9"4 4'3"5 15'6" 6'8"12 20'5"10 4'11"10 25'4" 4'10"6 30'2"6 4'10"6 35'2" 4'11"10 41'10"12 6'8"12 46'2"1 4'3"5 50'8" 4'5"15 8'9"4 8'9"4 20'2"2 11'4"14 25'4" 5'1"14 30'5"14 5'1"14 41'10"12 11'4"14 50'8" 8'9"42'1"6 2'1"6 6"34'2"14'9"11(a) 8'1"A B C D E F G H I J K L M NOPQRST U 5 12 4X6(B2) 1.5X4 5X8 5X6 H0514 5X8 6X8 4X7 5X8 4X12 4X7 6X8 5X8 H0514 5X8 5X6 1.5X4 4X6(B2) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; B1,B7 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1917 /-/-/1142 /746 /241 O 3840 /-/-/1754 /1530 /- U 704 /-172 /-/448 /206 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 O Brg Width = 3.5 Min Req =1.5 U Brg Width = 7.6 Min Req =1.5 Bearings B, O, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1308 -3301 C - D 1186 -3016 D - E 1441 -3465 E - F 1214 -2954 F - G 767 -1853 Chords Tens.Comp. G - H 767 -1853 I - J 2808 -1017 J - K 1166 -310 K - L 927 -564 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2920 -1076 T - S 2742 -893 S - R 3473 -1184 R - Q 2922 -943 Chords Tens.Comp. P - O 1235 -2706 O - N 498 -1063 N - L 445 -812 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - S 835 -404 E - R 299 -703 R - F 452 -110 F - Q 561 -1402 Q - H 2315 -921 G - Q 265 -468 Webs Tens.Comp. H - P 797 -1858 P - I 3207 -1241 I - O 1165 -2688 O - J 900 -2345 J - N 471 -100 N - K 371 -573 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.245 E 999 360 VERT(CL):0.468 E 904 240 HORZ(LL):0.065 Q - - HORZ(TL):0.124 P - - Creep Factor: 2.0 Max TC CSI:0.871 Max BC CSI:0.809 Max Web CSI:0.950 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T9 Ply: 1 Qty:1 SEQN:196806 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T2 DrwNo:347.21.0852.52413 SSB /WHK 12/13/2021 B1 B7 35'4"4 15'3"12 4'5"15 4'5"15 8'9"4 4'3"5 15'6" 6'8"12 20'5"10 4'11"10 25'4" 4'10"6 30'2"6 4'10"6 35'2" 4'11"10 41'10"12 6'8"12 46'2"1 4'3"5 50'8" 4'5"15 8'9"4 8'9"4 20'2"2 11'4"14 25'4" 5'1"14 30'5"14 5'1"14 41'10"12 11'4"14 50'8" 8'9"42'1"6 2'1"6 6"34'2"14'9"11(a) 8'1"A B C D E F G H I J K L M NOPQRST U 5 12 4X6(B2) 1.5X4 5X8 5X6 H0514 5X8 6X8 4X7 5X8 4X12 4X7 6X8 5X8 H0514 5X8 5X6 1.5X4 4X6(B2) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; B2,B3 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 5X8 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Negative reaction(s) of -201# MAX. from a non-wind load case requires uplift connection. See Maximum Reactions. WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. WARNING!This truss is not symmetric, but its exterior geometry makes erection error more probable. It is imperative that this truss be installed properly. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1904 /-/-/1159 /747 /279 P 3894 /-/-/1799 /1523 /- W 667 /-201 /-/441 /237 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 P Brg Width = 3.5 Min Req =1.5 W Brg Width = 7.6 Min Req =1.5 Bearings B, P, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1254 -3254 C - D 1136 -2776 D - E 1214 -2768 E - F 1054 -2385 F - G 686 -1460 Chords Tens.Comp. G - H 686 -1460 I - J 2455 -791 J - K 1415 -381 K - L 973 -465 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2883 -1025 V - U 2883 -1028 U - T 2485 -793 T - S 2772 -904 S - R 2360 -735 Chords Tens.Comp. Q - P 1070 -2375 P - O 606 -1288 O - N 337 -860 N - L 341 -855 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 263 -453 D - T 403 -251 E - S 230 -579 S - F 440 -91 F - R 505 -1291 G - R 257 -454 R - H 2085 -816 Webs Tens.Comp. H - Q 818 -1886 Q - I 2921 -1137 I - P 1100 -2595 P - J 707 -1872 J - O 511 -163 O - K 433 -859 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.190 E 999 360 VERT(CL):0.363 E 999 240 HORZ(LL):0.053 R - - HORZ(TL):0.101 R - - Creep Factor: 2.0 Max TC CSI:0.578 Max BC CSI:0.665 Max Web CSI:0.905 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T10 Ply: 1 Qty:1 SEQN:196812 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T3 / DrwNo:347.21.0852.51741 SSB /FV 12/13/2021 T3 B2 B3 35'4"4 15'3"12 5'7"11 5'7"11 10'9"4 5'1"9 15'6" 4'8"12 20'5"10 4'11"10 25'4" 4'10"6 30'2"6 4'10"6 35'2" 4'11"10 39'10"12 4'8"12 45'0"5 5'1"9 50'8" 5'7"11 5'5"15 5'5"15 10'9"4 5'3"5 20'1"10 9'4"6 25'4" 5'2"6 30'6"6 5'2"6 39'10"12 9'4"6 45'2"1 5'3"5 50'8" 5'5"152'1"6 2'1"6 6"35'0"15'7"11(a)(a)(a) 8'1"A B C D E F G H I J K L M NOPQRSTUV W 5 12 4X6(B2)1.5X4 3X4 3X4 6X8 6X8 1.5X4 6X10 6X8 6X8 3X4 3X4 1.5X4 4X6(B2) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; B2,B3 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 5X8 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Negative reaction(s) of -201# MAX. from a non-wind load case requires uplift connection. See Maximum Reactions. WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. WARNING!This truss is not symmetric, but its exterior geometry makes erection error more probable. It is imperative that this truss be installed properly. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1904 /-/-/1159 /747 /279 P 3894 /-/-/1799 /1523 /- W 667 /-201 /-/441 /237 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 P Brg Width = 3.5 Min Req =1.5 W Brg Width = 7.6 Min Req =1.5 Bearings B, P, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1254 -3254 C - D 1136 -2776 D - E 1214 -2768 E - F 1054 -2385 F - G 686 -1460 Chords Tens.Comp. G - H 686 -1460 I - J 2455 -791 J - K 1415 -381 K - L 973 -465 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2883 -1025 V - U 2883 -1028 U - T 2485 -793 T - S 2772 -904 S - R 2360 -735 Chords Tens.Comp. Q - P 1070 -2375 P - O 606 -1288 O - N 337 -860 N - L 341 -855 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 263 -453 D - T 403 -251 E - S 230 -579 S - F 440 -91 F - R 505 -1291 G - R 257 -454 R - H 2085 -816 Webs Tens.Comp. H - Q 818 -1886 Q - I 2921 -1137 I - P 1100 -2595 P - J 707 -1872 J - O 511 -163 O - K 433 -859 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.190 E 999 360 VERT(CL):0.363 E 999 240 HORZ(LL):0.053 R - - HORZ(TL):0.101 R - - Creep Factor: 2.0 Max TC CSI:0.578 Max BC CSI:0.665 Max Web CSI:0.905 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T10 Ply: 1 Qty:1 SEQN:196812 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T3 / DrwNo:347.21.0852.51741 SSB /FV 12/13/2021 T3 B2 B3 35'4"4 15'3"12 5'7"11 5'7"11 10'9"4 5'1"9 15'6" 4'8"12 20'5"10 4'11"10 25'4" 4'10"6 30'2"6 4'10"6 35'2" 4'11"10 39'10"12 4'8"12 45'0"5 5'1"9 50'8" 5'7"11 5'5"15 5'5"15 10'9"4 5'3"5 20'1"10 9'4"6 25'4" 5'2"6 30'6"6 5'2"6 39'10"12 9'4"6 45'2"1 5'3"5 50'8" 5'5"152'1"6 2'1"6 6"35'0"15'7"11(a)(a)(a) 8'1"A B C D E F G H I J K L M NOPQRSTUV W 5 12 4X6(B2)1.5X4 3X4 3X4 6X8 6X8 1.5X4 6X10 6X8 6X8 3X4 3X4 1.5X4 4X6(B2) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T1,T5 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP 2250f-1.9E; B2,B3 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 5X8 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. WARNING!This truss is not symmetric, but its exterior geometry makes erection error more probable. It is imperative that this truss be installed properly. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1917 /-/-/1188 /751 /316 P 3862 /-/-/1799 /1505 /- W 672 /-172 /-/465 /257 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 P Brg Width = 3.5 Min Req =1.5 W Brg Width = 7.6 Min Req =1.5 Bearings B, P, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1264 -3288 C - D 1069 -2580 D - E 1082 -2370 E - F 961 -2075 F - G 651 -1297 Chords Tens.Comp. G - H 651 -1297 I - J 2028 -596 J - K 1542 -446 K - L 972 -420 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2910 -1025 V - U 2909 -1028 U - T 2280 -688 T - S 2370 -720 S - R 2054 -593 Chords Tens.Comp. Q - P 933 -1963 P - O 706 -1354 O - N 347 -853 N - L 348 -848 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 379 -707 E - S 189 -491 S - F 417 -77 F - R 464 -1190 G - R 251 -443 R - H 1910 -744 Webs Tens.Comp. H - Q 823 -1897 Q - I 2710 -1056 I - P 1043 -2492 P - J 599 -1600 J - O 613 -219 O - K 526 -1055 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.175 T 999 360 VERT(CL):0.335 T 999 240 HORZ(LL):0.050 R - - HORZ(TL):0.097 Q - - Creep Factor: 2.0 Max TC CSI:0.776 Max BC CSI:0.582 Max Web CSI:0.999 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T11 Ply: 1 Qty:1 SEQN:196818 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T4 / DrwNo:347.21.0852.52381 SSB /FV 12/13/2021 T1 T5 B2 B3 35'4"4 15'3"12 6'7"11 6'7"11 12'9"4 6'1"9 15'6" 2'8"12 20'5"10 4'11"10 25'4" 4'10"6 30'2"6 4'10"6 35'2" 4'11"10 37'10"12 2'8"12 44'0"5 6'1"9 50'8" 6'7"11 6'5"15 6'5"15 12'9"4 6'3"5 20'1"10 7'4"6 25'4" 5'2"6 30'6"6 5'2"6 37'10"12 7'4"6 44'2"1 6'3"5 50'8" 6'5"152'1"6 2'1"6 6"35'10"16'5"11(a)(a) (a) 8'1"A B C D E F G H I J K L M NOPQRSTUV W 5 12 4X6(B2)1.5X4 3X4 3X4 6X8 6X8 1.5X4 6X10 6X8 6X8 3X4 3X4 1.5X4 4X6(B2) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T1,T5 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP 2250f-1.9E; B2,B3 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 5X8 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. WARNING!This truss is not symmetric, but its exterior geometry makes erection error more probable. It is imperative that this truss be installed properly. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1917 /-/-/1188 /751 /316 P 3862 /-/-/1799 /1505 /- W 672 /-172 /-/465 /257 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 P Brg Width = 3.5 Min Req =1.5 W Brg Width = 7.6 Min Req =1.5 Bearings B, P, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1264 -3288 C - D 1069 -2580 D - E 1082 -2370 E - F 961 -2075 F - G 651 -1297 Chords Tens.Comp. G - H 651 -1297 I - J 2028 -596 J - K 1542 -446 K - L 972 -420 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2910 -1025 V - U 2909 -1028 U - T 2280 -688 T - S 2370 -720 S - R 2054 -593 Chords Tens.Comp. Q - P 933 -1963 P - O 706 -1354 O - N 347 -853 N - L 348 -848 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 379 -707 E - S 189 -491 S - F 417 -77 F - R 464 -1190 G - R 251 -443 R - H 1910 -744 Webs Tens.Comp. H - Q 823 -1897 Q - I 2710 -1056 I - P 1043 -2492 P - J 599 -1600 J - O 613 -219 O - K 526 -1055 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.175 T 999 360 VERT(CL):0.335 T 999 240 HORZ(LL):0.050 R - - HORZ(TL):0.097 Q - - Creep Factor: 2.0 Max TC CSI:0.776 Max BC CSI:0.582 Max Web CSI:0.999 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T11 Ply: 1 Qty:1 SEQN:196818 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T4 / DrwNo:347.21.0852.52381 SSB /FV 12/13/2021 T1 T5 B2 B3 35'4"4 15'3"12 6'7"11 6'7"11 12'9"4 6'1"9 15'6" 2'8"12 20'5"10 4'11"10 25'4" 4'10"6 30'2"6 4'10"6 35'2" 4'11"10 37'10"12 2'8"12 44'0"5 6'1"9 50'8" 6'7"11 6'5"15 6'5"15 12'9"4 6'3"5 20'1"10 7'4"6 25'4" 5'2"6 30'6"6 5'2"6 37'10"12 7'4"6 44'2"1 6'3"5 50'8" 6'5"152'1"6 2'1"6 6"35'10"16'5"11(a)(a) (a) 8'1"A B C D E F G H I J K L M NOPQRSTUV W 5 12 4X6(B2)1.5X4 3X4 3X4 6X8 6X8 1.5X4 6X10 6X8 6X8 3X4 3X4 1.5X4 4X6(B2) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T5 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. (**) 1 plate(s) require special positioning. Refer to scaled plate plot details for special positioning requirements. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. WARNING!This truss is not symmetric, but its exterior geometry makes erection error more probable. It is imperative that this truss be installed properly. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 530 /-/-/269 /186 /353 Y 2402 /-/-/1449 /870 /- S 2731 /-/-/1449 /1044 /- AA 801 /-/-/592 /301 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 Y Brg Width = 3.5 Min Req =2.5 S Brg Width = 3.5 Min Req =2.8 AA Brg Width = 7.6 Min Req =1.5 Bearings B, Y, S, & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 488 -163 C - D 1063 -270 D - E 231 -498 E - F 253 -389 F - G 606 -1287 G - H 405 -903 Chords Tens.Comp. H - I 405 -903 I - J 1184 -305 J - K 1286 -347 K - L 1353 -425 L - M 218 -653 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Z 270 -417 Z - Y 269 -421 W -U 537 -138 U - T 1313 -217 Chords Tens.Comp. T - S 661 -1055 S - P 766 -1279 O - M 491 -105 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - Y 338 -697 Y - D 541 -1534 Y - W 463 -980 D - W 1322 -307 W -F 402 -939 F - U 986 -322 U - G 236 -395 Webs Tens.Comp. G - T 268 -680 H - T 356 -627 T - I 2035 -776 I - S 854 -1878 P - O 500 -109 P - L 770 -1469 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.061 G 999 360 VERT(CL):0.123 G 999 240 HORZ(LL):0.019 F - - HORZ(TL):0.037 F - - Creep Factor: 2.0 Max TC CSI:0.948 Max BC CSI:0.563 Max Web CSI:0.887 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T12 Ply: 1 Qty:1 SEQN:196799 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T6 / DrwNo:347.21.0852.51678 SSB /FV 12/13/2021 T5 9'10"10 25'5"10 15'3"12 5'3"9 5'3"9 9'11"10 4'8"1 14'9"4 4'9"10 21'8"3 6'10"15 28'5"5 6'9"3 35'10"12 7'5"7 43'0"12 7'2" 50'8" 7'7"4 5'1"2 5'1"2 9'9"14 4'8"12 14'5"8 4'7"10 21'4"11 6'11"3 28'5"5 7'0"11 36' 7'6"11 43'0"15 7'0"15 50'8" 7'7"12'1"6 2'1"6 6"32'6'8"17'3"11(a) 8'1" 10'1" A B C D E F G H I J K L M N O P QR STU V W XYZ AA 5 12 3X5(B1) 5X6 3X8 3X6 6X8 5X6 5X8 3X4 5X8 4X10 3X8 3X5 5X6 5X8 1.5X4(**) 3X4 8X8 3X5(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T5 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. (**) 1 plate(s) require special positioning. Refer to scaled plate plot details for special positioning requirements. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. WARNING!This truss is not symmetric, but its exterior geometry makes erection error more probable. It is imperative that this truss be installed properly. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 530 /-/-/269 /186 /353 Y 2402 /-/-/1449 /870 /- S 2731 /-/-/1449 /1044 /- AA 801 /-/-/592 /301 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 Y Brg Width = 3.5 Min Req =2.5 S Brg Width = 3.5 Min Req =2.8 AA Brg Width = 7.6 Min Req =1.5 Bearings B, Y, S, & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 488 -163 C - D 1063 -270 D - E 231 -498 E - F 253 -389 F - G 606 -1287 G - H 405 -903 Chords Tens.Comp. H - I 405 -903 I - J 1184 -305 J - K 1286 -347 K - L 1353 -425 L - M 218 -653 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Z 270 -417 Z - Y 269 -421 W -U 537 -138 U - T 1313 -217 Chords Tens.Comp. T - S 661 -1055 S - P 766 -1279 O - M 491 -105 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - Y 338 -697 Y - D 541 -1534 Y - W 463 -980 D - W 1322 -307 W -F 402 -939 F - U 986 -322 U - G 236 -395 Webs Tens.Comp. G - T 268 -680 H - T 356 -627 T - I 2035 -776 I - S 854 -1878 P - O 500 -109 P - L 770 -1469 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.061 G 999 360 VERT(CL):0.123 G 999 240 HORZ(LL):0.019 F - - HORZ(TL):0.037 F - - Creep Factor: 2.0 Max TC CSI:0.948 Max BC CSI:0.563 Max Web CSI:0.887 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T12 Ply: 1 Qty:1 SEQN:196799 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T6 / DrwNo:347.21.0852.51678 SSB /FV 12/13/2021 T5 9'10"10 25'5"10 15'3"12 5'3"9 5'3"9 9'11"10 4'8"1 14'9"4 4'9"10 21'8"3 6'10"15 28'5"5 6'9"3 35'10"12 7'5"7 43'0"12 7'2" 50'8" 7'7"4 5'1"2 5'1"2 9'9"14 4'8"12 14'5"8 4'7"10 21'4"11 6'11"3 28'5"5 7'0"11 36' 7'6"11 43'0"15 7'0"15 50'8" 7'7"12'1"6 2'1"6 6"32'6'8"17'3"11(a) 8'1" 10'1" A B C D E F G H I J K L M N O P QR STU V W XYZ AA 5 12 3X5(B1) 5X6 3X8 3X6 6X8 5X6 5X8 3X4 5X8 4X10 3X8 3X5 5X6 5X8 1.5X4(**) 3X4 8X8 3X5(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 543 /-/-/272 /198 /391 AA 2407 /-/-/1497 /894 /- S 2510 /-/-/1364 /939 /- AC 902 /-/-/669 /369 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 AA Brg Width = 3.5 Min Req =2.5 S Brg Width = 3.5 Min Req =2.6 AC Brg Width = 7.6 Min Req =1.5 Bearings B, AA, S, & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 418 -199 C - D 961 -292 D - E 305 -674 E - F 498 -963 F - G 655 -1257 Chords Tens.Comp. G - H 545 -1014 H - I 545 -1014 J - K 616 -12 K - L 747 -129 L - M 350 -875 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. Y - W 568 -197 W -V 853 -191 V - U 1274 -208 Chords Tens.Comp. T - S 469 -613 S - P 463 -642 O - M 690 -178 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C -AA 332 -682 AA- D 583 -1594 AA- Y 428 -878 D - Y 1377 -347 Y - E 381 -964 E - W 650 -179 F - W 184 -481 F - V 606 -219 G - U 166 -464 Webs Tens.Comp. H - U 303 -536 U - I 1456 -551 I - T 538 -1431 T - J 1517 -496 J - S 337 -1385 S - K 407 -871 P - O 711 -188 P - L 618 -1179 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.055 G 999 360 VERT(CL):0.107 G 999 240 HORZ(LL):0.018 F - - HORZ(TL):0.036 F - - Creep Factor: 2.0 Max TC CSI:0.903 Max BC CSI:0.521 Max Web CSI:0.681 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T13 Ply: 1 Qty:1 SEQN:196795 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T21 / DrwNo:347.21.0852.51413 SSB /FV 12/13/2021 9'10"10 25'5"10 15'3"12 5'2"8 5'2"8 9'11"10 4'9"2 14'2" 4'2"6 16'9"4 2'7"4 22'8"1 5'10"13 28'1"11 5'5"9 33'10"12 5'9"1 35'2"8 1'3"12 36' 9"8 43'1"2 7'1"2 50'8" 7'6"14 5'1"2 5'1"2 9'9"14 4'8"12 14'5"8 4'7"10 16'9"4 2'3"12 22'4"9 5'7"5 28'1"11 5'9"1 33'11"4 5'9"9 36' 2'0"12 43'0"15 7'0"15 50'8" 7'7"12'1"6 2'1"6 6"32'7'6"18'1"11(a) 8'1" 10'1" A B C D E F G H I J K L M N O P QR STUVW X Y ZAAAB AC 5 12 3X5(B1)1.5X4 5X6 3X8 3X6 6X81.5X4 5X8 5X8 1.5X4 4X8 5X8 3X8 4X5 5X81.5X4 6X6 3X5(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 543 /-/-/272 /198 /391 AA 2407 /-/-/1497 /894 /- S 2510 /-/-/1364 /939 /- AC 902 /-/-/669 /369 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 AA Brg Width = 3.5 Min Req =2.5 S Brg Width = 3.5 Min Req =2.6 AC Brg Width = 7.6 Min Req =1.5 Bearings B, AA, S, & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 418 -199 C - D 961 -292 D - E 305 -674 E - F 498 -963 F - G 655 -1257 Chords Tens.Comp. G - H 545 -1014 H - I 545 -1014 J - K 616 -12 K - L 747 -129 L - M 350 -875 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. Y - W 568 -197 W -V 853 -191 V - U 1274 -208 Chords Tens.Comp. T - S 469 -613 S - P 463 -642 O - M 690 -178 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C -AA 332 -682 AA- D 583 -1594 AA- Y 428 -878 D - Y 1377 -347 Y - E 381 -964 E - W 650 -179 F - W 184 -481 F - V 606 -219 G - U 166 -464 Webs Tens.Comp. H - U 303 -536 U - I 1456 -551 I - T 538 -1431 T - J 1517 -496 J - S 337 -1385 S - K 407 -871 P - O 711 -188 P - L 618 -1179 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.055 G 999 360 VERT(CL):0.107 G 999 240 HORZ(LL):0.018 F - - HORZ(TL):0.036 F - - Creep Factor: 2.0 Max TC CSI:0.903 Max BC CSI:0.521 Max Web CSI:0.681 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T13 Ply: 1 Qty:1 SEQN:196795 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T21 / DrwNo:347.21.0852.51413 SSB /FV 12/13/2021 9'10"10 25'5"10 15'3"12 5'2"8 5'2"8 9'11"10 4'9"2 14'2" 4'2"6 16'9"4 2'7"4 22'8"1 5'10"13 28'1"11 5'5"9 33'10"12 5'9"1 35'2"8 1'3"12 36' 9"8 43'1"2 7'1"2 50'8" 7'6"14 5'1"2 5'1"2 9'9"14 4'8"12 14'5"8 4'7"10 16'9"4 2'3"12 22'4"9 5'7"5 28'1"11 5'9"1 33'11"4 5'9"9 36' 2'0"12 43'0"15 7'0"15 50'8" 7'7"12'1"6 2'1"6 6"32'7'6"18'1"11(a) 8'1" 10'1" A B C D E F G H I J K L M N O P QR STUVW X Y ZAAAB AC 5 12 3X5(B1)1.5X4 5X6 3X8 3X6 6X81.5X4 5X8 5X8 1.5X4 4X8 5X8 3X8 4X5 5X81.5X4 6X6 3X5(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 816 /-/-/469 /386 /428 X 1824 /-/0 /1233 /632 /0 R 2694 /-/-/1471 /1021 /- Z 877 /-/-/658 /357 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 X Brg Width = 3.5 Min Req =1.5 R Brg Width = 3.5 Min Req =2.8 Z Brg Width = 7.6 Min Req =1.5 Bearings B, X, R, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 455 -857 C - D 430 -372 D - E 396 -334 E - F 722 -1461 F - G 701 -1252 Chords Tens.Comp. G - H 701 -1252 H - I 308 -448 I - J 781 -41 J - K 914 -172 K - L 323 -817 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Y 697 -299 Y - X 688 -299 W -U 1175 -298 U - T 1281 -237 Chords Tens.Comp. T - S 376 -148 S - R 503 -761 R - O 497 -785 N - L 637 -185 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - X 344 -778 X - W 538 -1562 D - W 292 -461 W -E 409 -1530 G - T 374 -663 T - H 1257 -505 Webs Tens.Comp. H - S 490 -1238 S - I 1655 -539 I - R 463 -1630 R - J 412 -902 O - N 657 -194 O - K 633 -1239 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.074 U 999 360 VERT(CL):0.142 U 999 240 HORZ(LL):0.025 L - - HORZ(TL):0.050 S - - Creep Factor: 2.0 Max TC CSI:0.945 Max BC CSI:0.793 Max Web CSI:0.996 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T14 Ply: 1 Qty:1 SEQN:196791 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T5 / DrwNo:347.21.0852.51975 SSB /FV 12/13/2021 B1 9'10"10 25'5"10 15'3"12 5'2"8 5'2"8 9'9"14 4'7"6 14'4"7 4'6"9 18'9"4 4'4"13 25'4" 6'6"12 31'10"12 6'6"12 35'2"8 3'3"12 36' 9"8 43'0"15 7'0"15 50'8" 7'7"1 5'1"2 5'1"2 10'0"6 4'11"4 18'9"4 8'8"14 25'4" 6'6"12 31'10"12 6'6"12 36' 4'1"4 43'0"15 7'0"15 50'8" 7'7"12'1"6 2'1"6 6"32'8'4"18'11"11(a) (a) (a) 8'1" 10'1" A B C D E F G H I J K L M N O PQ RSTU V W XY Z 5 12 3X5(B1) 5X6 6X65X5 3X5 5X8 3X4 5X10 5X8 4X5 5X5 3X5 3X4 5X8 3X4 7X6 3X5(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 816 /-/-/469 /386 /428 X 1824 /-/0 /1233 /632 /0 R 2694 /-/-/1471 /1021 /- Z 877 /-/-/658 /357 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 X Brg Width = 3.5 Min Req =1.5 R Brg Width = 3.5 Min Req =2.8 Z Brg Width = 7.6 Min Req =1.5 Bearings B, X, R, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 455 -857 C - D 430 -372 D - E 396 -334 E - F 722 -1461 F - G 701 -1252 Chords Tens.Comp. G - H 701 -1252 H - I 308 -448 I - J 781 -41 J - K 914 -172 K - L 323 -817 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Y 697 -299 Y - X 688 -299 W -U 1175 -298 U - T 1281 -237 Chords Tens.Comp. T - S 376 -148 S - R 503 -761 R - O 497 -785 N - L 637 -185 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - X 344 -778 X - W 538 -1562 D - W 292 -461 W -E 409 -1530 G - T 374 -663 T - H 1257 -505 Webs Tens.Comp. H - S 490 -1238 S - I 1655 -539 I - R 463 -1630 R - J 412 -902 O - N 657 -194 O - K 633 -1239 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.074 U 999 360 VERT(CL):0.142 U 999 240 HORZ(LL):0.025 L - - HORZ(TL):0.050 S - - Creep Factor: 2.0 Max TC CSI:0.945 Max BC CSI:0.793 Max Web CSI:0.996 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T14 Ply: 1 Qty:1 SEQN:196791 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T5 / DrwNo:347.21.0852.51975 SSB /FV 12/13/2021 B1 9'10"10 25'5"10 15'3"12 5'2"8 5'2"8 9'9"14 4'7"6 14'4"7 4'6"9 18'9"4 4'4"13 25'4" 6'6"12 31'10"12 6'6"12 35'2"8 3'3"12 36' 9"8 43'0"15 7'0"15 50'8" 7'7"1 5'1"2 5'1"2 10'0"6 4'11"4 18'9"4 8'8"14 25'4" 6'6"12 31'10"12 6'6"12 36' 4'1"4 43'0"15 7'0"15 50'8" 7'7"12'1"6 2'1"6 6"32'8'4"18'11"11(a) (a) (a) 8'1" 10'1" A B C D E F G H I J K L M N O PQ RSTU V W XY Z 5 12 3X5(B1) 5X6 6X65X5 3X5 5X8 3X4 5X10 5X8 4X5 5X5 3X5 3X4 5X8 3X4 7X6 3X5(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T4,T5 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP 2250f-1.9E; B2,B3, B4 2x4 SP #2; Webs: 2x4 SP #2; W16 2x4 SP 2250f-1.9E; Rt W edge: 2x4 SP #2; Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 766 /-/-/421 /362 /466 AF 2865 /-/1 /1698 /1039 /0 AH 2488 /-/-/1587 /993 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 AF Brg Width = 3.5 Min Req =2.4 AH Brg Width = 7.6 Min Req =2.1 Bearings B, AF, & N are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 418 -745 C - D 543 -361 D - E 903 -1897 E - F 1371 -3269 F - G 1449 -3370 G - H 1624 -3692 Chords Tens.Comp. H - I 1624 -3692 I - J 2097 -4953 J - K 2031 -5011 K - L 3108 -7660 L - M 2969 -7628 M - N 1815 -4593 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AG 595 -266 AG-AF 586 -264 AB- Z 1774 -527 Z - Y 2978 -880 Chords Tens.Comp. Y - X 3034 -818 X - U 3960 -1158 T - Q 4818 -1614 P - N 4105 -1536 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. AG- C 399 -50 C -AF 405 -920 AF-AE 958 -2644 AE- D 890 -2460 D -AB 2327 -721 AB- E 468 -1321 E - Z 1328 -377 Z - F 228 -545 G - X 1054 -384 H - X 247 -434 Webs Tens.Comp. X - I 219 -446 I - U 2029 -807 U - T 4893 -1630 T - K 559 -1458 K - Q 3110 -1259 Q - L 290 -443 Q - P 4334 -1620 Q - M 2906 -969 P - M 757 -1770 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.539 S 901 360 VERT(CL):0.998 S 487 240 HORZ(LL):0.195 N - - HORZ(TL):0.361 N - - Creep Factor: 2.0 Max TC CSI:0.781 Max BC CSI:0.987 Max Web CSI:0.978 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T15 Ply: 1 Qty:1 SEQN:196787 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T7 / DrwNo:347.21.0852.52554 SSB /FV 12/13/2021 T4 T5 B2 B3 B4 W16 9'10"10 40'9"6 5'2"8 5'2"8 9'11"10 4'9"2 11'8"14 1'9"4 16'4"13 4'7"15 20'9"4 4'4"7 25'5"12 4'8"8 29'10"12 4'5" 31'7"12 1'9" 35'7"12 4' 39'11"4 4'3"8 44'11"14 5'0"10 50'8" 5'8"2 5'1"2 5'1"2 10'0"6 4'11"4 12'0"6 2' 16'1"5 4'0"15 20'9"4 4'7"15 25'5"12 4'8"8 31'6" 6'0"4 35'2"8 3'8"8 39'9"8 4'7" 44'10"3 5'0"11 50'8" 5'9"132'1"6 2'1"6 6"32'3'9'2"19'9"118'1"A B C D E F G H I J K L M N O P Q RS T U VWXYZ AAAB AC AD AE AFAG AH 5 12 3X5(B1) 5X6 6X6 5X5 5X6 7X8 3X5 3X5 3X4 5X8 5X8 3X10 5X8 H0615 SS0514 5X12 H0615 4X10 6X6 5X8(B2) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T4,T5 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP 2250f-1.9E; B2,B3, B4 2x4 SP #2; Webs: 2x4 SP #2; W16 2x4 SP 2250f-1.9E; Rt W edge: 2x4 SP #2; Plating Notes All plates are 1.5X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "W ARNING" note below. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 766 /-/-/421 /362 /466 AF 2865 /-/1 /1698 /1039 /0 AH 2488 /-/-/1587 /993 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 AF Brg Width = 3.5 Min Req =2.4 AH Brg Width = 7.6 Min Req =2.1 Bearings B, AF, & N are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 418 -745 C - D 543 -361 D - E 903 -1897 E - F 1371 -3269 F - G 1449 -3370 G - H 1624 -3692 Chords Tens.Comp. H - I 1624 -3692 I - J 2097 -4953 J - K 2031 -5011 K - L 3108 -7660 L - M 2969 -7628 M - N 1815 -4593 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AG 595 -266 AG-AF 586 -264 AB- Z 1774 -527 Z - Y 2978 -880 Chords Tens.Comp. Y - X 3034 -818 X - U 3960 -1158 T - Q 4818 -1614 P - N 4105 -1536 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. AG- C 399 -50 C -AF 405 -920 AF-AE 958 -2644 AE- D 890 -2460 D -AB 2327 -721 AB- E 468 -1321 E - Z 1328 -377 Z - F 228 -545 G - X 1054 -384 H - X 247 -434 Webs Tens.Comp. X - I 219 -446 I - U 2029 -807 U - T 4893 -1630 T - K 559 -1458 K - Q 3110 -1259 Q - L 290 -443 Q - P 4334 -1620 Q - M 2906 -969 P - M 757 -1770 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 5.07 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.539 S 901 360 VERT(CL):0.998 S 487 240 HORZ(LL):0.195 N - - HORZ(TL):0.361 N - - Creep Factor: 2.0 Max TC CSI:0.781 Max BC CSI:0.987 Max Web CSI:0.978 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T15 Ply: 1 Qty:1 SEQN:196787 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T7 / DrwNo:347.21.0852.52554 SSB /FV 12/13/2021 T4 T5 B2 B3 B4 W16 9'10"10 40'9"6 5'2"8 5'2"8 9'11"10 4'9"2 11'8"14 1'9"4 16'4"13 4'7"15 20'9"4 4'4"7 25'5"12 4'8"8 29'10"12 4'5" 31'7"12 1'9" 35'7"12 4' 39'11"4 4'3"8 44'11"14 5'0"10 50'8" 5'8"2 5'1"2 5'1"2 10'0"6 4'11"4 12'0"6 2' 16'1"5 4'0"15 20'9"4 4'7"15 25'5"12 4'8"8 31'6" 6'0"4 35'2"8 3'8"8 39'9"8 4'7" 44'10"3 5'0"11 50'8" 5'9"132'1"6 2'1"6 6"32'3'9'2"19'9"118'1"A B C D E F G H I J K L M N O P Q RS T U VWXYZ AAAB AC AD AE AFAG AH 5 12 3X5(B1) 5X6 6X6 5X5 5X6 7X8 3X5 3X5 3X4 5X8 5X8 3X10 5X8 H0615 SS0514 5X12 H0615 4X10 6X6 5X8(B2) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL T 1807 /-/-/932 /707 /229 I 1807 /-/-/948 /704 /- Wind reactions based on MWFRS T Brg Width = 3.6 Min Req =2.1 I Brg Width = 3.5 Min Req =2.1 Bearings T & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 825 -2054 B - C 1098 -2737 C - D 1074 -2378 D - E 1041 -2152 Chords Tens.Comp. E - F 1080 -2384 F - G 1186 -2832 G - H 881 -2235 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. R - P 1970 -773 P - O 2415 -850 Chords Tens.Comp. O - N 2111 -676 N - K 2529 -890 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - T 691 -1768 A - R 2176 -877 R - B 448 -912 B - P 466 -180 C - O 272 -475 D - O 444 -178 N - E 476 -181 Webs Tens.Comp. N - F 341 -649 K - G 592 -146 K - J 2008 -762 G - J 497 -1065 J - H 2095 -787 H - I 719 -1761 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.19 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.21 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.126 N 999 360 VERT(CL):0.236 N 999 240 HORZ(LL):0.081 I - - HORZ(TL):0.151 I - - Creep Factor: 2.0 Max TC CSI:0.930 Max BC CSI:0.625 Max Web CSI:0.491 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T16 Ply: 1 Qty:1 SEQN:196783 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T28 / DrwNo:347.21.0852.51319 SSB /FV 12/13/2021 32'1"7 2'0"13 2'0"13 9'0"2 6'11"5 13'1"3 4'1"1 18'2"11 5'1"8 21'9"15 3'7"4 26'9"15 5' 32'1"7 5'3"8 2'4"5 2'4"5 8'8"10 6'4"5 13'1"3 4'4"9 18'0"15 4'11"12 21'9"15 3'9" 26'11"11 5'1"12 32'1"7 5'1"122'6"92'2"91'8'0"110'1" A B C D E F G H IJ KLMNOP QRST 5 12 4X6 6X6 7X81.5X4 4X7 5X5 3X8 4X5 5X81.5X4 4X10 4X6 2X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL T 1807 /-/-/932 /707 /229 I 1807 /-/-/948 /704 /- Wind reactions based on MWFRS T Brg Width = 3.6 Min Req =2.1 I Brg Width = 3.5 Min Req =2.1 Bearings T & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 825 -2054 B - C 1098 -2737 C - D 1074 -2378 D - E 1041 -2152 Chords Tens.Comp. E - F 1080 -2384 F - G 1186 -2832 G - H 881 -2235 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. R - P 1970 -773 P - O 2415 -850 Chords Tens.Comp. O - N 2111 -676 N - K 2529 -890 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - T 691 -1768 A - R 2176 -877 R - B 448 -912 B - P 466 -180 C - O 272 -475 D - O 444 -178 N - E 476 -181 Webs Tens.Comp. N - F 341 -649 K - G 592 -146 K - J 2008 -762 G - J 497 -1065 J - H 2095 -787 H - I 719 -1761 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.19 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.21 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.126 N 999 360 VERT(CL):0.236 N 999 240 HORZ(LL):0.081 I - - HORZ(TL):0.151 I - - Creep Factor: 2.0 Max TC CSI:0.930 Max BC CSI:0.625 Max Web CSI:0.491 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T16 Ply: 1 Qty:1 SEQN:196783 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T28 / DrwNo:347.21.0852.51319 SSB /FV 12/13/2021 32'1"7 2'0"13 2'0"13 9'0"2 6'11"5 13'1"3 4'1"1 18'2"11 5'1"8 21'9"15 3'7"4 26'9"15 5' 32'1"7 5'3"8 2'4"5 2'4"5 8'8"10 6'4"5 13'1"3 4'4"9 18'0"15 4'11"12 21'9"15 3'9" 26'11"11 5'1"12 32'1"7 5'1"122'6"92'2"91'8'0"110'1" A B C D E F G H IJ KLMNOP QRST 5 12 4X6 6X6 7X81.5X4 4X7 5X5 3X8 4X5 5X81.5X4 4X10 4X6 2X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL S 1807 /-/-/922 /711 /260 I 1807 /-/-/938 /708 /- Wind reactions based on MWFRS S Brg Width = 3.6 Min Req =2.1 I Brg Width = -Min Req =- Bearing S is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 823 -2042 B - C 1111 -2751 C - D 993 -2200 D - E 992 -1954 Chords Tens.Comp. E - F 993 -2183 F - G 1200 -2846 G - H 883 -2230 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. Q - O 1953 -767 O - N 2434 -865 Chords Tens.Comp. N - K 2551 -908 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - S 695 -1768 A - Q 2157 -870 Q - B 444 -905 B - O 503 -200 C - N 363 -644 D - N 503 -210 N - E 496 -207 Webs Tens.Comp. N - F 433 -823 K - G 625 -166 K - J 2007 -759 G - J 496 -1062 J - H 2087 -786 H - I 723 -1761 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.61 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.21 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.127 M 999 360 VERT(CL):0.238 M 999 240 HORZ(LL):0.083 I - - HORZ(TL):0.156 I - - Creep Factor: 2.0 Max TC CSI:0.791 Max BC CSI:0.698 Max Web CSI:0.914 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T17 Ply: 1 Qty:1 SEQN:196779 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T23 / DrwNo:347.21.0852.52631 SSB /FV 12/13/2021 32'1"7 2'0"13 2'0"13 9'0"2 6'11"5 15'1"3 6'1"1 16'2"11 1'1"8 21'9"15 5'7"4 26'9"15 5' 32'1"7 5'3"8 2'4"5 2'4"5 8'5"4 6'0"15 15'7"15 7'2"11 21'9"15 6'2" 26'11"11 5'1"12 32'1"7 5'1"122'6"92'2"91'8'10"1(a) 10'1" A B C D E F G H IJ KLMNO PQRS 5 12 4X6 6X6 7X81.5X4 5X10 4X5 3X10 5X5 5X81.5X4 4X10 4X6 2X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL S 1807 /-/-/922 /711 /260 I 1807 /-/-/938 /708 /- Wind reactions based on MWFRS S Brg Width = 3.6 Min Req =2.1 I Brg Width = -Min Req =- Bearing S is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 823 -2042 B - C 1111 -2751 C - D 993 -2200 D - E 992 -1954 Chords Tens.Comp. E - F 993 -2183 F - G 1200 -2846 G - H 883 -2230 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. Q - O 1953 -767 O - N 2434 -865 Chords Tens.Comp. N - K 2551 -908 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - S 695 -1768 A - Q 2157 -870 Q - B 444 -905 B - O 503 -200 C - N 363 -644 D - N 503 -210 N - E 496 -207 Webs Tens.Comp. N - F 433 -823 K - G 625 -166 K - J 2007 -759 G - J 496 -1062 J - H 2087 -786 H - I 723 -1761 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.61 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.21 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.127 M 999 360 VERT(CL):0.238 M 999 240 HORZ(LL):0.083 I - - HORZ(TL):0.156 I - - Creep Factor: 2.0 Max TC CSI:0.791 Max BC CSI:0.698 Max Web CSI:0.914 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T17 Ply: 1 Qty:1 SEQN:196779 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T23 / DrwNo:347.21.0852.52631 SSB /FV 12/13/2021 32'1"7 2'0"13 2'0"13 9'0"2 6'11"5 15'1"3 6'1"1 16'2"11 1'1"8 21'9"15 5'7"4 26'9"15 5' 32'1"7 5'3"8 2'4"5 2'4"5 8'5"4 6'0"15 15'7"15 7'2"11 21'9"15 6'2" 26'11"11 5'1"12 32'1"7 5'1"122'6"92'2"91'8'10"1(a) 10'1" A B C D E F G H IJ KLMNO PQRS 5 12 4X6 6X6 7X81.5X4 5X10 4X5 3X10 5X5 5X81.5X4 4X10 4X6 2X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL R 1807 /-/-/918 /712 /269 H 1807 /-/-/934 /710 /- Wind reactions based on MWFRS R Brg Width = 3.6 Min Req =2.1 H Brg Width = -Min Req =- Bearing R is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 823 -2041 B - C 1113 -2752 C - D 995 -2199 Chords Tens.Comp. D - E 995 -2182 E - F 1202 -2847 F - G 884 -2229 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. P - N 1951 -766 N - M 2436 -868 Chords Tens.Comp. M - J 2554 -910 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - R 696 -1768 A - P 2154 -870 P - B 444 -904 B - N 507 -200 C - M 368 -648 D - M 1003 -422 Webs Tens.Comp. M - E 439 -829 J - F 629 -169 J - I 2006 -760 F - I 497 -1062 I - G 2086 -787 G - H 724 -1761 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.73 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.21 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.130 M 999 360 VERT(CL):0.244 M 999 240 HORZ(LL):0.083 H - - HORZ(TL):0.156 H - - Creep Factor: 2.0 Max TC CSI:0.804 Max BC CSI:0.698 Max Web CSI:0.947 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T18 Ply: 1 Qty:2 SEQN:196775 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T29 / DrwNo:347.21.0852.51366 SSB /FV 12/13/2021 32'1"7 2'0"13 2'0"13 9'0"2 6'11"5 15'7"15 6'7"13 21'9"15 6'2" 26'9"15 5' 32'1"7 5'3"8 2'4"5 2'4"5 8'8"10 6'4"5 15'7"15 6'11"5 21'9"15 6'2" 26'11"11 5'1"12 32'1"7 5'1"122'6"92'2"91'9'0"14(a) 10'1" A B C D E F G HI JKLMN OPQR 5 12 4X6 6X6 7X81.5X4 3X4 5X5 3X4 5X5 3X8 3X4 5X81.5X4 3X4 4X10 4X6 2X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL R 1807 /-/-/918 /712 /269 H 1807 /-/-/934 /710 /- Wind reactions based on MWFRS R Brg Width = 3.6 Min Req =2.1 H Brg Width = -Min Req =- Bearing R is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 823 -2041 B - C 1113 -2752 C - D 995 -2199 Chords Tens.Comp. D - E 995 -2182 E - F 1202 -2847 F - G 884 -2229 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. P - N 1951 -766 N - M 2436 -868 Chords Tens.Comp. M - J 2554 -910 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - R 696 -1768 A - P 2154 -870 P - B 444 -904 B - N 507 -200 C - M 368 -648 D - M 1003 -422 Webs Tens.Comp. M - E 439 -829 J - F 629 -169 J - I 2006 -760 F - I 497 -1062 I - G 2086 -787 G - H 724 -1761 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.73 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.21 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.130 M 999 360 VERT(CL):0.244 M 999 240 HORZ(LL):0.083 H - - HORZ(TL):0.156 H - - Creep Factor: 2.0 Max TC CSI:0.804 Max BC CSI:0.698 Max Web CSI:0.947 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T18 Ply: 1 Qty:2 SEQN:196775 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T29 / DrwNo:347.21.0852.51366 SSB /FV 12/13/2021 32'1"7 2'0"13 2'0"13 9'0"2 6'11"5 15'7"15 6'7"13 21'9"15 6'2" 26'9"15 5' 32'1"7 5'3"8 2'4"5 2'4"5 8'8"10 6'4"5 15'7"15 6'11"5 21'9"15 6'2" 26'11"11 5'1"12 32'1"7 5'1"122'6"92'2"91'9'0"14(a) 10'1" A B C D E F G HI JKLMN OPQR 5 12 4X6 6X6 7X81.5X4 3X4 5X5 3X4 5X5 3X8 3X4 5X81.5X4 3X4 4X10 4X6 2X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL L 1807 /-/-/918 /712 /269 H 1807 /-/-/934 /710 /- Wind reactions based on MWFRS L Brg Width = 3.6 Min Req =2.1 H Brg Width = -Min Req =- Bearing L is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 926 -2158 C - D 925 -1945 Chords Tens.Comp. D - E 925 -1945 E - F 999 -2333 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. L - K 1629 -630 K - J 1983 -706 Chords Tens.Comp. J - I 2067 -741 I - H 1909 -753 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - B 917 -2285 B - K 441 -45 C - J 299 -419 Webs Tens.Comp. D - J 879 -402 J - E 349 -542 F - H 970 -2444 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.73 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.21 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.099 J 999 360 VERT(CL):0.186 J 999 240 HORZ(LL):0.054 H - - HORZ(TL):0.100 H - - Creep Factor: 2.0 Max TC CSI:0.575 Max BC CSI:0.793 Max Web CSI:0.660 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T19 Ply: 1 Qty:1 SEQN:196771 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T30 / DrwNo:347.21.0852.51648 SSB /FV 12/13/2021 32'1"7 3'10"10 3'10"10 9'9"5 5'10"10 15'7"15 5'10"10 21'6"9 5'10"10 27'5"4 5'10"10 32'1"7 4'8"3 6'9"15 6'9"15 15'7"15 8'9"15 24'5"14 8'9"15 32'1"7 7'7"92'6"92'2"99'0"14(a) (a)(a) (a) 10'1" A B C D E F G HIJKL 5 12 1.5X4 6X6 4X6 3X4 3X4 5X5 5X8 3X4 3X4 4X6 1.5X4 6X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL L 1807 /-/-/918 /712 /269 H 1807 /-/-/934 /710 /- Wind reactions based on MWFRS L Brg Width = 3.6 Min Req =2.1 H Brg Width = -Min Req =- Bearing L is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 926 -2158 C - D 925 -1945 Chords Tens.Comp. D - E 925 -1945 E - F 999 -2333 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. L - K 1629 -630 K - J 1983 -706 Chords Tens.Comp. J - I 2067 -741 I - H 1909 -753 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - B 917 -2285 B - K 441 -45 C - J 299 -419 Webs Tens.Comp. D - J 879 -402 J - E 349 -542 F - H 970 -2444 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.73 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.21 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.099 J 999 360 VERT(CL):0.186 J 999 240 HORZ(LL):0.054 H - - HORZ(TL):0.100 H - - Creep Factor: 2.0 Max TC CSI:0.575 Max BC CSI:0.793 Max Web CSI:0.660 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T19 Ply: 1 Qty:1 SEQN:196771 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T30 / DrwNo:347.21.0852.51648 SSB /FV 12/13/2021 32'1"7 3'10"10 3'10"10 9'9"5 5'10"10 15'7"15 5'10"10 21'6"9 5'10"10 27'5"4 5'10"10 32'1"7 4'8"3 6'9"15 6'9"15 15'7"15 8'9"15 24'5"14 8'9"15 32'1"7 7'7"92'6"92'2"99'0"14(a) (a)(a) (a) 10'1" A B C D E F G HIJKL 5 12 1.5X4 6X6 4X6 3X4 3X4 5X5 5X8 3X4 3X4 4X6 1.5X4 6X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (b) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. (a) 2x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 10d Box or Gun (0.128"x3",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL L 1919 /-/-/1013 /750 /297 H 1919 /-/-/989 /753 /- Wind reactions based on MWFRS L Brg Width = 3.6 Min Req =2.3 H Brg Width = -Min Req =- Bearing L is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1182 -2784 C - D 1017 -2172 Chords Tens.Comp. D - E 1018 -2173 E - F 1071 -2515 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. L - K 2475 -993 K - J 2381 -865 Chords Tens.Comp. J - I 2255 -816 I - H 2045 -806 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - B 1128 -2879 C - J 404 -690 D - J 1046 -469 Webs Tens.Comp. J - E 332 -507 F - H 1039 -2620 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.48 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.41 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.136 C 999 360 VERT(CL):0.254 C 999 240 HORZ(LL):0.068 H - - HORZ(TL):0.128 H - - Creep Factor: 2.0 Max TC CSI:0.629 Max BC CSI:0.974 Max Web CSI:0.820 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T20 Ply: 1 Qty:1 SEQN:196762 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T1 DrwNo:347.21.0852.52633 SSB /FV 12/13/2021 34'1"7 5'10"10 5'10"10 11'8"15 5'10"4 17'7"15 5'11" 23'6"9 5'10"10 29'5"4 5'10"10 34'1"7 4'8"3 8'9"15 8'9"15 17'7"15 8'9"15 26'5"14 8'9"15 34'1"7 7'7"91'8"92'2"99'0"14(a) (b)(b) (b) 10'1" A B C D E F G HIJKL 5 12 1.5X4 6X6 4X6 3X4 5X5 5X5 5X8 3X4 3X4 5X5 1.5X4 6X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (b) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. (a) 2x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 10d Box or Gun (0.128"x3",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL L 1919 /-/-/1013 /750 /297 H 1919 /-/-/989 /753 /- Wind reactions based on MWFRS L Brg Width = 3.6 Min Req =2.3 H Brg Width = -Min Req =- Bearing L is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1182 -2784 C - D 1017 -2172 Chords Tens.Comp. D - E 1018 -2173 E - F 1071 -2515 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. L - K 2475 -993 K - J 2381 -865 Chords Tens.Comp. J - I 2255 -816 I - H 2045 -806 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. L - B 1128 -2879 C - J 404 -690 D - J 1046 -469 Webs Tens.Comp. J - E 332 -507 F - H 1039 -2620 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.48 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.41 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.136 C 999 360 VERT(CL):0.254 C 999 240 HORZ(LL):0.068 H - - HORZ(TL):0.128 H - - Creep Factor: 2.0 Max TC CSI:0.629 Max BC CSI:0.974 Max Web CSI:0.820 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T20 Ply: 1 Qty:1 SEQN:196762 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T1 DrwNo:347.21.0852.52633 SSB /FV 12/13/2021 34'1"7 5'10"10 5'10"10 11'8"15 5'10"4 17'7"15 5'11" 23'6"9 5'10"10 29'5"4 5'10"10 34'1"7 4'8"3 8'9"15 8'9"15 17'7"15 8'9"15 26'5"14 8'9"15 34'1"7 7'7"91'8"92'2"99'0"14(a) (b)(b) (b) 10'1" A B C D E F G HIJKL 5 12 1.5X4 6X6 4X6 3X4 5X5 5X5 5X8 3X4 3X4 5X5 1.5X4 6X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (b) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. (a) 2x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 10d Box or Gun (0.128"x3",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M 1919 /-/-/1017 /749 /287 I 1919 /-/-/993 /752 /- Wind reactions based on MWFRS M Brg Width = 3.6 Min Req =2.3 I Brg Width = -Min Req =- Bearing M is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1179 -2782 C - D 1014 -2173 D - E 1006 -1943 Chords Tens.Comp. E - F 1015 -2174 F - G 1070 -2515 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. M - L 2473 -989 L - K 2381 -864 Chords Tens.Comp. K - J 2253 -814 J - I 2045 -805 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - B 1124 -2875 C - K 401 -688 D - K 516 -229 Webs Tens.Comp. K - E 528 -236 K - F 328 -503 G - I 1038 -2621 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.36 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.41 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.133 C 999 360 VERT(CL):0.250 C 999 240 HORZ(LL):0.068 I - - HORZ(TL):0.128 I - - Creep Factor: 2.0 Max TC CSI:0.610 Max BC CSI:0.973 Max Web CSI:0.819 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T21 Ply: 1 Qty:1 SEQN:196767 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T25 / DrwNo:347.21.0852.52663 SSB /FV 12/13/2021 34'1"7 5'10"7 5'10"7 11'9"5 5'10"13 17'1"3 5'3"14 18'2"11 1'1"8 23'6"9 5'3"14 29'5"4 5'10"10 34'1"7 4'8"3 8'9"15 8'9"15 17'7"15 8'9"15 26'5"14 8'9"15 34'1"7 7'7"9 1'8"9 2'2"98'10"1(a) (b)(b) (b) 10'1" A B C D E F G H IJKLM 5 12 1.5X4 6X6 6X6 3X4 3X4 5X5 5X10 5X5 3X4 3X4 5X5 1.5X4 6X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (b) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. (a) 2x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 10d Box or Gun (0.128"x3",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M 1919 /-/-/1017 /749 /287 I 1919 /-/-/993 /752 /- Wind reactions based on MWFRS M Brg Width = 3.6 Min Req =2.3 I Brg Width = -Min Req =- Bearing M is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1179 -2782 C - D 1014 -2173 D - E 1006 -1943 Chords Tens.Comp. E - F 1015 -2174 F - G 1070 -2515 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. M - L 2473 -989 L - K 2381 -864 Chords Tens.Comp. K - J 2253 -814 J - I 2045 -805 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - B 1124 -2875 C - K 401 -688 D - K 516 -229 Webs Tens.Comp. K - E 528 -236 K - F 328 -503 G - I 1038 -2621 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.36 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.41 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.133 C 999 360 VERT(CL):0.250 C 999 240 HORZ(LL):0.068 I - - HORZ(TL):0.128 I - - Creep Factor: 2.0 Max TC CSI:0.610 Max BC CSI:0.973 Max Web CSI:0.819 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T21 Ply: 1 Qty:1 SEQN:196767 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T25 / DrwNo:347.21.0852.52663 SSB /FV 12/13/2021 34'1"7 5'10"7 5'10"7 11'9"5 5'10"13 17'1"3 5'3"14 18'2"11 1'1"8 23'6"9 5'3"14 29'5"4 5'10"10 34'1"7 4'8"3 8'9"15 8'9"15 17'7"15 8'9"15 26'5"14 8'9"15 34'1"7 7'7"9 1'8"9 2'2"98'10"1(a) (b)(b) (b) 10'1" A B C D E F G H IJKLM 5 12 1.5X4 6X6 6X6 3X4 3X4 5X5 5X10 5X5 3X4 3X4 5X5 1.5X4 6X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M 1919 /-/-/1025 /745 /255 H 1919 /-/-/1001 /748 /- Wind reactions based on MWFRS M Brg Width = 3.6 Min Req =2.3 H Brg Width = -Min Req =- Bearing M is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1162 -2776 C - D 1082 -2396 D - E 1040 -2091 Chords Tens.Comp. E - F 1052 -2394 F - G 1021 -2596 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. M - L 2386 -953 L - K 2461 -911 Chords Tens.Comp. K - J 2125 -703 J - I 2324 -873 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - B 1108 -2852 C - K 308 -498 D - K 487 -181 Webs Tens.Comp. F - I 302 -480 I - G 2342 -870 G - H 769 -1861 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.41 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.129 K 999 360 VERT(CL):0.241 K 999 240 HORZ(LL):0.056 H - - HORZ(TL):0.105 H - - Creep Factor: 2.0 Max TC CSI:0.554 Max BC CSI:0.789 Max Web CSI:0.788 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T22 Ply: 1 Qty:1 SEQN:196758 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T26 / DrwNo:347.21.0852.52148 SSB /FV 12/13/2021 T3 34'1"7 5'0"6 5'0"6 10'0"13 5'0"6 15'1"3 5'0"6 20'2"11 5'1"8 27'0"5 6'9"10 34'1"7 7'1"2 7'6"9 7'6"9 15'1"3 7'6"9 20'0"15 4'11"12 27'4"5 7'3"6 34'1"7 6'9"21'8"92'2"98'0"1(a) (a) (a) 10'1" A B C D E F G HIJKLM 5 12 1.5X4 6X6 5X5 3X4 3X4 5X8 5X5 5X8 5X5 3X4 3X8 4X6 3X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M 1919 /-/-/1025 /745 /255 H 1919 /-/-/1001 /748 /- Wind reactions based on MWFRS M Brg Width = 3.6 Min Req =2.3 H Brg Width = -Min Req =- Bearing M is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1162 -2776 C - D 1082 -2396 D - E 1040 -2091 Chords Tens.Comp. E - F 1052 -2394 F - G 1021 -2596 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. M - L 2386 -953 L - K 2461 -911 Chords Tens.Comp. K - J 2125 -703 J - I 2324 -873 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. M - B 1108 -2852 C - K 308 -498 D - K 487 -181 Webs Tens.Comp. F - I 302 -480 I - G 2342 -870 G - H 769 -1861 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.41 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.129 K 999 360 VERT(CL):0.241 K 999 240 HORZ(LL):0.056 H - - HORZ(TL):0.105 H - - Creep Factor: 2.0 Max TC CSI:0.554 Max BC CSI:0.789 Max Web CSI:0.788 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T22 Ply: 1 Qty:1 SEQN:196758 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T26 / DrwNo:347.21.0852.52148 SSB /FV 12/13/2021 T3 34'1"7 5'0"6 5'0"6 10'0"13 5'0"6 15'1"3 5'0"6 20'2"11 5'1"8 27'0"5 6'9"10 34'1"7 7'1"2 7'6"9 7'6"9 15'1"3 7'6"9 20'0"15 4'11"12 27'4"5 7'3"6 34'1"7 6'9"21'8"92'2"98'0"1(a) (a) (a) 10'1" A B C D E F G HIJKLM 5 12 1.5X4 6X6 5X5 3X4 3X4 5X8 5X5 5X8 5X5 3X4 3X8 4X6 3X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N 1919 /-/-/1024 /747 /221 H 1919 /-/-/1000 /750 /- Wind reactions based on MWFRS N Brg Width = 3.6 Min Req =2.3 H Brg Width = -Min Req =- Bearing N is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 1115 -2855 B - C 1119 -2609 C - D 1137 -2400 Chords Tens.Comp. D - E 1137 -2400 E - F 1082 -2495 F - G 980 -2482 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. M - L 2568 -996 L - K 2290 -796 Chords Tens.Comp. K - J 2196 -758 J - I 2239 -850 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - N 765 -1862 A - M 2547 -947 M - B 267 -408 D - K 218 -397 Webs Tens.Comp. F - I 325 -589 I - G 2285 -857 G - H 767 -1868 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.41 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.132 D 999 360 VERT(CL):0.248 D 999 240 HORZ(LL):0.045 H - - HORZ(TL):0.085 H - - Creep Factor: 2.0 Max TC CSI:0.762 Max BC CSI:0.668 Max Web CSI:0.696 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T23 Ply: 1 Qty:1 SEQN:196754 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T19 / DrwNo:347.21.0852.52194 SSB /FV 12/13/2021 T1 34'1"7 6'8"5 6'8"5 13'1"3 6'4"13 17'7"15 4'6"12 22'2"11 4'6"12 28'0"5 5'9"10 34'1"7 6'1"2 6'4"13 6'4"13 13'1"3 6'8"5 17'7"15 4'6"12 22'2"11 4'6"12 28'4"5 6'1"10 34'1"7 5'9"2 1'8"9 2'2"97'2"110'1" A B C D E F G HIJKLMN 5 12 5X5 3X6 5X6 3X4 5X8 3X4 1.5X4 5X8 5X8 3X4 3X4 3X8 4X6 3X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N 1919 /-/-/1024 /747 /221 H 1919 /-/-/1000 /750 /- Wind reactions based on MWFRS N Brg Width = 3.6 Min Req =2.3 H Brg Width = -Min Req =- Bearing N is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 1115 -2855 B - C 1119 -2609 C - D 1137 -2400 Chords Tens.Comp. D - E 1137 -2400 E - F 1082 -2495 F - G 980 -2482 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. M - L 2568 -996 L - K 2290 -796 Chords Tens.Comp. K - J 2196 -758 J - I 2239 -850 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - N 765 -1862 A - M 2547 -947 M - B 267 -408 D - K 218 -397 Webs Tens.Comp. F - I 325 -589 I - G 2285 -857 G - H 767 -1868 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.41 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.132 D 999 360 VERT(CL):0.248 D 999 240 HORZ(LL):0.045 H - - HORZ(TL):0.085 H - - Creep Factor: 2.0 Max TC CSI:0.762 Max BC CSI:0.668 Max Web CSI:0.696 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T23 Ply: 1 Qty:1 SEQN:196754 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T19 / DrwNo:347.21.0852.52194 SSB /FV 12/13/2021 T1 34'1"7 6'8"5 6'8"5 13'1"3 6'4"13 17'7"15 4'6"12 22'2"11 4'6"12 28'0"5 5'9"10 34'1"7 6'1"2 6'4"13 6'4"13 13'1"3 6'8"5 17'7"15 4'6"12 22'2"11 4'6"12 28'4"5 6'1"10 34'1"7 5'9"2 1'8"9 2'2"97'2"110'1" A B C D E F G HIJKLMN 5 12 5X5 3X6 5X6 3X4 5X8 3X4 1.5X4 5X8 5X8 3X4 3X4 3X8 4X6 3X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL P 1966 /-/-/1039 /767 /188 H 1966 /-/-/1031 /768 /- Wind reactions based on MWFRS P Brg Width = 3.6 Min Req =2.3 H Brg Width = 5.5 Min Req =2.3 Bearings P & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 1105 -2813 B - C 1195 -2823 C - D 1319 -2916 Chords Tens.Comp. D - E 1319 -2916 E - F 1198 -2750 F - G 1167 -2933 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. O - N 2551 -979 N - M 2513 -890 Chords Tens.Comp. M - L 2459 -866 L - I 2622 -998 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - P 782 -1915 A - O 2552 -960 O - B 296 -535 C - M 548 -216 Webs Tens.Comp. D - M 372 -656 M - E 620 -249 I - G 2635 -1001 G - H 798 -1897 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.50 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.172 D 999 360 VERT(CL):0.322 D 999 240 HORZ(LL):0.086 H - - HORZ(TL):0.161 H - - Creep Factor: 2.0 Max TC CSI:0.949 Max BC CSI:0.668 Max Web CSI:0.810 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T24 Ply: 1 Qty:1 SEQN:196750 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T27 / DrwNo:347.21.0852.52678 SSB /FV 12/13/2021 T3 34'11"7 5'8"5 5'8"5 11'1"3 5'4"13 17'7"15 6'6"12 24'2"11 6'6"12 27'11"15 3'9"4 34'11"7 6'11"8 5'4"13 5'4"13 11'1"3 5'8"5 17'7"15 6'6"12 24'2"11 6'6"12 27'11"15 3'9"4 34'11"7 6'11"82'1'8"9 3'10"68'4"110'1" 8'1" A B C D E F G H I JK LMNOP 5 12 4X7 3X6 5X6 3X4 5X8 5X5 1.5X4 3X8 5X8 3X4 3X4 5X121.5X6 4X7 6X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL P 1966 /-/-/1039 /767 /188 H 1966 /-/-/1031 /768 /- Wind reactions based on MWFRS P Brg Width = 3.6 Min Req =2.3 H Brg Width = 5.5 Min Req =2.3 Bearings P & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 1105 -2813 B - C 1195 -2823 C - D 1319 -2916 Chords Tens.Comp. D - E 1319 -2916 E - F 1198 -2750 F - G 1167 -2933 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. O - N 2551 -979 N - M 2513 -890 Chords Tens.Comp. M - L 2459 -866 L - I 2622 -998 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - P 782 -1915 A - O 2552 -960 O - B 296 -535 C - M 548 -216 Webs Tens.Comp. D - M 372 -656 M - E 620 -249 I - G 2635 -1001 G - H 798 -1897 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.50 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.172 D 999 360 VERT(CL):0.322 D 999 240 HORZ(LL):0.086 H - - HORZ(TL):0.161 H - - Creep Factor: 2.0 Max TC CSI:0.949 Max BC CSI:0.668 Max Web CSI:0.810 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T24 Ply: 1 Qty:1 SEQN:196750 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T27 / DrwNo:347.21.0852.52678 SSB /FV 12/13/2021 T3 34'11"7 5'8"5 5'8"5 11'1"3 5'4"13 17'7"15 6'6"12 24'2"11 6'6"12 27'11"15 3'9"4 34'11"7 6'11"8 5'4"13 5'4"13 11'1"3 5'8"5 17'7"15 6'6"12 24'2"11 6'6"12 27'11"15 3'9"4 34'11"7 6'11"82'1'8"9 3'10"68'4"110'1" 8'1" A B C D E F G H I JK LMNOP 5 12 4X7 3X6 5X6 3X4 5X8 5X5 1.5X4 3X8 5X8 3X4 3X4 5X121.5X6 4X7 6X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL P 1966 /-/-/1027 /769 /154 I 1966 /-/-/1019 /770 /- Wind reactions based on MWFRS P Brg Width = 3.6 Min Req =2.3 I Brg Width = 5.5 Min Req =2.3 Bearings P & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1197 -2900 C - D 1441 -3279 D - E 1441 -3278 Chords Tens.Comp. E - F 1408 -3228 F - G 1324 -2913 G - H 1171 -2937 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. P - O 2357 -950 O - N 2602 -936 Chords Tens.Comp. N - M 3259 -1207 M - J 2544 -940 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. P - B 1158 -2852 C - N 905 -383 D - N 303 -536 E - M 323 -557 Webs Tens.Comp. M - F 951 -347 J - G 385 -553 J - H 2646 -1009 H - I 798 -1899 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.50 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.198 D 999 360 VERT(CL):0.371 D 999 240 HORZ(LL):0.104 I - - HORZ(TL):0.196 I - - Creep Factor: 2.0 Max TC CSI:0.745 Max BC CSI:0.974 Max Web CSI:0.816 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T25 Ply: 1 Qty:1 SEQN:196744 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T24 / DrwNo:347.21.0852.51866 SSB /FV 12/13/2021 T3 34'11"7 4'6"9 4'6"9 9'1"3 4'6"9 14'11"7 5'10"4 20'6"3 5'6"12 26'2"11 5'8"8 28'1"11 1'11" 34'11"7 6'9"12 9'1"3 9'1"3 14'11"7 5'10"4 20'9"11 5'10"4 27'11"15 7'2"4 34'11"7 6'11"82'1'8"9 3'10"67'6"1(a) 10'1" 8'1" A B C D E F G H I J KL MNOP 5 12 1.5X4 6X6 4X5 5X8 3X4 1.5X4 5X8 3X4 3X4 5X5 5X121.5X6 1.5X4 4X7 6X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL P 1966 /-/-/1027 /769 /154 I 1966 /-/-/1019 /770 /- Wind reactions based on MWFRS P Brg Width = 3.6 Min Req =2.3 I Brg Width = 5.5 Min Req =2.3 Bearings P & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1197 -2900 C - D 1441 -3279 D - E 1441 -3278 Chords Tens.Comp. E - F 1408 -3228 F - G 1324 -2913 G - H 1171 -2937 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. P - O 2357 -950 O - N 2602 -936 Chords Tens.Comp. N - M 3259 -1207 M - J 2544 -940 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. P - B 1158 -2852 C - N 905 -383 D - N 303 -536 E - M 323 -557 Webs Tens.Comp. M - F 951 -347 J - G 385 -553 J - H 2646 -1009 H - I 798 -1899 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.50 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.198 D 999 360 VERT(CL):0.371 D 999 240 HORZ(LL):0.104 I - - HORZ(TL):0.196 I - - Creep Factor: 2.0 Max TC CSI:0.745 Max BC CSI:0.974 Max Web CSI:0.816 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T25 Ply: 1 Qty:1 SEQN:196744 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T24 / DrwNo:347.21.0852.51866 SSB /FV 12/13/2021 T3 34'11"7 4'6"9 4'6"9 9'1"3 4'6"9 14'11"7 5'10"4 20'6"3 5'6"12 26'2"11 5'8"8 28'1"11 1'11" 34'11"7 6'9"12 9'1"3 9'1"3 14'11"7 5'10"4 20'9"11 5'10"4 27'11"15 7'2"4 34'11"7 6'11"82'1'8"9 3'10"67'6"1(a) 10'1" 8'1" A B C D E F G H I J KL MNOP 5 12 1.5X4 6X6 4X5 5X8 3X4 1.5X4 5X8 3X4 3X4 5X5 5X121.5X6 1.5X4 4X7 6X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; T3,T4 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 747 /-/-/448 /181 /297 S 3184 /-/-/1677 /1287 /- J 1315 /-/-/729 /496 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 S Brg Width = 3.5 Min Req =3.4 J Brg Width = 5.5 Min Req =1.6 Bearings B, S, & J are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 587 -525 C - D 1392 -482 E - F 543 -1278 Chords Tens.Comp. F - G 543 -1278 G - H 769 -1799 H - I 694 -1811 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 374 -489 T - S 370 -493 Chords Tens.Comp. O - N 1805 -607 N - K 1578 -554 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - S 607 -1214 D - S 780 -1866 D - Q 1430 -526 S - Q 626 -1412 Q - E 713 -1594 Webs Tens.Comp. E - O 1752 -687 F - O 288 -505 O - G 297 -735 K - I 1583 -557 I - J 525 -1249 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 4.26 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.085 G 999 360 VERT(CL):0.167 G 999 240 HORZ(LL):0.039 J - - HORZ(TL):0.073 J - - Creep Factor: 2.0 Max TC CSI:0.709 Max BC CSI:0.480 Max Web CSI:0.637 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T26 Ply: 1 Qty:1 SEQN:196740 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T31 / DrwNo:347.21.0852.52725 SSB /FV 12/13/2021 T3 T4 14'9"12 27'9"12 7'7"6 7'7"6 14'9"4 7'1"14 18'11"8 4'2"4 24'5"8 5'6" 29'11"8 5'6" 35'10"12 5'11"4 42'7"8 6'8"12 7'5"15 7'5"15 14'11" 7'5"1 19'3" 4'4" 24'5"8 5'2"8 30'3" 5'9"8 35'7"4 5'4"4 42'7"8 7'0"42'1"6 6"3 3'10"62'6'8"17'3"11(a) (a) 8'1"A B C D E F G H I J K LM NO P Q RST 5 12 3X5(B1)5X5 H0510 5X8 4X7 6X81.5X4 4X5 5X6 5X8 3X4 3X4 6X81.5X6 5X8 4X4 6X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; T3,T4 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 747 /-/-/448 /181 /297 S 3184 /-/-/1677 /1287 /- J 1315 /-/-/729 /496 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 S Brg Width = 3.5 Min Req =3.4 J Brg Width = 5.5 Min Req =1.6 Bearings B, S, & J are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 587 -525 C - D 1392 -482 E - F 543 -1278 Chords Tens.Comp. F - G 543 -1278 G - H 769 -1799 H - I 694 -1811 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 374 -489 T - S 370 -493 Chords Tens.Comp. O - N 1805 -607 N - K 1578 -554 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - S 607 -1214 D - S 780 -1866 D - Q 1430 -526 S - Q 626 -1412 Q - E 713 -1594 Webs Tens.Comp. E - O 1752 -687 F - O 288 -505 O - G 297 -735 K - I 1583 -557 I - J 525 -1249 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 4.26 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.085 G 999 360 VERT(CL):0.167 G 999 240 HORZ(LL):0.039 J - - HORZ(TL):0.073 J - - Creep Factor: 2.0 Max TC CSI:0.709 Max BC CSI:0.480 Max Web CSI:0.637 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T26 Ply: 1 Qty:1 SEQN:196740 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T31 / DrwNo:347.21.0852.52725 SSB /FV 12/13/2021 T3 T4 14'9"12 27'9"12 7'7"6 7'7"6 14'9"4 7'1"14 18'11"8 4'2"4 24'5"8 5'6" 29'11"8 5'6" 35'10"12 5'11"4 42'7"8 6'8"12 7'5"15 7'5"15 14'11" 7'5"1 19'3" 4'4" 24'5"8 5'2"8 30'3" 5'9"8 35'7"4 5'4"4 42'7"8 7'0"42'1"6 6"3 3'10"62'6'8"17'3"11(a) (a) 8'1"A B C D E F G H I J K LM NO P Q RST 5 12 3X5(B1)5X5 H0510 5X8 4X7 6X81.5X4 4X5 5X6 5X8 3X4 3X4 6X81.5X6 5X8 4X4 6X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 668 /-/-/434 /178 /261 R 3113 /-/-/1655 /1291 /- M 1395 /-/-/727 /500 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 R Brg Width = 3.5 Min Req =1.5 M Brg Width = 5.5 Min Req =1.6 Bearings B, R, & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 60 -581 C - D 72 -540 E - F 1110 -432 F - G 960 -333 G - H 230 -627 Chords Tens.Comp. H - I 532 -1449 I - J 532 -1449 J - K 627 -1566 K - L 430 -1166 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Z 452 -261 X - V 697 -343 R - Q 584 -1272 Chords Tens.Comp. Q - P 695 -173 P - O 1588 -523 O - N 1013 -341 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - V 275 -471 E - S 476 -980 F - S 341 -687 S - G 895 -363 S - R 618 -1325 G - R 1169 -2735 G - Q 2188 -875 Q - H 654 -1385 Webs Tens.Comp. H - P 1184 -482 I - P 287 -495 J - O 247 -419 O - K 769 -288 K - N 299 -642 N - L 1256 -420 L - M 514 -1357 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 4.26 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.072 I 999 360 VERT(CL):0.143 I 999 240 HORZ(LL):0.018 M - - HORZ(TL):0.036 U - - Creep Factor: 2.0 Max TC CSI:0.713 Max BC CSI:0.428 Max Web CSI:0.947 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T27 Ply: 1 Qty:1 SEQN:196736 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T18 / DrwNo:347.21.0852.51381 SSB /FV 12/13/2021 14'9"12 27'9"12 1'3" 1'3" 2'6"14 1'3"14 7'0"12 4'5"14 12'9"4 5'8"8 14'9"12 2'0"8 20'8"5 5'10"9 26'3"6 5'7"1 31'10"7 5'7"1 37'10"12 6'0"5 42'7"8 4'8"12 1'4"12 1'4"12 2'8"6 1'3"10 6'9"4 4'0"14 12'9"4 6' 20'4"13 7'7"9 26'3"6 5'10"9 32'1"15 5'10"9 37'10"12 5'8"13 42'7"8 4'8"122'1"6 6"3 3'10"66"5'10"16'5"11(a) 8'1"A B C D E F G H I J K L MNOPQRSTUVWXYZ 5 12 3X5(B1) 1.5X4 5X81.5X4 5X6 5X81.5X4 6X8 5X8 5X5 3X5 5X6 3X10 5X5 5X8 3X5 4X4 2X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 668 /-/-/434 /178 /261 R 3113 /-/-/1655 /1291 /- M 1395 /-/-/727 /500 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 R Brg Width = 3.5 Min Req =1.5 M Brg Width = 5.5 Min Req =1.6 Bearings B, R, & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 60 -581 C - D 72 -540 E - F 1110 -432 F - G 960 -333 G - H 230 -627 Chords Tens.Comp. H - I 532 -1449 I - J 532 -1449 J - K 627 -1566 K - L 430 -1166 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Z 452 -261 X - V 697 -343 R - Q 584 -1272 Chords Tens.Comp. Q - P 695 -173 P - O 1588 -523 O - N 1013 -341 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - V 275 -471 E - S 476 -980 F - S 341 -687 S - G 895 -363 S - R 618 -1325 G - R 1169 -2735 G - Q 2188 -875 Q - H 654 -1385 Webs Tens.Comp. H - P 1184 -482 I - P 287 -495 J - O 247 -419 O - K 769 -288 K - N 299 -642 N - L 1256 -420 L - M 514 -1357 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 4.26 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.072 I 999 360 VERT(CL):0.143 I 999 240 HORZ(LL):0.018 M - - HORZ(TL):0.036 U - - Creep Factor: 2.0 Max TC CSI:0.713 Max BC CSI:0.428 Max Web CSI:0.947 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T27 Ply: 1 Qty:1 SEQN:196736 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T18 / DrwNo:347.21.0852.51381 SSB /FV 12/13/2021 14'9"12 27'9"12 1'3" 1'3" 2'6"14 1'3"14 7'0"12 4'5"14 12'9"4 5'8"8 14'9"12 2'0"8 20'8"5 5'10"9 26'3"6 5'7"1 31'10"7 5'7"1 37'10"12 6'0"5 42'7"8 4'8"12 1'4"12 1'4"12 2'8"6 1'3"10 6'9"4 4'0"14 12'9"4 6' 20'4"13 7'7"9 26'3"6 5'10"9 32'1"15 5'10"9 37'10"12 5'8"13 42'7"8 4'8"122'1"6 6"3 3'10"66"5'10"16'5"11(a) 8'1"A B C D E F G H I J K L MNOPQRSTUVWXYZ 5 12 3X5(B1) 1.5X4 5X81.5X4 5X6 5X81.5X4 6X8 5X8 5X5 3X5 5X6 3X10 5X5 5X8 3X5 4X4 2X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; W12 2x4 SP 2250f-1.9E; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 815 /-/-/536 /249 /246 Q 3085 /-/-/1575 /1276 /- M 1272 /-/-/627 /447 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 Q Brg Width = 3.5 Min Req =1.5 M Brg Width = 5.5 Min Req =1.5 Bearings B, Q, & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 201 -936 C - D 206 -896 D - E 88 -687 F - G 676 -256 G - H 672 -254 Chords Tens.Comp. H - I 335 -1080 I - J 335 -1080 J - K 594 -1616 K - L 284 -794 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Z 774 -344 Z - Y 552 -226 X - V 1141 -488 V - U 559 -182 Chords Tens.Comp. Q - P 659 -1484 P - O 1641 -580 O - N 724 -246 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - V 327 -573 E - U 353 -721 F - U 478 -182 F - R 419 -942 R - H 1202 -488 R - Q 642 -1457 H - Q 1243 -2820 H - P 2565 -1025 Webs Tens.Comp. I - P 397 -704 P - J 372 -849 J - O 262 -396 O - K 1047 -380 K - N 373 -817 N - L 1191 -404 L - M 446 -1271 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 4.26 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.069 J 999 360 VERT(CL):0.138 W 999 240 HORZ(LL):0.021 U - - HORZ(TL):0.048 U - - Creep Factor: 2.0 Max TC CSI:0.906 Max BC CSI:0.654 Max Web CSI:0.734 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T28 Ply: 1 Qty:1 SEQN:196732 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T66 / DrwNo:347.21.0852.52149 SSB /FV 12/13/2021 T3 W12 16'9"12 25'9"12 1'3" 1'3" 2'6"14 1'3"14 7'0"12 4'5"14 10'9"4 3'8"8 12'11"4 2'2" 16'9"12 3'10"8 24'5"8 7'7"12 31'11"8 7'6" 39'10"12 7'11"4 42'7"8 2'8"12 1'4"12 1'4"12 2'8"6 1'3"10 6'9"4 4'0"14 10'9"4 4' 12'9"8 2'0"4 24'5"8 11'8" 32'3" 7'9"8 39'10"12 7'7"12 42'7"8 2'8"122'1"6 6"3 3'10"66"5'0"15'7"11(a)(a) 8'1"A B C D E F G H I J K L MNOPQRSTUVWXYZ 5 12 3X5(B1) 1.5X4 5X81.5X4 5X8 1.5X4 6X81.5X4 4X12 5X8 6X6 4X12 5X5 6X8 3X5 4X4 1.5X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; W12 2x4 SP 2250f-1.9E; Bracing (a) 1x4 "T" reinforcement. 80% length of web member. Same species & grade or better, attached with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc. or (1) continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 815 /-/-/536 /249 /246 Q 3085 /-/-/1575 /1276 /- M 1272 /-/-/627 /447 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 Q Brg Width = 3.5 Min Req =1.5 M Brg Width = 5.5 Min Req =1.5 Bearings B, Q, & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 201 -936 C - D 206 -896 D - E 88 -687 F - G 676 -256 G - H 672 -254 Chords Tens.Comp. H - I 335 -1080 I - J 335 -1080 J - K 594 -1616 K - L 284 -794 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Z 774 -344 Z - Y 552 -226 X - V 1141 -488 V - U 559 -182 Chords Tens.Comp. Q - P 659 -1484 P - O 1641 -580 O - N 724 -246 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - V 327 -573 E - U 353 -721 F - U 478 -182 F - R 419 -942 R - H 1202 -488 R - Q 642 -1457 H - Q 1243 -2820 H - P 2565 -1025 Webs Tens.Comp. I - P 397 -704 P - J 372 -849 J - O 262 -396 O - K 1047 -380 K - N 373 -817 N - L 1191 -404 L - M 446 -1271 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 4.26 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.069 J 999 360 VERT(CL):0.138 W 999 240 HORZ(LL):0.021 U - - HORZ(TL):0.048 U - - Creep Factor: 2.0 Max TC CSI:0.906 Max BC CSI:0.654 Max Web CSI:0.734 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T28 Ply: 1 Qty:1 SEQN:196732 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T66 / DrwNo:347.21.0852.52149 SSB /FV 12/13/2021 T3 W12 16'9"12 25'9"12 1'3" 1'3" 2'6"14 1'3"14 7'0"12 4'5"14 10'9"4 3'8"8 12'11"4 2'2" 16'9"12 3'10"8 24'5"8 7'7"12 31'11"8 7'6" 39'10"12 7'11"4 42'7"8 2'8"12 1'4"12 1'4"12 2'8"6 1'3"10 6'9"4 4'0"14 10'9"4 4' 12'9"8 2'0"4 24'5"8 11'8" 32'3" 7'9"8 39'10"12 7'7"12 42'7"8 2'8"122'1"6 6"3 3'10"66"5'0"15'7"11(a)(a) 8'1"A B C D E F G H I J K L MNOPQRSTUVWXYZ 5 12 3X5(B1) 1.5X4 5X81.5X4 5X8 1.5X4 6X81.5X4 4X12 5X8 6X6 4X12 5X5 6X8 3X5 4X4 1.5X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 861 /-/-/558 /282 /263 O 2634 /-/-/1317 /1091 /- L 885 /-/-/382 /330 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 O Brg Width = 3.5 Min Req =2.7 L Brg Width = 3.5 Min Req =1.5 Bearings B, O, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 282 -1045 C - D 288 -1006 D - E 181 -806 E - F 117 -457 F - G 520 -227 Chords Tens.Comp. G - H 515 -225 H - I 256 -655 I - J 256 -655 J - K 339 -946 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - X 873 -435 X - W 611 -277 V - T 1277 -609 Chords Tens.Comp. T - S 669 -265 O - N 585 -1339 N - M 979 -359 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - T 346 -601 E - S 271 -534 F - S 489 -191 F - P 432 -967 G - P 212 -395 P - O 615 -1399 P - H 1221 -519 Webs Tens.Comp. O - H 1024 -2265 H - N 1894 -768 I - N 317 -561 N - J 270 -608 J - M 262 -441 M - K 1091 -390 K - L 350 -831 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.57 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.074 U 999 360 VERT(CL):0.152 U 999 240 HORZ(LL):0.025 P - - HORZ(TL):0.054 R - - Creep Factor: 2.0 Max TC CSI:0.794 Max BC CSI:0.500 Max Web CSI:0.703 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T29 Ply: 1 Qty:1 SEQN:196720 /HIPM FROM: Cust: R 761 JRef:1Xbb7610005 T38 / DrwNo:347.21.0852.52086 SSB /FV 12/13/2021 16'9"12 18'10"4 1'3" 1'3" 2'6"14 1'3"14 7'0"12 4'5"14 8'9"4 1'8"8 12'11"4 4'2" 16'9"12 3'10"8 23'0"9 6'2"13 29'1"11 6'1"1 35'8" 6'6"5 1'4"12 1'4"12 2'8"6 1'3"10 6'9"4 4'0"14 8'9"4 2' 12'9"8 4'0"4 16'8" 3'10"8 23'0"9 6'4"9 29'5"3 6'4"9 35'8" 6'2"132'1"6 6"3 4'2"16"4'9"118'1"A B C D E F G H I J K LMNOPQRSTUVWX 5 12 3X4(B1) 1.5X4 5X81.5X4 5X8 1.5X4 6X81.5X4 4X4 5X8 5X5 5X8 5X5 4X4 1.5X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 861 /-/-/558 /282 /263 O 2634 /-/-/1317 /1091 /- L 885 /-/-/382 /330 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 O Brg Width = 3.5 Min Req =2.7 L Brg Width = 3.5 Min Req =1.5 Bearings B, O, & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 282 -1045 C - D 288 -1006 D - E 181 -806 E - F 117 -457 F - G 520 -227 Chords Tens.Comp. G - H 515 -225 H - I 256 -655 I - J 256 -655 J - K 339 -946 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - X 873 -435 X - W 611 -277 V - T 1277 -609 Chords Tens.Comp. T - S 669 -265 O - N 585 -1339 N - M 979 -359 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. D - T 346 -601 E - S 271 -534 F - S 489 -191 F - P 432 -967 G - P 212 -395 P - O 615 -1399 P - H 1221 -519 Webs Tens.Comp. O - H 1024 -2265 H - N 1894 -768 I - N 317 -561 N - J 270 -608 J - M 262 -441 M - K 1091 -390 K - L 350 -831 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.57 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.074 U 999 360 VERT(CL):0.152 U 999 240 HORZ(LL):0.025 P - - HORZ(TL):0.054 R - - Creep Factor: 2.0 Max TC CSI:0.794 Max BC CSI:0.500 Max Web CSI:0.703 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T29 Ply: 1 Qty:1 SEQN:196720 /HIPM FROM: Cust: R 761 JRef:1Xbb7610005 T38 / DrwNo:347.21.0852.52086 SSB /FV 12/13/2021 16'9"12 18'10"4 1'3" 1'3" 2'6"14 1'3"14 7'0"12 4'5"14 8'9"4 1'8"8 12'11"4 4'2" 16'9"12 3'10"8 23'0"9 6'2"13 29'1"11 6'1"1 35'8" 6'6"5 1'4"12 1'4"12 2'8"6 1'3"10 6'9"4 4'0"14 8'9"4 2' 12'9"8 4'0"4 16'8" 3'10"8 23'0"9 6'4"9 29'5"3 6'4"9 35'8" 6'2"132'1"6 6"3 4'2"16"4'9"118'1"A B C D E F G H I J K LMNOPQRSTUVWX 5 12 3X4(B1) 1.5X4 5X81.5X4 5X8 1.5X4 6X81.5X4 4X4 5X8 5X5 5X8 5X5 4X4 1.5X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; W3 2x4 SP 2250f-1.9E; W10 2x6 SP #2; Nailnote Nail Schedule:0.128"x3", min. nails Top Chord: 1 Row @ 8.75" o.c. Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at -2.11 to 93 plf at 6.77 TC: From 46 plf at 6.77 to 46 plf at 35.67 BC: From 4 plf at -2.11 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 6.80 BC: From 10 plf at 6.80 to 10 plf at 35.67 TC: 647 lb Conc. Load at 6.80 TC: 280 lb Conc. Load at 7.83, 9.83,11.83 TC: 264 lb Conc. Load at 13.83,15.83,17.83,19.83 21.83,23.83,25.83,27.83,29.83,31.83,33.83 BC: 419 lb Conc. Load at 6.80 BC: 94 lb Conc. Load at 7.83, 9.83,11.83 BC: 127 lb Conc. Load at 13.83,15.83,17.83,19.83 21.83,23.83,25.83,27.83,29.83,31.83,33.83 Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1620 /-/-/-/678 /- N 5791 /-/1 /-/2432 /0 K 1742 /-/-/-/715 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 N Brg Width = 3.5 Min Req =3.0 K Brg Width = 3.5 Min Req =1.5 Bearings B, N, & K are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 516 -1306 C - D 508 -1294 D - E 627 -1547 Chords Tens.Comp. G - H 278 -761 H - I 278 -761 I - J 511 -1268 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 1140 -446 V - U 817 -329 T - R 1656 -655 Chords Tens.Comp. R - O 1424 -575 N - M 1165 -2848 M - L 1301 -537 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - O 595 -1521 F - O 286 -474 O - N 674 -1598 O - G 1874 -812 N - G 1137 -2442 Webs Tens.Comp. G - M 2292 -956 H - M 347 -540 M - I 289 -672 L - J 1383 -556 J - K 366 -801 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.57 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.095 S 999 360 VERT(CL):0.177 S 999 240 HORZ(LL):0.037 O - - HORZ(TL):0.069 Q - - Creep Factor: 2.0 Max TC CSI:0.855 Max BC CSI:0.893 Max Web CSI:0.536 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T30 Ply: 2 Qty:1 SEQN:196716 /HIPM FROM: Cust: R 761 JRef:1Xbb7610005 T58 / DrwNo:347.21.0852.52460 SSB /FV 12/13/2021 2 Complete Trusses Required W3 W10 16'9"12 18'10"4 1'3" 1'3" 2'6"14 1'3"14 6'9"4 4'2"6 12'11"4 6'2" 16'9"12 3'10"8 23'1"4 6'3"8 29'2" 6'0"12 35'8" 6'6" 1'4"12 1'4"12 2'8"6 1'3"10 6'9"4 4'0"14 12'9"8 6'0"4 16'7" 3'9"8 23'1"4 6'6"4 29'5"8 6'4"4 35'8" 6'2"82'1"6 6"3 3'4"16"3'11"118'1"A B C D E F G H I J KLMNOPQRSTUV 5 12 3X4(B1) 1.5X4 5X82X4 5X8 1.5X4 6X81.5X4 4X6 5X12 5X5 4X12 5X5 4X4 1.5X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; W3 2x4 SP 2250f-1.9E; W10 2x6 SP #2; Nailnote Nail Schedule:0.128"x3", min. nails Top Chord: 1 Row @ 8.75" o.c. Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at -2.11 to 93 plf at 6.77 TC: From 46 plf at 6.77 to 46 plf at 35.67 BC: From 4 plf at -2.11 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 6.80 BC: From 10 plf at 6.80 to 10 plf at 35.67 TC: 647 lb Conc. Load at 6.80 TC: 280 lb Conc. Load at 7.83, 9.83,11.83 TC: 264 lb Conc. Load at 13.83,15.83,17.83,19.83 21.83,23.83,25.83,27.83,29.83,31.83,33.83 BC: 419 lb Conc. Load at 6.80 BC: 94 lb Conc. Load at 7.83, 9.83,11.83 BC: 127 lb Conc. Load at 13.83,15.83,17.83,19.83 21.83,23.83,25.83,27.83,29.83,31.83,33.83 Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1620 /-/-/-/678 /- N 5791 /-/1 /-/2432 /0 K 1742 /-/-/-/715 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 N Brg Width = 3.5 Min Req =3.0 K Brg Width = 3.5 Min Req =1.5 Bearings B, N, & K are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 516 -1306 C - D 508 -1294 D - E 627 -1547 Chords Tens.Comp. G - H 278 -761 H - I 278 -761 I - J 511 -1268 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 1140 -446 V - U 817 -329 T - R 1656 -655 Chords Tens.Comp. R - O 1424 -575 N - M 1165 -2848 M - L 1301 -537 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. E - O 595 -1521 F - O 286 -474 O - N 674 -1598 O - G 1874 -812 N - G 1137 -2442 Webs Tens.Comp. G - M 2292 -956 H - M 347 -540 M - I 289 -672 L - J 1383 -556 J - K 366 -801 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.57 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.095 S 999 360 VERT(CL):0.177 S 999 240 HORZ(LL):0.037 O - - HORZ(TL):0.069 Q - - Creep Factor: 2.0 Max TC CSI:0.855 Max BC CSI:0.893 Max Web CSI:0.536 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T30 Ply: 2 Qty:1 SEQN:196716 /HIPM FROM: Cust: R 761 JRef:1Xbb7610005 T58 / DrwNo:347.21.0852.52460 SSB /FV 12/13/2021 2 Complete Trusses Required W3 W10 16'9"12 18'10"4 1'3" 1'3" 2'6"14 1'3"14 6'9"4 4'2"6 12'11"4 6'2" 16'9"12 3'10"8 23'1"4 6'3"8 29'2" 6'0"12 35'8" 6'6" 1'4"12 1'4"12 2'8"6 1'3"10 6'9"4 4'0"14 12'9"8 6'0"4 16'7" 3'9"8 23'1"4 6'6"4 29'5"8 6'4"4 35'8" 6'2"82'1"6 6"3 3'4"16"3'11"118'1"A B C D E F G H I J KLMNOPQRSTUV 5 12 3X4(B1) 1.5X4 5X82X4 5X8 1.5X4 6X81.5X4 4X6 5X12 5X5 4X12 5X5 4X4 1.5X6 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Lt Slider: 2x4 SP #2; block length = 2.715' Rt Bearing Leg: 2x6 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 754 /-/-/624 /299 /264 E 524 /-/-/478 /232 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 E Brg Width = 3.6 Min Req =1.5 Bearings B & E are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 431 -1183 Chords Tens.Comp. C - D 433 -1089 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 1016 -503 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. F - D 990 -469 Webs Tens.Comp. D - E 881 -1132 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.038 C 999 360 VERT(CL):0.069 C 999 240 HORZ(LL):0.012 C - - HORZ(TL):0.021 C - - Creep Factor: 2.0 Max TC CSI:0.439 Max BC CSI:0.393 Max Web CSI:0.223 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T31 Ply: 1 Qty:5 SEQN:196821 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T20 / DrwNo:347.21.0852.51647 SSB /FV 12/13/2021 9'7"9 4'6"4 4'6"4 9'2"1 4'7"12 9'7"9 5"8 7"10 7"10 4'8" 4'0"6 9'2"1 4'6" 9'7"9 5"8 2'1"6 6"3 2'2'6"51'9"54'6"55'1"158'1" 10'1" A B C D E F 5 12 2.5 124X6(F3) 1.5X4 3X4 4X8 2X6 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Lt Slider: 2x4 SP #2; block length = 2.715' Rt Bearing Leg: 2x6 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 754 /-/-/624 /299 /264 E 524 /-/-/478 /232 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 E Brg Width = 3.6 Min Req =1.5 Bearings B & E are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 431 -1183 Chords Tens.Comp. C - D 433 -1089 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 1016 -503 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. F - D 990 -469 Webs Tens.Comp. D - E 881 -1132 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.038 C 999 360 VERT(CL):0.069 C 999 240 HORZ(LL):0.012 C - - HORZ(TL):0.021 C - - Creep Factor: 2.0 Max TC CSI:0.439 Max BC CSI:0.393 Max Web CSI:0.223 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T31 Ply: 1 Qty:5 SEQN:196821 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T20 / DrwNo:347.21.0852.51647 SSB /FV 12/13/2021 9'7"9 4'6"4 4'6"4 9'2"1 4'7"12 9'7"9 5"8 7"10 7"10 4'8" 4'0"6 9'2"1 4'6" 9'7"9 5"8 2'1"6 6"3 2'2'6"51'9"54'6"55'1"158'1" 10'1" A B C D E F 5 12 2.5 124X6(F3) 1.5X4 3X4 4X8 2X6 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Lt Slider: 2x4 SP #2; block length = 2.715' Rt Bearing Leg: 2x6 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 647 /-/-/529 /261 /219 E 405 /-/-/366 /176 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 E Brg Width = 3.6 Min Req =1.5 Bearings B & E are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 245 -741 Chords Tens.Comp. C - D 244 -635 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 605 -297 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - D 642 -295 Webs Tens.Comp. D - E 265 -482 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.013 C 999 360 VERT(CL):0.024 C 999 240 HORZ(LL):-0.005 D - - HORZ(TL):0.009 D - - Creep Factor: 2.0 Max TC CSI:0.439 Max BC CSI:0.164 Max Web CSI:0.145 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T32 Ply: 1 Qty:6 SEQN:196826 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T22 / DrwNo:347.21.0852.51632 SSB /FV 12/13/2021 7'7"9 4'6"4 4'6"4 7'2"1 2'7"12 7'7"9 5"8 7"10 7"10 4'8" 4'0"6 7'2"1 2'6" 7'7"9 5"8 2'1"6 7"11 6"3 2'1'8"51'4"53'8"54'3"158'1" 10'1" A B C D EF G 5 12 2.5 124X6(F3) 1.5X4 3X4 4X7 2X6 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Lt Slider: 2x4 SP #2; block length = 2.715' Rt Bearing Leg: 2x6 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 647 /-/-/529 /261 /219 E 405 /-/-/366 /176 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 E Brg Width = 3.6 Min Req =1.5 Bearings B & E are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 245 -741 Chords Tens.Comp. C - D 244 -635 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 605 -297 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - D 642 -295 Webs Tens.Comp. D - E 265 -482 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.013 C 999 360 VERT(CL):0.024 C 999 240 HORZ(LL):-0.005 D - - HORZ(TL):0.009 D - - Creep Factor: 2.0 Max TC CSI:0.439 Max BC CSI:0.164 Max Web CSI:0.145 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T32 Ply: 1 Qty:6 SEQN:196826 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T22 / DrwNo:347.21.0852.51632 SSB /FV 12/13/2021 7'7"9 4'6"4 4'6"4 7'2"1 2'7"12 7'7"9 5"8 7"10 7"10 4'8" 4'0"6 7'2"1 2'6" 7'7"9 5"8 2'1"6 7"11 6"3 2'1'8"51'4"53'8"54'3"158'1" 10'1" A B C D EF G 5 12 2.5 124X6(F3) 1.5X4 3X4 4X7 2X6 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at -2.11 to 93 plf at 3.44 TC: From 46 plf at 3.44 to 46 plf at 17.23 TC: From 93 plf at 17.23 to 93 plf at 22.78 BC: From 4 plf at -2.11 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 3.47 BC: From 10 plf at 3.47 to 10 plf at 17.20 BC: From 20 plf at 17.20 to 20 plf at 20.67 BC: From 4 plf at 20.67 to 4 plf at 22.78 TC: 228 lb Conc. Load at 3.47,17.20 TC: 97 lb Conc. Load at 5.17, 7.17, 9.17,11.17 13.17,15.17 BC: 88 lb Conc. Load at 3.47,17.20 BC: 58 lb Conc. Load at 5.17, 7.17, 9.17,11.17 13.17,15.17 Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1763 /-/-/-/771 /- O 1748 /-/-/-/763 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 O Brg Width = 7.6 Min Req =1.5 Bearings B & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1230 -2856 C - D 1753 -4043 D - E 1956 -4495 Chords Tens.Comp. E - F 1956 -4495 F - G 1741 -4018 G - H 1213 -2821 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 2524 -1080 N - M 2522 -1070 M - L 4140 -1809 Chords Tens.Comp. L - K 4117 -1798 K - J 2490 -1054 J - H 2492 -1064 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 1692 -760 M - D 324 -567 D - L 399 -165 Webs Tens.Comp. L - F 425 -178 F - K 326 -575 K - G 1700 -764 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.258 E 949 360 VERT(CL):0.471 E 521 240 HORZ(LL):0.048 C - - HORZ(TL):0.087 C - - Creep Factor: 2.0 Max TC CSI:0.881 Max BC CSI:0.594 Max Web CSI:0.384 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T33 Ply: 1 Qty:1 SEQN:196871 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T47 / DrwNo:347.21.0852.51382 SSB /FV 12/13/2021 T2 20'8" 3'5"4 3'5"4 7'1"4 3'8" 10'4" 3'2"12 13'6"12 3'2"12 17'2"12 3'8" 20'8" 3'5"4 3'7" 3'7" 6'9"12 3'2"12 10'4" 3'6"4 13'10"4 3'6"4 17'1" 3'2"12 20'8" 3'7"2'1"6 2'1"6 6"31'11"62'7"8'1"A B C D E F G H IJKLMNO 5 12 4X6(B2) 5X8 1.5X4 4X5 3X4 1.5X4 H0510 3X4 4X5 1.5X4 5X8 4X6(B2) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Webs: 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at -2.11 to 93 plf at 3.44 TC: From 46 plf at 3.44 to 46 plf at 17.23 TC: From 93 plf at 17.23 to 93 plf at 22.78 BC: From 4 plf at -2.11 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 3.47 BC: From 10 plf at 3.47 to 10 plf at 17.20 BC: From 20 plf at 17.20 to 20 plf at 20.67 BC: From 4 plf at 20.67 to 4 plf at 22.78 TC: 228 lb Conc. Load at 3.47,17.20 TC: 97 lb Conc. Load at 5.17, 7.17, 9.17,11.17 13.17,15.17 BC: 88 lb Conc. Load at 3.47,17.20 BC: 58 lb Conc. Load at 5.17, 7.17, 9.17,11.17 13.17,15.17 Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1763 /-/-/-/771 /- O 1748 /-/-/-/763 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 O Brg Width = 7.6 Min Req =1.5 Bearings B & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1230 -2856 C - D 1753 -4043 D - E 1956 -4495 Chords Tens.Comp. E - F 1956 -4495 F - G 1741 -4018 G - H 1213 -2821 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 2524 -1080 N - M 2522 -1070 M - L 4140 -1809 Chords Tens.Comp. L - K 4117 -1798 K - J 2490 -1054 J - H 2492 -1064 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 1692 -760 M - D 324 -567 D - L 399 -165 Webs Tens.Comp. L - F 425 -178 F - K 326 -575 K - G 1700 -764 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.258 E 949 360 VERT(CL):0.471 E 521 240 HORZ(LL):0.048 C - - HORZ(TL):0.087 C - - Creep Factor: 2.0 Max TC CSI:0.881 Max BC CSI:0.594 Max Web CSI:0.384 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T33 Ply: 1 Qty:1 SEQN:196871 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T47 / DrwNo:347.21.0852.51382 SSB /FV 12/13/2021 T2 20'8" 3'5"4 3'5"4 7'1"4 3'8" 10'4" 3'2"12 13'6"12 3'2"12 17'2"12 3'8" 20'8" 3'5"4 3'7" 3'7" 6'9"12 3'2"12 10'4" 3'6"4 13'10"4 3'6"4 17'1" 3'2"12 20'8" 3'7"2'1"6 2'1"6 6"31'11"62'7"8'1"A B C D E F G H IJKLMNO 5 12 4X6(B2) 5X8 1.5X4 4X5 3X4 1.5X4 H0510 3X4 4X5 1.5X4 5X8 4X6(B2) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1362 /-/-/781 /539 /158 K 1362 /-/-/781 /539 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 K Brg Width = 7.6 Min Req =1.6 Bearings B & F are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 777 -2018 C - D 1001 -2368 Chords Tens.Comp. D - E 1001 -2368 E - F 777 -2018 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - J 1753 -589 J - I 1755 -585 Chords Tens.Comp. I - H 1755 -585 H - F 1753 -589 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - I 687 -336 D - I 285 -490 Webs Tens.Comp. I - E 687 -336 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.139 D 999 360 VERT(CL):0.254 D 964 240 HORZ(LL):0.045 F - - HORZ(TL):0.082 F - - Creep Factor: 2.0 Max TC CSI:0.839 Max BC CSI:0.958 Max Web CSI:0.161 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T34 Ply: 1 Qty:1 SEQN:196875 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T33 / DrwNo:347.21.0852.52085 SSB /FV 12/13/2021 20'8" 5'5"4 5'5"4 10'4" 4'10"12 15'2"12 4'10"12 20'8" 5'5"4 5'7" 5'7" 10'4" 4'9" 15'1" 4'9" 20'8" 5'7"2'1"6 2'1"6 6"32'9"63'5"8'1"A B C D E F GHIJK 5 12 4X4(B1) 4X7 1.5X4 1.5X4 5X8 1.5X4 4X7 4X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1362 /-/-/781 /539 /158 K 1362 /-/-/781 /539 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 K Brg Width = 7.6 Min Req =1.6 Bearings B & F are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 777 -2018 C - D 1001 -2368 Chords Tens.Comp. D - E 1001 -2368 E - F 777 -2018 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - J 1753 -589 J - I 1755 -585 Chords Tens.Comp. I - H 1755 -585 H - F 1753 -589 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - I 687 -336 D - I 285 -490 Webs Tens.Comp. I - E 687 -336 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.139 D 999 360 VERT(CL):0.254 D 964 240 HORZ(LL):0.045 F - - HORZ(TL):0.082 F - - Creep Factor: 2.0 Max TC CSI:0.839 Max BC CSI:0.958 Max Web CSI:0.161 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T34 Ply: 1 Qty:1 SEQN:196875 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T33 / DrwNo:347.21.0852.52085 SSB /FV 12/13/2021 20'8" 5'5"4 5'5"4 10'4" 4'10"12 15'2"12 4'10"12 20'8" 5'5"4 5'7" 5'7" 10'4" 4'9" 15'1" 4'9" 20'8" 5'7"2'1"6 2'1"6 6"32'9"63'5"8'1"A B C D E F GHIJK 5 12 4X4(B1) 4X7 1.5X4 1.5X4 5X8 1.5X4 4X7 4X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1362 /-/-/789 /538 /190 J 1362 /-/-/789 /538 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 J Brg Width = 7.6 Min Req =1.6 Bearings B & E are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 733 -1924 C - D 755 -1667 Chords Tens.Comp. D - E 733 -1924 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 1646 -524 I - H 1650 -521 Chords Tens.Comp. H - G 1650 -521 G - E 1646 -524 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.090 H 999 360 VERT(CL):0.165 H 999 240 HORZ(LL):0.034 E - - HORZ(TL):0.063 E - - Creep Factor: 2.0 Max TC CSI:0.931 Max BC CSI:0.644 Max Web CSI:0.057 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T35 Ply: 1 Qty:1 SEQN:196879 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T34 / DrwNo:347.21.0852.52664 SSB /FV 12/13/2021 20'8" 7'5"4 7'5"4 13'2"12 5'9"8 20'8" 7'5"4 7'7" 7'7" 10'4" 2'9" 13'1" 2'9" 20'8" 7'7"2'1"6 2'1"6 6"33'7"64'3"8'1"A B C D E FGHIJ 5 12 3X5(B1) 5X8 1.5X4 5X5 1.5X4 5X8 3X5(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1362 /-/-/789 /538 /190 J 1362 /-/-/789 /538 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 J Brg Width = 7.6 Min Req =1.6 Bearings B & E are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 733 -1924 C - D 755 -1667 Chords Tens.Comp. D - E 733 -1924 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 1646 -524 I - H 1650 -521 Chords Tens.Comp. H - G 1650 -521 G - E 1646 -524 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.090 H 999 360 VERT(CL):0.165 H 999 240 HORZ(LL):0.034 E - - HORZ(TL):0.063 E - - Creep Factor: 2.0 Max TC CSI:0.931 Max BC CSI:0.644 Max Web CSI:0.057 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T35 Ply: 1 Qty:1 SEQN:196879 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T34 / DrwNo:347.21.0852.52664 SSB /FV 12/13/2021 20'8" 7'5"4 7'5"4 13'2"12 5'9"8 20'8" 7'5"4 7'7" 7'7" 10'4" 2'9" 13'1" 2'9" 20'8" 7'7"2'1"6 2'1"6 6"33'7"64'3"8'1"A B C D E FGHIJ 5 12 3X5(B1) 5X8 1.5X4 5X5 1.5X4 5X8 3X5(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1362 /-/-/788 /536 /222 L 1362 /-/-/788 /536 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 L Brg Width = 7.6 Min Req =1.6 Bearings B & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 774 -2022 C - D 646 -1520 D - E 660 -1394 Chords Tens.Comp. E - F 646 -1520 F - G 774 -2022 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1760 -590 K - J 1759 -593 Chords Tens.Comp. J - I 1759 -593 I - G 1760 -590 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 258 -470 Webs Tens.Comp. J - F 258 -470 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.105 J 999 360 VERT(CL):0.192 J 999 240 HORZ(LL):0.045 G - - HORZ(TL):0.083 G - - Creep Factor: 2.0 Max TC CSI:0.826 Max BC CSI:0.837 Max Web CSI:0.248 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T36 Ply: 1 Qty:1 SEQN:196902 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T39 / DrwNo:347.21.0852.52834 SSB /FV 12/13/2021 20'8" 5'3"8 5'3"8 9'5"4 4'1"12 11'2"12 1'9"8 15'4"8 4'1"12 20'8" 5'3"8 5'1"12 5'1"12 10'4" 5'2"4 15'6"4 5'2"4 20'8" 5'1"122'1"6 2'1"6 6"34'5"65'1"8'1"A B C D E F G HIJKL 5 12 4X4(B1)1.5X4 3X4 4X4 5X10 4X4 3X4 1.5X4 4X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Purlins In lieu of structural panels use purlins to brace all flat TC @ 24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1362 /-/-/788 /536 /222 L 1362 /-/-/788 /536 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.6 L Brg Width = 7.6 Min Req =1.6 Bearings B & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 774 -2022 C - D 646 -1520 D - E 660 -1394 Chords Tens.Comp. E - F 646 -1520 F - G 774 -2022 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - K 1760 -590 K - J 1759 -593 Chords Tens.Comp. J - I 1759 -593 I - G 1760 -590 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - J 258 -470 Webs Tens.Comp. J - F 258 -470 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.105 J 999 360 VERT(CL):0.192 J 999 240 HORZ(LL):0.045 G - - HORZ(TL):0.083 G - - Creep Factor: 2.0 Max TC CSI:0.826 Max BC CSI:0.837 Max Web CSI:0.248 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T36 Ply: 1 Qty:1 SEQN:196902 /HIPS FROM: Cust: R 761 JRef:1Xbb7610005 T39 / DrwNo:347.21.0852.52834 SSB /FV 12/13/2021 20'8" 5'3"8 5'3"8 9'5"4 4'1"12 11'2"12 1'9"8 15'4"8 4'1"12 20'8" 5'3"8 5'1"12 5'1"12 10'4" 5'2"4 15'6"4 5'2"4 20'8" 5'1"122'1"6 2'1"6 6"34'5"65'1"8'1"A B C D E F G HIJKL 5 12 4X4(B1)1.5X4 3X4 4X4 5X10 4X4 3X4 1.5X4 4X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2700f-2.2E; T2, T4 2x4 SP 2250f-1.9E; Bot chord: 2x6 SP 2400f-2.0E; B2 2x4 SP #2; Webs: 2x4 SP #2; Plating Notes (**) 2 plate(s) require special positioning. Refer to scaled plate plot details for special positioning requirements. Loading Attic room loading from 5-3-8 to 15-4-8: Live Load: 30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0 PSF Purlins Collar-tie braced with continuous lateral bracing at 24" oc. or rigid ceiling. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1715 /-/-/786 /536 /237 Q 1715 /-/-/786 /536 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 Q Brg Width = 7.6 Min Req =1.5 Bearings B & J are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 2683 -418 D - E 1963 -3162 G - H 3006 -481 Chords Tens.Comp. B - C 734 -2584 H - I 2683 -418 I - J 734 -2584 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 2315 -577 P - O 2357 -582 O - N 2104 -443 Chords Tens.Comp. N - M 2104 -443 M - L 2357 -582 L - J 2315 -577 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. P - C 75 -621 C - O 195 -397 O - D 1008 -23 E - G 736 -2461 Webs Tens.Comp. H - M 1008 -23 M - I 216 -397 I - L 77 -621 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.188 D 999 360 VERT(CL):0.328 D 745 240 HORZ(LL):0.068 D - - HORZ(TL):0.123 D - - Creep Factor: 2.0 Max TC CSI:0.574 Max BC CSI:0.478 Max Web CSI:0.260 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T37 Ply: 1 Qty:6 SEQN:196899 /COMN FROM: Cust: R 761 JRef:1Xbb7610005 T40 / DrwNo:347.21.0852.52131 SSB /FV 12/13/2021 T2 T4B2 10'1"3'4"420'8" 8'8"1 8'8"1 10'4" 1'7"15 11'11"15 1'7"15 20'8" 8'8"1 2'9"12 2'9"12 10'4" 7'6"4 17'10"4 7'6"4 20'8" 2'9"122'1"6 6"33'9"121'7"94'9"145'5"88'1"A B C D E F G H I J KLMNOPQ 5 12 3X6(A1) 1.5X4 10X10 3X3 3X3 4X6 1.5X4(**) 3X4 3X12 3X4 H0510 3X12 3X4 1.5X4(**) 4X6 3X3 3X3 10X10 1.5X4 3X6(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2700f-2.2E; T2, T4 2x4 SP 2250f-1.9E; Bot chord: 2x6 SP 2400f-2.0E; B2 2x4 SP #2; Webs: 2x4 SP #2; Plating Notes (**) 2 plate(s) require special positioning. Refer to scaled plate plot details for special positioning requirements. Loading Attic room loading from 5-3-8 to 15-4-8: Live Load: 30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0 PSF Purlins Collar-tie braced with continuous lateral bracing at 24" oc. or rigid ceiling. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 1715 /-/-/786 /536 /237 Q 1715 /-/-/786 /536 /- Wind reactions based on MWFRS B Brg Width = 7.6 Min Req =1.5 Q Brg Width = 7.6 Min Req =1.5 Bearings B & J are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 2683 -418 D - E 1963 -3162 G - H 3006 -481 Chords Tens.Comp. B - C 734 -2584 H - I 2683 -418 I - J 734 -2584 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 2315 -577 P - O 2357 -582 O - N 2104 -443 Chords Tens.Comp. N - M 2104 -443 M - L 2357 -582 L - J 2315 -577 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. P - C 75 -621 C - O 195 -397 O - D 1008 -23 E - G 736 -2461 Webs Tens.Comp. H - M 1008 -23 M - I 216 -397 I - L 77 -621 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.188 D 999 360 VERT(CL):0.328 D 745 240 HORZ(LL):0.068 D - - HORZ(TL):0.123 D - - Creep Factor: 2.0 Max TC CSI:0.574 Max BC CSI:0.478 Max Web CSI:0.260 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T37 Ply: 1 Qty:6 SEQN:196899 /COMN FROM: Cust: R 761 JRef:1Xbb7610005 T40 / DrwNo:347.21.0852.52131 SSB /FV 12/13/2021 T2 T4B2 10'1"3'4"420'8" 8'8"1 8'8"1 10'4" 1'7"15 11'11"15 1'7"15 20'8" 8'8"1 2'9"12 2'9"12 10'4" 7'6"4 17'10"4 7'6"4 20'8" 2'9"122'1"6 6"33'9"121'7"94'9"145'5"88'1"A B C D E F G H I J KLMNOPQ 5 12 3X6(A1) 1.5X4 10X10 3X3 3X3 4X6 1.5X4(**) 3X4 3X12 3X4 H0510 3X12 3X4 1.5X4(**) 4X6 3X3 3X3 10X10 1.5X4 3X6(A1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2700f-2.2E; T2,T4 2x4 SP #2; Bot chord: 2x6 SP 2400f-2.0E; B2 2x4 SP #2; Webs: 2x4 SP #2; Loading Attic room loading from 4-11-14 to 15-0-14: Live Load: 30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0 PSF Purlins Collar-tie braced with continuous lateral bracing at 24" oc. or rigid ceiling. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 1492 /-/-/593 /437 /205 P 1704 /-/-/780 /535 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req =1.5 P Brg Width = 7.6 Min Req =1.5 Bearings A & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 913 -2364 A - B 734 -2497 B - C 669 -2564 D - E 1443 -232 Chords Tens.Comp. E - F 1445 -232 F - G 902 -2363 G - H 670 -2575 H - I 752 -2675 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - O 2256 -584 O - N 2298 -589 N - M 2078 -435 Chords Tens.Comp. M - L 2078 -435 L - K 2465 -604 K - I 2432 -600 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. O - B 81 -657 B - N 213 -397 N - C 921 -13 D - F 984 -3642 Webs Tens.Comp. G - L 961 -18 L - H 242 -559 H - K 86 -550 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.435 G 553 360 VERT(CL):0.713 G 337 240 HORZ(LL):-0.180 G - - HORZ(TL):0.298 G - - Creep Factor: 2.0 Max TC CSI:0.995 Max BC CSI:0.614 Max Web CSI:0.243 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T38 Ply: 1 Qty:5 SEQN:196891 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T44 / DrwNo:347.21.0852.52241 SSB /FV 12/13/2021 T2 T4 B2 10'1"1'7"94'1"10 4'1"103'4"420'4"6 2'7"14 2'7"14 4'11"14 2'4" 8'4"7 3'4"9 10'0"6 1'7"15 11'8"5 1'7"15 15'0"14 3'4"9 17'4"14 2'4" 20'4"6 2'11"8 2'6"2 2'6"2 4'8"6 2'2"4 10'0"6 5'4" 15'4"6 5'4" 17'6"10 2'2"4 20'4"6 2'9"12 7"11 6"33'9"121'11"64'9"145'5"88'1" A B C D E F G H I JKLMNOP 5 12 4X4(B1) 1.5X4 3X4 4X5 4X4 3X4 4X16 3X4 SS0514 4X16 3X4 4X4 4X5 3X4 1.5X4 3X6(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2700f-2.2E; T2,T4 2x4 SP #2; Bot chord: 2x6 SP 2400f-2.0E; B2 2x4 SP #2; Webs: 2x4 SP #2; Loading Attic room loading from 4-11-14 to 15-0-14: Live Load: 30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0 PSF Purlins Collar-tie braced with continuous lateral bracing at 24" oc. or rigid ceiling. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 1492 /-/-/593 /437 /205 P 1704 /-/-/780 /535 /- Wind reactions based on MWFRS A Brg Width = 3.5 Min Req =1.5 P Brg Width = 7.6 Min Req =1.5 Bearings A & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 913 -2364 A - B 734 -2497 B - C 669 -2564 D - E 1443 -232 Chords Tens.Comp. E - F 1445 -232 F - G 902 -2363 G - H 670 -2575 H - I 752 -2675 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - O 2256 -584 O - N 2298 -589 N - M 2078 -435 Chords Tens.Comp. M - L 2078 -435 L - K 2465 -604 K - I 2432 -600 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. O - B 81 -657 B - N 213 -397 N - C 921 -13 D - F 984 -3642 Webs Tens.Comp. G - L 961 -18 L - H 242 -559 H - K 86 -550 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE, 18SS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.435 G 553 360 VERT(CL):0.713 G 337 240 HORZ(LL):-0.180 G - - HORZ(TL):0.298 G - - Creep Factor: 2.0 Max TC CSI:0.995 Max BC CSI:0.614 Max Web CSI:0.243 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T38 Ply: 1 Qty:5 SEQN:196891 /SPEC FROM: Cust: R 761 JRef:1Xbb7610005 T44 / DrwNo:347.21.0852.52241 SSB /FV 12/13/2021 T2 T4 B2 10'1"1'7"94'1"10 4'1"103'4"420'4"6 2'7"14 2'7"14 4'11"14 2'4" 8'4"7 3'4"9 10'0"6 1'7"15 11'8"5 1'7"15 15'0"14 3'4"9 17'4"14 2'4" 20'4"6 2'11"8 2'6"2 2'6"2 4'8"6 2'2"4 10'0"6 5'4" 15'4"6 5'4" 17'6"10 2'2"4 20'4"6 2'9"12 7"11 6"33'9"121'11"64'9"145'5"88'1" A B C D E F G H I JKLMNOP 5 12 4X4(B1) 1.5X4 3X4 4X5 4X4 3X4 4X16 3X4 SS0514 4X16 3X4 4X4 4X5 3X4 1.5X4 3X6(A1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x6 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D 469 /-/-/308 /228 /278 E 738 /-/-/420 /271 /- Wind reactions based on MWFRS D Brg Width = 3.5 Min Req =1.5 E Brg Width = 7.6 Min Req =1.5 Bearings D & B are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.028 B 999 360 VERT(CL):0.052 B 999 240 HORZ(LL):-0.023 B - - HORZ(TL):0.042 B - - Creep Factor: 2.0 Max TC CSI:0.693 Max BC CSI:0.539 Max Web CSI:0.313 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T39 Ply: 1 Qty:4 SEQN:196888 /MONO FROM: Cust: R 761 JRef:1Xbb7610005 T46 / DrwNo:347.21.0852.52288 SSB /FV 12/13/2021 8'11"8 8'11"8 8'11"8 2'1"64'3"6"3 4'10"108'1" A B CDE 5 12 2X4 1.5X6 2X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x6 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D 469 /-/-/308 /228 /278 E 738 /-/-/420 /271 /- Wind reactions based on MWFRS D Brg Width = 3.5 Min Req =1.5 E Brg Width = 7.6 Min Req =1.5 Bearings D & B are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.028 B 999 360 VERT(CL):0.052 B 999 240 HORZ(LL):-0.023 B - - HORZ(TL):0.042 B - - Creep Factor: 2.0 Max TC CSI:0.693 Max BC CSI:0.539 Max Web CSI:0.313 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:T39 Ply: 1 Qty:4 SEQN:196888 /MONO FROM: Cust: R 761 JRef:1Xbb7610005 T46 / DrwNo:347.21.0852.52288 SSB /FV 12/13/2021 8'11"8 8'11"8 8'11"8 2'1"64'3"6"3 4'10"108'1" A B CDE 5 12 2X4 1.5X6 2X4(A1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D*112 /-/-/42 /23 /5 Wind reactions based on MWFRS D Brg Wid = 46.8 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.19 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.006 A 999 360 VERT(CL):0.011 A 999 240 HORZ(LL):-0.002 A - - HORZ(TL):0.004 A - - Creep Factor: 2.0 Max TC CSI:0.090 Max BC CSI:0.140 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V1 Ply: 1 Qty:1 SEQN:196653 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T62 DrwNo:347.21.0847.05357 SSB /WHK 12/13/2021 3'10"13 1'11"6 1'11"6 3'10"13 1'11"6 3'10"13 3'10"13 0"410"14'7"6 A B C D 5 12 3X4(D1) 3X4 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D*112 /-/-/42 /23 /5 Wind reactions based on MWFRS D Brg Wid = 46.8 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.19 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.006 A 999 360 VERT(CL):0.011 A 999 240 HORZ(LL):-0.002 A - - HORZ(TL):0.004 A - - Creep Factor: 2.0 Max TC CSI:0.090 Max BC CSI:0.140 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V1 Ply: 1 Qty:1 SEQN:196653 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T62 DrwNo:347.21.0847.05357 SSB /WHK 12/13/2021 3'10"13 1'11"6 1'11"6 3'10"13 1'11"6 3'10"13 3'10"13 0"410"14'7"6 A B C D 5 12 3X4(D1) 3X4 3X4(D1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL E*112 /-/-/48 /33 /6 Wind reactions based on MWFRS E Brg Wid = 94.8 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - D 202 -454 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.011 C 999 360 VERT(CL):0.021 C 999 240 HORZ(LL):-0.004 C - - HORZ(TL):0.008 C - - Creep Factor: 2.0 Max TC CSI:0.243 Max BC CSI:0.186 Max Web CSI:0.050 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V2 Ply: 1 Qty:1 SEQN:196654 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T64 DrwNo:347.21.0847.06413 SSB /WHK 12/13/2021 7'10"13 3'11"6 3'11"6 7'10"13 3'11"6 3'11"6 3'11"6 7'10"13 3'11"6 0"41'8"13'9"6 A B C D E 5 12 3X4(D1) 4X4 1.5X4 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL E*112 /-/-/48 /33 /6 Wind reactions based on MWFRS E Brg Wid = 94.8 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - D 202 -454 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.011 C 999 360 VERT(CL):0.021 C 999 240 HORZ(LL):-0.004 C - - HORZ(TL):0.008 C - - Creep Factor: 2.0 Max TC CSI:0.243 Max BC CSI:0.186 Max Web CSI:0.050 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V2 Ply: 1 Qty:1 SEQN:196654 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T64 DrwNo:347.21.0847.06413 SSB /WHK 12/13/2021 7'10"13 3'11"6 3'11"6 7'10"13 3'11"6 3'11"6 3'11"6 7'10"13 3'11"6 0"41'8"13'9"6 A B C D E 5 12 3X4(D1) 4X4 1.5X4 3X4(D1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL E*112 /-/-/50 /37 /7 Wind reactions based on MWFRS E Brg Wid = 142 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 723 -276 Chords Tens.Comp. B - C 723 -276 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - D 324 -593 Chords Tens.Comp. D - C 324 -593 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - D 428 -908 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.043 A 999 360 VERT(CL):0.080 A 999 240 HORZ(LL):-0.013 C - - HORZ(TL):0.025 C - - Creep Factor: 2.0 Max TC CSI:0.677 Max BC CSI:0.434 Max Web CSI:0.116 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V3 Ply: 1 Qty:1 SEQN:196867 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T65 DrwNo:347.21.0847.07543 SSB /WHK 12/13/2021 11'10"13 5'11"6 5'11"6 11'10"13 5'11"6 5'11"6 5'11"6 11'10"13 5'11"6 0"42'6"12'11"6 A B C D E 5 12 3X4(D1) 4X4 5X5 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL E*112 /-/-/50 /37 /7 Wind reactions based on MWFRS E Brg Wid = 142 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 723 -276 Chords Tens.Comp. B - C 723 -276 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - D 324 -593 Chords Tens.Comp. D - C 324 -593 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - D 428 -908 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.043 A 999 360 VERT(CL):0.080 A 999 240 HORZ(LL):-0.013 C - - HORZ(TL):0.025 C - - Creep Factor: 2.0 Max TC CSI:0.677 Max BC CSI:0.434 Max Web CSI:0.116 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V3 Ply: 1 Qty:1 SEQN:196867 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T65 DrwNo:347.21.0847.07543 SSB /WHK 12/13/2021 11'10"13 5'11"6 5'11"6 11'10"13 5'11"6 5'11"6 5'11"6 11'10"13 5'11"6 0"42'6"12'11"6 A B C D E 5 12 3X4(D1) 4X4 5X5 3X4(D1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D*112 /-/-/52 /24 /16 Wind reactions based on MWFRS D Brg Wid = 25.1 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 B 999 360 VERT(CL):0.016 B 999 240 HORZ(LL):0.003 B - - HORZ(TL):0.005 B - - Creep Factor: 2.0 Max TC CSI:0.049 Max BC CSI:0.139 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V4 Ply: 1 Qty:1 SEQN:196864 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T35 DrwNo:347.21.0847.08567 SSB /WHK 12/13/2021 2'1"2 2'1"2 2'1"2 0"4 10"1211'0"11 A B CD 5 12 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D*112 /-/-/52 /24 /16 Wind reactions based on MWFRS D Brg Wid = 25.1 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 B 999 360 VERT(CL):0.016 B 999 240 HORZ(LL):0.003 B - - HORZ(TL):0.005 B - - Creep Factor: 2.0 Max TC CSI:0.049 Max BC CSI:0.139 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V4 Ply: 1 Qty:1 SEQN:196864 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T35 DrwNo:347.21.0847.08567 SSB /WHK 12/13/2021 2'1"2 2'1"2 2'1"2 0"4 10"1211'0"11 A B CD 5 12 3X4(D1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D*112 /-/-/61 /34 /20 Wind reactions based on MWFRS D Brg Wid = 49.1 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.004 A - - HORZ(TL):0.008 A - - Creep Factor: 2.0 Max TC CSI:0.276 Max BC CSI:0.226 Max Web CSI:0.034 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V5 Ply: 1 Qty:1 SEQN:196658 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T61 DrwNo:347.21.0847.09630 SSB /WHK 12/13/2021 4'1"2 4'1"2 4'1"2 0"4 1'8"1210'2"11 A B CD 5 12 3X4(D1) 1.5X4 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D*112 /-/-/61 /34 /20 Wind reactions based on MWFRS D Brg Wid = 49.1 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.004 A - - HORZ(TL):0.008 A - - Creep Factor: 2.0 Max TC CSI:0.276 Max BC CSI:0.226 Max Web CSI:0.034 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V5 Ply: 1 Qty:1 SEQN:196658 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T61 DrwNo:347.21.0847.09630 SSB /WHK 12/13/2021 4'1"2 4'1"2 4'1"2 0"4 1'8"1210'2"11 A B CD 5 12 3X4(D1) 1.5X4 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D*112 /-/-/64 /37 /22 Wind reactions based on MWFRS D Brg Wid = 73.1 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.015 A - - HORZ(TL):0.029 A - - Creep Factor: 2.0 Max TC CSI:0.654 Max BC CSI:0.467 Max Web CSI:0.128 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V6 Ply: 1 Qty:1 SEQN:196659 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T63 DrwNo:347.21.0847.10600 SSB /WHK 12/13/2021 6'1"2 6'1"2 6'1"2 0"4 2'6"129'4"11 A B CD 5 12 3X4(D1) 1.5X4 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS VALTN160118 and VAL180160118 for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D*112 /-/-/64 /37 /22 Wind reactions based on MWFRS D Brg Wid = 73.1 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.015 A - - HORZ(TL):0.029 A - - Creep Factor: 2.0 Max TC CSI:0.654 Max BC CSI:0.467 Max Web CSI:0.128 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:V6 Ply: 1 Qty:1 SEQN:196659 VAL FROM: Cust: R 761 JRef:1Xbb7610005 T63 DrwNo:347.21.0847.10600 SSB /WHK 12/13/2021 6'1"2 6'1"2 6'1"2 0"4 2'6"129'4"11 A B CD 5 12 3X4(D1) 1.5X4 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (3) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 621 /-/-/430 /211 /213 D 127 /-/-/69 /-/- C 264 /-/-/146 /178 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.011 B - - HORZ(TL):0.020 B - - Creep Factor: 2.0 Max TC CSI:0.951 Max BC CSI:0.499 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J1 Ply: 1 Qty:31 SEQN:196650 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T16 DrwNo:347.21.0847.11733 SSB /WHK 12/13/2021 6'9"4 6'9"42'1"6 6"3 3'4"13'11"118'1" 11'1"9 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (3) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 621 /-/-/430 /211 /213 D 127 /-/-/69 /-/- C 264 /-/-/146 /178 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.011 B - - HORZ(TL):0.020 B - - Creep Factor: 2.0 Max TC CSI:0.951 Max BC CSI:0.499 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J1 Ply: 1 Qty:31 SEQN:196650 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T16 DrwNo:347.21.0847.11733 SSB /WHK 12/13/2021 6'9"4 6'9"42'1"6 6"3 3'4"13'11"118'1" 11'1"9 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (3) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 621 /-/-/430 /211 /213 E 94 /-/-/52 /-/- D 280 /-/-/161 /174 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.176 F 454 360 VERT(CL):0.319 F 250 240 HORZ(LL):0.080 C - - HORZ(TL):0.144 C - - Creep Factor: 2.0 Max TC CSI:0.558 Max BC CSI:0.266 Max Web CSI:0.093 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J1T Ply: 1 Qty:4 SEQN:196686 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T37 DrwNo:347.21.0847.12727 SSB /WHK 12/13/2021 2'5"2 2'5"2 6'9"4 4'4"2 2'8"6 2'8"6 6'9"4 4'0"142'1"6 6"3 6"2'10"13'4"13'11"118'1" 8'7" 11'1"9 A B C D E FGH 5 12 3X4(B1)3X3 1.5X4 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (3) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 621 /-/-/430 /211 /213 E 94 /-/-/52 /-/- D 280 /-/-/161 /174 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.176 F 454 360 VERT(CL):0.319 F 250 240 HORZ(LL):0.080 C - - HORZ(TL):0.144 C - - Creep Factor: 2.0 Max TC CSI:0.558 Max BC CSI:0.266 Max Web CSI:0.093 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J1T Ply: 1 Qty:4 SEQN:196686 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T37 DrwNo:347.21.0847.12727 SSB /WHK 12/13/2021 2'5"2 2'5"2 6'9"4 4'4"2 2'8"6 2'8"6 6'9"4 4'0"142'1"6 6"3 6"2'10"13'4"13'11"118'1" 8'7" 11'1"9 A B C D E FGH 5 12 3X4(B1)3X3 1.5X4 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 467 /-/-/350 /171 /128 D 58 /-/-/31 /1 /- C 97 /-/-/45 /75 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 B - - HORZ(TL):0.004 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.093 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J2 Ply: 1 Qty:10 SEQN:196651 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T42 DrwNo:347.21.0847.13800 SSB /WHK 12/13/2021 3'5"4 3'5"42'1"6 6"3 1'11"62'7"8'1" 9'8"14 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 467 /-/-/350 /171 /128 D 58 /-/-/31 /1 /- C 97 /-/-/45 /75 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 B - - HORZ(TL):0.004 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.093 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J2 Ply: 1 Qty:10 SEQN:196651 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T42 DrwNo:347.21.0847.13800 SSB /WHK 12/13/2021 3'5"4 3'5"42'1"6 6"3 1'11"62'7"8'1" 9'8"14 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 554 /-/-/393 /192 /179 D 101 /-/-/55 /-/- C 200 /-/-/108 /139 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.004 B - - HORZ(TL):0.006 B - - Creep Factor: 2.0 Max TC CSI:0.561 Max BC CSI:0.151 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J3 Ply: 1 Qty:3 SEQN:196849 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T54 DrwNo:347.21.0847.14803 SSB /WHK 12/13/2021 5'5"4 5'5"42'1"6 6"3 2'9"63'5"10'1" 12'6"14 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 554 /-/-/393 /192 /179 D 101 /-/-/55 /-/- C 200 /-/-/108 /139 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.004 B - - HORZ(TL):0.006 B - - Creep Factor: 2.0 Max TC CSI:0.561 Max BC CSI:0.151 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J3 Ply: 1 Qty:3 SEQN:196849 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T54 DrwNo:347.21.0847.14803 SSB /WHK 12/13/2021 5'5"4 5'5"42'1"6 6"3 2'9"63'5"10'1" 12'6"14 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at -2.11 to 93 plf at 5.44 BC: From 4 plf at -2.11 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 5.44 BC: 360 lb Conc. Load at 3.50 Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (3) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 685 /-/-/-/292 /- D 271 /-/-/-/63 /- C 215 /-/-/-/111 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.008 B - - HORZ(TL):0.014 B - - Creep Factor: 2.0 Max TC CSI:0.700 Max BC CSI:0.657 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J3G Ply: 1 Qty:1 SEQN:26591 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T41 DrwNo:347.21.0847.15743 SSB /WHK 12/13/2021 5'5"4 5'5"42'1"6 6"3 2'9"63'5"10'1" 12'6"14 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP 2250f-1.9E; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 93 plf at -2.11 to 93 plf at 5.44 BC: From 4 plf at -2.11 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 5.44 BC: 360 lb Conc. Load at 3.50 Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (3) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 685 /-/-/-/292 /- D 271 /-/-/-/63 /- C 215 /-/-/-/111 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.008 B - - HORZ(TL):0.014 B - - Creep Factor: 2.0 Max TC CSI:0.700 Max BC CSI:0.657 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.11 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:J3G Ply: 1 Qty:1 SEQN:26591 EJAC FROM: Cust: R 761 JRef:1Xbb7610005 T41 DrwNo:347.21.0847.15743 SSB /WHK 12/13/2021 5'5"4 5'5"42'1"6 6"3 2'9"63'5"10'1" 12'6"14 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Loading Hipjack supports 6-9-4 setback jacks with no webs. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Additional Notes Top chord overhangs have been checked only for loads as indicated. Overhangs not checked for man loads or long-term deflection. (3) 16d common (0.162"x3.5") nails at top chord (3) 16d common (0.162"x3.5") nails at bottom chord Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 758 /-/-/-/330 /- E 372 /-/0 /-/80 /0 D 386 /-/-/-/209 /- Wind reactions based on MWFRS B Brg Wid = 10.8 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 311 -844 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 760 -275 Chords Tens.Comp. G - F 753 -279 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 306 -824 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.060 G 999 360 VERT(CL):0.109 G 999 240 HORZ(LL):-0.009 D - - HORZ(TL):0.017 D - - Creep Factor: 2.0 Max TC CSI:0.635 Max BC CSI:0.891 Max Web CSI:0.295 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:K1 Ply: 1 Qty:2 SEQN:196663 HIP_ FROM: Cust: R 761 JRef:1Xbb7610005 T17 DrwNo:347.21.0847.33943 SSB /WHK 12/13/2021 5'1"3 5'1"3 9'6"14 4'5"11 4'11"7 4'11"7 8'10"6 3'10"15 9'6"14 8"82'11"14 5"15 3'3"133'11"138'1" 11'1"5 A B C D EFG 3.54 12 2X4(A1)1.5X4 3X4 3X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Loading Hipjack supports 6-9-4 setback jacks with no webs. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Additional Notes Top chord overhangs have been checked only for loads as indicated. Overhangs not checked for man loads or long-term deflection. (3) 16d common (0.162"x3.5") nails at top chord (3) 16d common (0.162"x3.5") nails at bottom chord Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 758 /-/-/-/330 /- E 372 /-/0 /-/80 /0 D 386 /-/-/-/209 /- Wind reactions based on MWFRS B Brg Wid = 10.8 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 311 -844 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 760 -275 Chords Tens.Comp. G - F 753 -279 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 306 -824 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.060 G 999 360 VERT(CL):0.109 G 999 240 HORZ(LL):-0.009 D - - HORZ(TL):0.017 D - - Creep Factor: 2.0 Max TC CSI:0.635 Max BC CSI:0.891 Max Web CSI:0.295 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:K1 Ply: 1 Qty:2 SEQN:196663 HIP_ FROM: Cust: R 761 JRef:1Xbb7610005 T17 DrwNo:347.21.0847.33943 SSB /WHK 12/13/2021 5'1"3 5'1"3 9'6"14 4'5"11 4'11"7 4'11"7 8'10"6 3'10"15 9'6"14 8"82'11"14 5"15 3'3"133'11"138'1" 11'1"5 A B C D EFG 3.54 12 2X4(A1)1.5X4 3X4 3X3 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Plating Notes (++) - This plate works for both joints covered. Loading Hipjack supports 6-9-4 setback jacks with no webs. Wind Wind loads and reactions based on MWFRS. Left end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes Top chord overhangs have been checked only for loads as indicated. Overhangs not checked for man loads or long-term deflection. (3) 16d common (0.162"x3.5") nails at top chord (3) 16d common (0.162"x3.5") nails at bottom chord Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 823 /-/-/-/358 /- G 325 /-/0 /-/61 /0 F 367 /-/-/-/200 /- Wind reactions based on MWFRS B Brg Wid = 10.8 Min Req =1.5 G Brg Wid = 1.5 F Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. D - E 341 -953 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. D - K 1048 -404 K - I 885 -312 Chords Tens.Comp. I - H 882 -321 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 175 -448 Webs Tens.Comp. E - H 338 -926 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.053 H 999 360 VERT(CL):0.097 H 999 240 HORZ(LL):-0.021 F - - HORZ(TL):0.038 F - - Creep Factor: 2.0 Max TC CSI:0.634 Max BC CSI:0.712 Max Web CSI:0.146 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:K1T Ply: 1 Qty:1 SEQN:196683 HIP_ FROM: Cust: R 761 JRef:1Xbb7610005 T60 DrwNo:347.21.0847.51423 SSB /WHK 12/13/2021 5'1"3 5'1"3 9'6"14 4'5"11 9"4 9"4 1'6"14 9"10 3'9"13 2'2"15 4'11"7 1'1"11 8'8"4 3'8"13 9'6"14 10"112'11"14 5"15 2'9"133'3"133'11"138'1" 8'7" 11'1"5 A B C D E F GHI JKLM 3.54 12 2X4(A1)1.5X4(++) 3X3 1.5X6(++) 1.5X4 3X4 3X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Plating Notes (++) - This plate works for both joints covered. Loading Hipjack supports 6-9-4 setback jacks with no webs. Wind Wind loads and reactions based on MWFRS. Left end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes Top chord overhangs have been checked only for loads as indicated. Overhangs not checked for man loads or long-term deflection. (3) 16d common (0.162"x3.5") nails at top chord (3) 16d common (0.162"x3.5") nails at bottom chord Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 823 /-/-/-/358 /- G 325 /-/0 /-/61 /0 F 367 /-/-/-/200 /- Wind reactions based on MWFRS B Brg Wid = 10.8 Min Req =1.5 G Brg Wid = 1.5 F Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. D - E 341 -953 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. D - K 1048 -404 K - I 885 -312 Chords Tens.Comp. I - H 882 -321 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - M 175 -448 Webs Tens.Comp. E - H 338 -926 Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.053 H 999 360 VERT(CL):0.097 H 999 240 HORZ(LL):-0.021 F - - HORZ(TL):0.038 F - - Creep Factor: 2.0 Max TC CSI:0.634 Max BC CSI:0.712 Max Web CSI:0.146 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:K1T Ply: 1 Qty:1 SEQN:196683 HIP_ FROM: Cust: R 761 JRef:1Xbb7610005 T60 DrwNo:347.21.0847.51423 SSB /WHK 12/13/2021 5'1"3 5'1"3 9'6"14 4'5"11 9"4 9"4 1'6"14 9"10 3'9"13 2'2"15 4'11"7 1'1"11 8'8"4 3'8"13 9'6"14 10"112'11"14 5"15 2'9"133'3"133'11"138'1" 8'7" 11'1"5 A B C D E F GHI JKLM 3.54 12 2X4(A1)1.5X4(++) 3X3 1.5X6(++) 1.5X4 3X4 3X3 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x6 SP #2; Bot chord: 2x4 SP #2; Loading Hipjack supports 3-5-4 setback jacks with no webs. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 306 /-/-/-/140 /- D 30 /-/-/11 /-/- C 131 /-/-/-/70 /- Wind reactions based on MWFRS B Brg Wid = 10.8 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.000 B - - HORZ(TL):0.001 B - - Creep Factor: 2.0 Max TC CSI:0.176 Max BC CSI:0.058 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:K2 Ply: 1 Qty:4 SEQN:196698 HIP_ FROM: Cust: R 761 JRef:1Xbb7610005 T43 DrwNo:347.21.0847.53497 SSB /WHK 12/13/2021 4'10"5 4'10"52'11"14 5"15 1'11"22'7"212'1" 13'8"10 A B C D 3.54 12 2X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x6 SP #2; Bot chord: 2x4 SP #2; Loading Hipjack supports 3-5-4 setback jacks with no webs. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 306 /-/-/-/140 /- D 30 /-/-/11 /-/- C 131 /-/-/-/70 /- Wind reactions based on MWFRS B Brg Wid = 10.8 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.000 B - - HORZ(TL):0.001 B - - Creep Factor: 2.0 Max TC CSI:0.176 Max BC CSI:0.058 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:K2 Ply: 1 Qty:4 SEQN:196698 HIP_ FROM: Cust: R 761 JRef:1Xbb7610005 T43 DrwNo:347.21.0847.53497 SSB /WHK 12/13/2021 4'10"5 4'10"52'11"14 5"15 1'11"22'7"212'1" 13'8"10 A B C D 3.54 12 2X4(A1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Loading Hipjack supports 5-5-4 setback jacks with no webs. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. (3) 16d common (0.162"x3.5") nails at top chord (3) 16d common (0.162"x3.5") nails at bottom chord Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 689 /-/-/-/311 /- D 79 /-/-/35 /-/- C 348 /-/-/-/192 /- Wind reactions based on MWFRS B Brg Wid = 10.8 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.002 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.809 Max BC CSI:0.277 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:K3 Ply: 1 Qty:1 SEQN:196689 HIP_ FROM: Cust: R 761 JRef:1Xbb7610005 T50 DrwNo:347.21.0848.01677 SSB /WHK 12/13/2021 7'8"4 7'8"42'11"14 5"15 2'9"23'5"210'1" 12'6"10 A B C D 3.54 12 2X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP 2250f-1.9E; Bot chord: 2x4 SP #2; Loading Hipjack supports 5-5-4 setback jacks with no webs. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. (3) 16d common (0.162"x3.5") nails at top chord (3) 16d common (0.162"x3.5") nails at bottom chord Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 689 /-/-/-/311 /- D 79 /-/-/35 /-/- C 348 /-/-/-/192 /- Wind reactions based on MWFRS B Brg Wid = 10.8 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: NA GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.002 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.809 Max BC CSI:0.277 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:K3 Ply: 1 Qty:1 SEQN:196689 HIP_ FROM: Cust: R 761 JRef:1Xbb7610005 T50 DrwNo:347.21.0848.01677 SSB /WHK 12/13/2021 7'8"4 7'8"42'11"14 5"15 2'9"23'5"210'1" 12'6"10 A B C D 3.54 12 2X4(A1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 518 /-/-/438 /277 /67 D -/-36 /-/32 /31 /- C -/-170 /-/132 /166 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.002 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.065 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C1 Ply: 1 Qty:8 SEQN:196644 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T12 DrwNo:347.21.0848.02987 SSB /WHK 12/13/2021 1' 1'2'1"6 6"3 11"31'6"1312'1" 12'8"11 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 518 /-/-/438 /277 /67 D -/-36 /-/32 /31 /- C -/-170 /-/132 /166 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.002 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.065 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C1 Ply: 1 Qty:8 SEQN:196644 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T12 DrwNo:347.21.0848.02987 SSB /WHK 12/13/2021 1' 1'2'1"6 6"3 11"31'6"1312'1" 12'8"11 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 453 /-/-/344 /174 /117 D 49 /-/-/25 /4 /- C 70 /-/-/36 /59 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.085 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C2 Ply: 1 Qty:7 SEQN:196645 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T11 DrwNo:347.21.0848.04237 SSB /WHK 12/13/2021 3' 3'2'1"6 6"3 1'9"32'4"1312'1" 13'6"11 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 453 /-/-/344 /174 /117 D 49 /-/-/25 /4 /- C 70 /-/-/36 /59 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.085 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C2 Ply: 1 Qty:7 SEQN:196645 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T11 DrwNo:347.21.0848.04237 SSB /WHK 12/13/2021 3' 3'2'1"6 6"3 1'9"32'4"1312'1" 13'6"11 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 453 /-/-/344 /174 /117 E 14 /-/-/20 /14 /- D 77 /-/-/50 /42 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 G 999 360 VERT(CL):0.005 G 999 240 HORZ(LL):0.004 C - - HORZ(TL):0.005 C - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.093 Max Web CSI:0.014 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C2T Ply: 1 Qty:1 SEQN:196672 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T55 DrwNo:347.21.0848.05880 SSB /WHK 12/13/2021 2'5"2 2'5"2 3' 6"14 2'8"6 2'8"6 3' 3"102'1"6 6"3 6"1'3"31'9"32'4"138'1" 8'7" 9'6"11 A B C D EFGH 5 12 3X4(B1) 3X3 1.5X4 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 453 /-/-/344 /174 /117 E 14 /-/-/20 /14 /- D 77 /-/-/50 /42 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 G 999 360 VERT(CL):0.005 G 999 240 HORZ(LL):0.004 C - - HORZ(TL):0.005 C - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.093 Max Web CSI:0.014 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C2T Ply: 1 Qty:1 SEQN:196672 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T55 DrwNo:347.21.0848.05880 SSB /WHK 12/13/2021 2'5"2 2'5"2 3' 6"14 2'8"6 2'8"6 3' 3"102'1"6 6"3 6"1'3"31'9"32'4"138'1" 8'7" 9'6"11 A B C D EFGH 5 12 3X4(B1) 3X3 1.5X4 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 533 /-/-/382 /187 /168 D 91 /-/-/49 /-/- C 180 /-/-/95 /126 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.004 B - - HORZ(TL):0.005 B - - Creep Factor: 2.0 Max TC CSI:0.502 Max BC CSI:0.242 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C3 Ply: 1 Qty:3 SEQN:196646 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T10 DrwNo:347.21.0848.07333 SSB /WHK 12/13/2021 5' 5'2'1"6 6"3 2'7"33'2"1310'1" 12'4"11 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 533 /-/-/382 /187 /168 D 91 /-/-/49 /-/- C 180 /-/-/95 /126 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.004 B - - HORZ(TL):0.005 B - - Creep Factor: 2.0 Max TC CSI:0.502 Max BC CSI:0.242 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C3 Ply: 1 Qty:3 SEQN:196646 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T10 DrwNo:347.21.0848.07333 SSB /WHK 12/13/2021 5' 5'2'1"6 6"3 2'7"33'2"1310'1" 12'4"11 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 533 /-/-/382 /187 /168 E 59 /-/-/34 /-/- D 189 /-/-/105 /115 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.062 F 950 360 VERT(CL):0.111 F 528 240 HORZ(LL):0.027 C - - HORZ(TL):0.048 C - - Creep Factor: 2.0 Max TC CSI:0.480 Max BC CSI:0.103 Max Web CSI:0.050 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C3T Ply: 1 Qty:1 SEQN:196675 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T56 DrwNo:347.21.0848.08460 SSB /WHK 12/13/2021 2'5"2 2'5"2 5' 2'6"14 2'8"6 2'8"6 5' 2'3"102'1"6 6"3 6"2'1"32'7"33'2"138'1" 8'7" 10'4"11 A B C D E FGH 5 12 3X4(B1)3X3 1.5X4 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 533 /-/-/382 /187 /168 E 59 /-/-/34 /-/- D 189 /-/-/105 /115 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.062 F 950 360 VERT(CL):0.111 F 528 240 HORZ(LL):0.027 C - - HORZ(TL):0.048 C - - Creep Factor: 2.0 Max TC CSI:0.480 Max BC CSI:0.103 Max Web CSI:0.050 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C3T Ply: 1 Qty:1 SEQN:196675 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T56 DrwNo:347.21.0848.08460 SSB /WHK 12/13/2021 2'5"2 2'5"2 5' 2'6"14 2'8"6 2'8"6 5' 2'3"102'1"6 6"3 6"2'1"32'7"33'2"138'1" 8'7" 10'4"11 A B C D E FGH 5 12 3X4(B1)3X3 1.5X4 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 518 /-/-/438 /277 /67 D -/-36 /-/32 /31 /- C -/-170 /-/132 /166 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.002 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.065 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C4 Ply: 1 Qty:8 SEQN:196647 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T15 DrwNo:347.21.0848.09680 SSB /WHK 12/13/2021 1' 1'2'1"6 6"3 11"31'6"1312'1" 12'8"11 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 518 /-/-/438 /277 /67 D -/-36 /-/32 /31 /- C -/-170 /-/132 /166 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.002 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.065 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C4 Ply: 1 Qty:8 SEQN:196647 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T15 DrwNo:347.21.0848.09680 SSB /WHK 12/13/2021 1' 1'2'1"6 6"3 11"31'6"1312'1" 12'8"11 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 453 /-/-/344 /174 /117 D 49 /-/-/25 /4 /- C 70 /-/-/36 /59 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.085 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C5 Ply: 1 Qty:7 SEQN:196648 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T14 DrwNo:347.21.0848.10837 SSB /WHK 12/13/2021 3' 3'2'1"6 6"3 1'9"32'4"138'1" 9'6"11 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 453 /-/-/344 /174 /117 D 49 /-/-/25 /4 /- C 70 /-/-/36 /59 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 B - - HORZ(TL):0.003 B - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.085 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C5 Ply: 1 Qty:7 SEQN:196648 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T14 DrwNo:347.21.0848.10837 SSB /WHK 12/13/2021 3' 3'2'1"6 6"3 1'9"32'4"138'1" 9'6"11 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 453 /-/-/344 /174 /117 E 14 /-/-/20 /14 /- D 77 /-/-/50 /42 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 G 999 360 VERT(CL):0.005 G 999 240 HORZ(LL):0.004 C - - HORZ(TL):0.005 C - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.093 Max Web CSI:0.014 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C5T Ply: 1 Qty:1 SEQN:196666 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T53 DrwNo:347.21.0848.11973 SSB /WHK 12/13/2021 2'5"2 2'5"2 3' 6"14 2'8"6 2'8"6 3' 3"102'1"6 6"3 6"1'3"31'9"32'4"138'1" 8'7" 9'6"11 A B C D EFGH 5 12 3X4(B1) 3X3 1.5X4 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 453 /-/-/344 /174 /117 E 14 /-/-/20 /14 /- D 77 /-/-/50 /42 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 G 999 360 VERT(CL):0.005 G 999 240 HORZ(LL):0.004 C - - HORZ(TL):0.005 C - - Creep Factor: 2.0 Max TC CSI:0.443 Max BC CSI:0.093 Max Web CSI:0.014 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C5T Ply: 1 Qty:1 SEQN:196666 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T53 DrwNo:347.21.0848.11973 SSB /WHK 12/13/2021 2'5"2 2'5"2 3' 6"14 2'8"6 2'8"6 3' 3"102'1"6 6"3 6"1'3"31'9"32'4"138'1" 8'7" 9'6"11 A B C D EFGH 5 12 3X4(B1) 3X3 1.5X4 1.5X4 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 533 /-/-/382 /187 /168 D 91 /-/-/49 /-/- C 180 /-/-/95 /126 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.004 B - - HORZ(TL):0.005 B - - Creep Factor: 2.0 Max TC CSI:0.502 Max BC CSI:0.242 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C6 Ply: 1 Qty:2 SEQN:196649 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T13 DrwNo:347.21.0848.13013 SSB /WHK 12/13/2021 5' 5'2'1"6 6"3 2'7"33'2"138'1" 10'4"11 A B C D 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 533 /-/-/382 /187 /168 D 91 /-/-/49 /-/- C 180 /-/-/95 /126 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 D Brg Wid = 1.5 C Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.004 B - - HORZ(TL):0.005 B - - Creep Factor: 2.0 Max TC CSI:0.502 Max BC CSI:0.242 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C6 Ply: 1 Qty:2 SEQN:196649 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T13 DrwNo:347.21.0848.13013 SSB /WHK 12/13/2021 5' 5'2'1"6 6"3 2'7"33'2"138'1" 10'4"11 A B C D 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 288 /-/-/169 /79 /125 C 97 /-/-/56 /-/- B 211 /-/-/122 /140 /- Wind reactions based on MWFRS A Brg Wid = 4.0 Min Req =1.5 C Brg Wid = 1.5 B Brg Wid = 1.5 Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.007 A - - HORZ(TL):0.013 A - - Creep Factor: 2.0 Max TC CSI:0.576 Max BC CSI:0.277 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C6A Ply: 1 Qty:1 SEQN:196660 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T57 DrwNo:347.21.0848.14127 SSB /WHK 12/13/2021 5' 5' 6"3 2'7"310'1" 12'4"11 A B C 5 12 3X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A 288 /-/-/169 /79 /125 C 97 /-/-/56 /-/- B 211 /-/-/122 /140 /- Wind reactions based on MWFRS A Brg Wid = 4.0 Min Req =1.5 C Brg Wid = 1.5 B Brg Wid = 1.5 Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.007 A - - HORZ(TL):0.013 A - - Creep Factor: 2.0 Max TC CSI:0.576 Max BC CSI:0.277 Max Web CSI:0.000 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C6A Ply: 1 Qty:1 SEQN:196660 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T57 DrwNo:347.21.0848.14127 SSB /WHK 12/13/2021 5' 5' 6"3 2'7"310'1" 12'4"11 A B C 5 12 3X4(B1) 12/13/2021 COA #0 278 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 533 /-/-/382 /187 /168 E 59 /-/-/34 /-/- D 189 /-/-/105 /115 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.062 F 950 360 VERT(CL):0.111 F 528 240 HORZ(LL):0.027 C - - HORZ(TL):0.048 C - - Creep Factor: 2.0 Max TC CSI:0.480 Max BC CSI:0.103 Max Web CSI:0.050 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C6T Ply: 1 Qty:1 SEQN:196669 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T59 DrwNo:347.21.0848.15177 SSB /WHK 12/13/2021 2'5"2 2'5"2 5' 2'6"14 2'8"6 2'8"6 5' 2'3"102'1"6 6"3 6"2'1"32'7"33'2"138'1" 8'7" 10'4"11 A B C D E FGH 5 12 3X4(B1)3X3 1.5X4 1.5X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING! **IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum Drive Suite 305 Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes Provide (2) 0.131"x3.0", min. toe-nails at top chord. Provide (2) 0.131"x3.0", min. toe-nails at bottom chord. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 533 /-/-/382 /187 /168 E 59 /-/-/34 /-/- D 189 /-/-/105 /115 /- Wind reactions based on MWFRS B Brg Wid = 7.6 Min Req =1.5 E Brg Wid = 1.5 D Brg Wid = 1.5 Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:30.00 TCDL:15.00 BCLL:0.00 BCDL:10.00 Des Ld:55.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:170 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.0 psf BCDL: 4.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/5(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.062 F 950 360 VERT(CL):0.111 F 528 240 HORZ(LL):0.027 C - - HORZ(TL):0.048 C - - Creep Factor: 2.0 Max TC CSI:0.480 Max BC CSI:0.103 Max Web CSI:0.050 VIEW Ver: 20.02.01A.1209.10 Job Number:21-0821 /GROZA BUILDERS, INC. / /WRIGHT RESIDENCE Truss Label:C6T Ply: 1 Qty:1 SEQN:196669 JACK FROM: Cust: R 761 JRef:1Xbb7610005 T59 DrwNo:347.21.0848.15177 SSB /WHK 12/13/2021 2'5"2 2'5"2 5' 2'6"14 2'8"6 2'8"6 5' 2'3"102'1"6 6"3 6"2'1"32'7"33'2"138'1" 8'7" 10'4"11 A B C D E FGH 5 12 3X4(B1)3X3 1.5X4 1.5X4 12/13/2021 COA #0 278 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/13/2021COA #0 278 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/13/2021COA #0 278 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/13/2021COA #0 278