Loading...
HomeMy WebLinkAboutROOF MOUNTED PV SYSTEMGodwin Engineering and Design, LLC 8378 Foxtail Loop Pensacola, FL 32526 D. Chad Godwin, PE Chad@godwineng.com R-1 # Modules (24) Pitch: 22° Azimuth: 277° 3'-5" 5'-9" FRONT OF HOUSE R-1 01/05/2022 KG . . Green Ready 4705 Lena Rd. Unit 104 Bradenton, FL 34211 833-478-6797 Meets all requirements of NFPA-1 7th Edition and NFPA-101 3' Access Pathway 1st Responder Access minimum of 36" unobstructed as per Section R324 of the 2018 IRC Customer Info: S-1 Date: Drawn by: Revised by: Rev #: 00 Rev Date: Page: Represents all Fire Clearance including Alternative methods Meets the requirements of the following- (2020 FL Residential Code & FBC, 7th Edition (2018 International Residential Code) - 2nd Printing modified by the FL Building Standards, 2020 Florida Building Energy Conservation Code 7th edition, County of St. Lucie Code, 2017 National Electric Code.) Legend First responder access Sheet Index S-1 Cover Sheet / Site Plan S-2 Detail E-1 One - Line E-2 Electrical Code S-1A Mounting Plan Utility Meter PV Disconnect Vent Pipe Chimney Satellite FRONT OF HOUSE N Inverter Type: PV Panel: Racking: Total Wattage: Roof Type: Wind Load: Fastener Type: Iron Ridge XR-100 Enphase IQ7PLUS-72-2-US (24) DNA-120-MF26-360W 8,640W Composition Shingle 20 to 27 Deg Use 5/16" Dia 4.75" Lags Layout Subject to Change Based on Site Conditions Meets All Editions of Florida Fire Prevention Code 2020 7th Edition Compass for Aerial System meets the requirements of NFPA 70th Edition, Chapter 11.12 Install will be done to Manufacturer Spec Edward June 8612 Cobblestone DR Fort Pierce, FL 34945 -COGEN Disconnect Located adjacent to Utility meter General Notes: -Enphase IQ7PLUS-72-2-US Micro Inverters are located on roof behind each module. -First responder access maintained and from adjacent roof. -Wire run from array to connection is 40 feet. Ground Access 3'1'-6" 2' Gutter 2' Gutter Utility Meter Solar Pool Heater Solar Pool Heater Godwin Engineering and Design, LLC 8378 Foxtail Loop Pensacola, FL 32526 D. Chad Godwin, PE Chad@godwineng.com 01/05/2022 KG . . Green Ready 4705 Lena Rd. Unit 104 Bradenton, FL 34211 833-478-6797-Roof Height 15' -Per 2020 FBC, the Roof Mounted PV System will be subject to the following design criteria: Design Wind Speed(Vult) - 160mph 3 sec gust, Exposure Category - B -Designed as per ASCE7-16 General Notes: - L Feet are secured to roof rafters. using 5/16" x 4.75" stainless steel Lag bolts. - Subject roof has One layer. - All penetrations are sealed and flashed. Customer Info: S-2 Date: Drawn by: Revised by: Rev #: 00 Rev Date: Page: Inverter Type: PV Panel: Racking: Total Wattage: Roof Type: Wind Load: Fastener Type: Iron Ridge XR-100 Enphase IQ7PLUS-72-2-US (24) DNA-120-MF26-360W 8,640W Composition Shingle 20 to 27 Deg Use 5/16" Dia 4.75" Lags Install will be done to Manufacturer Spec Edward June 8612 Cobblestone DR Fort Pierce, FL 34945 Ironridge XR-100 Roof Section Pitch Roof Rafter and Spacing Overhang Notes: R1 5/12 2"x4" @ 24 O.C.12"Truss @ 72" O.C. in Zone 1, @ 72" O.C in Zone 2e, @ 72" O.C. in Zone 2r & @ 72" O.C in Zone 3 Godwin Engineering and Design, LLC 8378 Foxtail Loop Pensacola, FL 32526 D. Chad Godwin, PE Chad@godwineng.com 01/05/2022 KG . . Green Ready 4705 Lena Rd. Unit 104 Bradenton, FL 34211 833-478-6797 In Case of Emergency Call Green Ready LLC at 833-478-6797 Customer Info: E-1 Date: Drawn by: Revised by: Rev #: 00 Rev Date: Page: GEC NOTES - Ungrounded system per 690.41(A)(4) - GEC must be installed per 250.64 - GEC must be continuous un-spliced or irreversibly spliced from inverter to existing service ground system or continuous from the arrays to the existing service ground system. - GEC must be min #8 AWG and installed in conduit - If GEC is not in conduit, it must be #6 min #8 AWG THWN (2) Hot (1) Neutral #8 AWG EGC in @ least 3/4" Conduit Typically GEC 40A Main Service 150A 200A Bus Load side connection Per 705.12(B)(2)(3)(b) Use Matching or equivalent approved breaker if derating Busbar Rating 200 150 90 90 40 Load Side Connection Main Breaker Size Bus Rating *1.2-Main Break Size Max Allowable Load Side Load Side Breaker Size Utility PV AC Disco Install will be done to Manufacturer Spec Including the label below Edward June 8612 Cobblestone DR Fort Pierce, FL 34945 Manual Lockable Disconnect Located Adjacent to Utility Meter Note: -All wiring to meet the 2017 NEC and Florida electric codes. 60A Disconnect -Type of conduit to be determined on site by contractor. Inverter Type: Enphase IQ7PLUS-72-2-US PV Panel: (24) DNA-120-MF26-360W Total Wattage: 8,640W System meets the grounding requirements of NEC 690.43 All Labels & Markings for photovoltaic system will be reflective and meet all requirements for NFPA 11.12 Disconnects will be Visible, lockable, adjacent to and within 10' of utility meter Meets 11.12.2.1.5 #10 AWG THWN for Home runs (1) Line 1 (1) Line 2 Per Circuit #8 AWG THWN (1) EGC Inside @ least 3/4" Conduit (tbd on site) Photovoltaics: (24) DNA-120-MF26-360W Inverters: (24) Enphase IQ7PLUS-72-2-US Micro Inverters Circuits: (2) circuits of (12) Modules Maximum Inverters Per 20A Circuit (13) Roof Enphase Combiner Box (1) - 20A Breaker Per Circuit #8 AWG THWN (1) Line 1 (1) Line 2 (1) Neutral #8 (1) EGC in @ least 3/4" Conduit Typically Disconnect AC Max Output Current AC Max Output Current * 1.25% Overcurrent Protection (A) No. of Current Carrying Cond Conductor Gauge (AWG) Enphase Output Ckt Per String To Overcurrent Protection Device Enphase Total Output Ckt AC Max Output Current AC Max Output Current * 1.25% Overcurrent Protection (A) No. of Current Carrying Cond Conductor Gauge (AWG) NEC LABEL NOTES: 1.THE WARNING SIGN(S) OR LABEL(S) SHALL COMPLY WITH NEC 110.21(B) 2.LABELS SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE THEY ARE INSTALLED. 3.LABELS TO BE A MIN LETTER HEIGHT OF 3/8" AND PERMANENTLY AFFIXED. 4.LABELS SHALL ALSO COMPLY WITH THE SPECIFIC REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION NEMA 3R Junction Box Black - L1 Red - L2 Green - Ground Enphase IQ Trunk Cable Q-12-240 #12AWG THHN-THWN-2 UL 9703 Grounding Conductor to be bare #8 Awg #X-IQ-AM1-240 Solar Combiner Box 240V PHOTOVOLTAIC SYSTEM ! AC DISCONNECT ! RATED AC OUTPUT CURRENT: 29.04A NOMINAL OPERATING VOLTAGE: 240VAC 2 Circuits 10/15A Breaker for Envoy 60A Non-Fused Disconnect M Godwin Engineering and Design, LLC 8378 Foxtail Loop Pensacola, FL 32526 D. Chad Godwin, PE Chad@godwineng.com 01/05/2022 KG . . Green Ready 4705 Lena Rd. Unit 104 Bradenton, FL 34211 833-478-6797 In Case of Emergency Call Green Ready LLC at 833-478-6797 In Case of Emergency Call Green Ready LLC at 833-478-6797 Customer Info: E-2 Date: Drawn by: Revised by: Rev #: 00 Rev Date: Page: GEC NOTES - Ungrounded system per 690.41(A)(4) - GEC must be installed per 250.64 - GEC must be continuous un-spliced or irreversibly spliced from inverter to existing service ground system or continuous from the arrays to the existing service ground system. - GEC must be min #8 AWG and installed in conduit - If GEC is not in conduit, it must be #6 min Install will be done to Manufacturer Spec Including the label below Edward June 8612 Cobblestone DR Fort Pierce, FL 34945 Inverter Type: Enphase IQ7PLUS-72-2-US PV Panel: (24) DNA-120-MF26-360W Total Wattage: 8,640W System meets the grounding requirements of NEC 690.43 All Labels & Markings for photovoltaic system will be reflective and meet all requirements for NFPA 11.12 Disconnects will be Visible, lockable, adjacent to and within 10' of utility meter Note: -Subject PV Systems has been designed to meet the requirments of the NEC 2017, and those set forth by the Florida Solar Energy Center Certification, Including Maximum Number of Module Strings, Maximum number of modules per string, Maximum Output, Module Manufacturer and model number, inverter manufacturer and model number, as applicable. Rapid Shutdown Built in Per Code NEC 690.12 Conductors have a min ampacity of 60 amperes Per Code NEC 230.79(D) PV AC disconnect is lockable in the open position per code NEC 705.22(7) Labels will be placed in the correct location Per Code NEC 690.56(B), 690.56(C), & 690.53 Metallic conduits, raceways or flexible metal conduit exceeding 6 feet in length are not permitted in accordance with NEC article 690.31(G). Include required label for metallic raceways and conduits to sheet E-1 per NEC article 690.31(G)(3). Add required label to sheet E-1 per NEC article 705.10. Include required label to sheet E-1 per NEC article 705.12(B) Photovoltaic AC disconnect shall be capable of being locked in the open position per NEC article 705.22(6). Photovoltaic AC Overcurrent protection shall be located within 10 feet of the point where conductors are connected to the service per NEC 705.31. 705.12(B)(3) 705.12(B)(2)(3)(b) NEC 705.10 A permanent plaque or directory, denoting the location of all electric power source disconnecting means on or in the premises, shall be installed at each service equipment location and at the location(s) of the system disconnect(s) for all electric power production sources capable of being interconnected. One sign required for each PV system. -Markings Shall Be reflective, Weather Resistant and suitable for the environment. -Markings Shall be red with white lettering with minimum 3 8" Capital Letters Disconnect means shall be provided for all disconnecting all ungrounded conductors that supply or pass through the building or structure Per Code 2017 NEC Section 225.31 & Section 225.32 In compliance with NEC 250.58, NEC 690.8, NEC 250.24, NEC250.24(D) NEC 690.31 (G)(3) NEC 690.35 E04. Construction documents specify PV system circuits installed on or in buildings include a rapid shutdown function that controls specific conductors in accordance with NEC article 690.12. E05. These construction documents specify that a label is provided with the method to initiate rapid shut down per 690.12(4). E06. Construction drawings specify buildings or structures with both utility service and a PV system, complying with NEC article 690.l2 shall have a permanent plaque or directory including the following wording: “PHOTO VOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN” as per NEC article 690.56 (C). E07. Construction documents specify PV power circuit labels shall appear on every section of the wiring system that is separated by enclosures, walls, partitions, ceilings, or floors. E08. Construction documents specify all warning sign(s) or label(s) shall comply with NEC article 110.21 (B). Label warnings shall adequately warn of the hazard. Labels shall be permanently affixed to the equipment, and Labels required shall be suitable for the environment. Markings shall be placed on all DC Conduits, DC Combiners, Raceways, Enclosures, Junction Boxes, and Cable Assemblies at every 10', turns, and above and below penetrations in compliance with NFPA System is in complaince with FFPC 1:11.12 7th Edition. Smoke Detectors will be added as per FBC 553.883 Permanent sticker added to disconnect Apply to Main Disconnect Figure 690.56(C)(1)(a) Label for PV Systems that Shut down the array and the conductors leaving the array Disconnect is in compliance 230.72 Supply side disconnect adjacent to Msp Over Current Protection Device is "Next size up" Based on Inverter Maximum Continuous Output Current Rating 2017 NEC 240.4(B) All Exterior equipment is A minimum of Nema-R3 Rated All Interactive System(S) Points of interconnection with other sources shall be marked at an accesible location at the disconnecting means as a power source and with the rated ac output current and the nominal operating AC voltage. Per NEC 690.54 -A placard will be added with instructions and locations to be in compliance with 690.12, 690.56(B) and NEC 705.10 -All new equipment located adjacent to Meter on exterior wall Everything will be built to Code without all Specifics labeled on plan In compliance with 230.71 The Placard shall be permanently riveted..., and shall be made of red, weatherproof, hard plastic, with engraved white block lettering. WARNING: DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM WARNING: INVERTER OUTPUT CONNECTION: DO NOT RELOCATE THIS OVERCURRENT DEVICE PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN WARNING: DEDICATED SOLAR PANEL DO NOT CONNECT ANY OTHER LOADS WARNING:PHOTOVOLTAIC POWER SOURCE SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. SOLAR ELECTRIC PV PANELS 3/8 IN MIN. TEXT 3/16 IN MIN. TEXT ! WARNING ! POWER SOURCE OUTPUT CONNECTION: DO NOT RELOCATE THIS OVERCURRENT DEVICE Plans Satisfy NEC 250.94 & NEC250.53(A)(2) 8 50 Combiner box in compliance Per Code NEC 705.12 2* 20A < 125A *No other loads to be added Load side connection will be done in Meter Main Combo Located Outside Note: -All wiring to meet the 2017 NEC and Florida electric codes. 60A Disconnect -Type of conduit to be determined on site by contractor. Godwin Engineering and Design, LLC 8378 Foxtail Loop Pensacola, FL 32526 D. Chad Godwin, PE Chad@godwineng.com 1 Iron Ridge FF2 17' 14' Splice Bar 4 8 Iron Ridge UFO's 34 52 8 Iron Ridge Sleeves/End Caps8 Iron Ridge Ground Lugs 1 2 Iron Ridge XR-100 Rail DNA-120-MF26-360W Enphase IQ7PLUS-72-2-US 24 24 Roof Top Combiner Meter Main 1 Enphase Combiner Box 1 40A Breaker 60A Non-Fused Disconnect 2 20A 2P Breaker 3'-5" 5'-9" R-1 # Modules (24) Pitch: 22° Azimuth: 277° 21'-1" 37'-3" 62'-3" 12'-0" 9'-1" 3'-10" L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L 2' Gutter 01/05/2022 KG . . Green Ready 4705 Lena Rd. Unit 104 Bradenton, FL 34211 833-478-6797Customer Info: S-1A Date: Drawn by: Revised by: Rev #: 00 Rev Date: Page: Inverter Type: PV Panel: Racking: Total Wattage: Roof Type: Wind Load: Fastener Type: Iron Ridge XR-100 Enphase IQ7PLUS-72-2-US (24) DNA-120-MF26-360W 8,640W Composition Shingle 20 to 27 Deg Use 5/16" Dia 4.75" Lags Install will be done to Manufacturer Spec Edward June 8612 Cobblestone DR Fort Pierce, FL 34945 Plans satisfy zones FBC-1510.7.1 L Proposed Mounting locations Max cantilever is 24" as per manufacturer spec. Max Cantilever = Max Span * (1 3)=72"*(1 3)=24"Zone 1, 2e, 2r & 3: aptos solar technologyTMSolar for InnovatorsDesigned & Engineered in Silicon Valley360W l 355W l 350WPatented DNATM technology boosts power r;u=oul-m1;şlo7†Ѵ;;L1b;m1‹7ˆ-m1;7 vrѴb| 1;ѴѴ |;1_moѴo]‹ ‰b|_ Ɩ †Ѵ|u-Ŋ|_bm0†v0-uv-ѴѴo‰v=ouѴ;vvu;vbv|-m1;-m7lou;r_o|omcaptureOur DNATM"rѴb|;ѴѴ";ub;vblru;vvbˆ;Ѵ‹1ol0bm;v-7ˆ-m1;7voѴ-u|;1_moѴo]b;v|ol-ŠblbŒ;r;u=oul-m1;ĺ†ur-|;m|;7Dual Nano Absorber (DNATM) Technology allows the panel to or;u-|; -| _b]_Ŋ;L1;m1b;v bm ;Š|u;l; |;lr;u-|†u;vĺom|-1|o†uv-Ѵ;v|;-l|o7-‹|oѴ;-umlou;-0o†|o†uѴbm;o=_b]_Ŋ;L1b;m|‹voѴ-ur-m;Ѵvĺ7;-ѴvoѴ†ঞom=ou-rrѴb1-ঞomv-@;1|;70‹v_-7bm]ѴѴŊ0Ѵ-1h7;vb]m=ourubvঞm;-;v|_;ঞ1vo;Š1;vvbˆ;vbѴˆ;u0†vvbm]ouub00omv!o0†v| ruo7†1| 7;vb]m bv u;vѴb;m| bm ;Š|u;l;‰;-|_;uĺ&r|oƔƓƏƏ-vmo‰Ѵo-7-m7ƑƐƏlr_‰bm7vr;;7v30 Year Warranty3140 De La Cruz Blvd., Ste 200Santa Clara, CA 95054 wwww.aptossolar.com info@aptossolar.com3X IEC StandardsLinear Performance Warranty 1 year10 years20 years93.2%87.8%90.7%80.2%Aptos WarrantyIndustry Standard98%97%30 years25 years76.7%83.7%ƳƑĺƔѷƳƓĺƐѷƳƓĺƖѷƳƔĺƕѷ85.1%82.4%Standard Warrantyrঞom-Ѵ Š|;m7;7)-uu-m|‹RETC Top Performer!;vb7;mঞ-ѴѴoll;u1b-Ѵ120TMDNOvoDoro_bSolar for Innovators Ѵ;1|ub1-Ѵ"r;1bC-1ঞomv"$u-|;7†|r†|mpp (W)o7†Ѵ; L1b;m1‹r;mbu1†b|(oѴ|-];((Ő(ő"_ou|bu1b†|†uu;m|" (A)!-|;7(oѴ|-];(mmpŐ(ő!-|;7(oѴ|-];mmp (A)ƒѵƏ) ƒƔƔ) ƒƔƏ)ƐƖĺƕƒѷƐƖĺƓѵѷƐƖĺƐѶѷƓƏĺѵ ƓƏĺƓ ƓƏĺƑƐƐĺƑƓƒƒĺѶƐƏĺѵѵƐƐĺƐƓƒƒĺѵƐƏĺƔƕƐƐĺƏƓƒƒĺƓƐƏĺƓѶ"|-m7-u7$;v|om7bঞomv=ou=uom|Ŋ=-1;o=r-m;ѴĹƐƏƏƏ)ņlƑķƑƔŦķl;-v†u;l;m|†m1;u|-bm|‹<ƒѷ$;lr;u-|†u;o;L1b;m|v$;lr;u-|†u;o;L1b;m|vmmp$;lr;u-|†u;o;L1b;m|vsc$;lr;u-|†u;o;L1b;m|v(oul-Ѵr;u-ঞm];ѴѴ$;lr;u-|†u;Ő$őŊƏĺƒѵѷƳƏĺƏƔѷņŦŊƏĺƑƖѷņŦƓƓŦ$;v|r;u-ঞm]om7bঞomv-Šbl†l";ub;v †v;-Šbl†l"‹v|;l(oѴ|-];-Šbl†lo-7-r-1b|‹Ő;u&ƐƕƏƒő bu;;u=oul-m1;Ѵ-vvƑƏƐķƔƏƏ( Ő&ş őƔƓƏƏ"mo‰o-7ņƑƐƏlr_)bm7!-ঞm]Ѵ-vvņ$‹r;Ɛ-1h-]bm]omC]†u-ঞomNumber of Modules per Pallet†l0;uo=-ѴѴ;|vr;uƓƏ[ĺom|-bm;u-ѴѴ;| bl;mvbomv-ѴѴ;|);b]_|Őh]őƒƏƑѵƐƕƓƏ*ƐƐƓƏ*ƐƐѵƔѵƓƏom|-bm;u);b]_|Őh]őƐѵѵƓƏ;1_-mb1-Ѵuor;uঞ;v;ѴѴ$‹r;Glass u-l;†m1ঞomoŠ bl;mvbomv†|r†|-0Ѵ;omo1u‹v|-ѴѴbm;ƒĺƑllķ-mঞŊu;Y;1ঞom1o-ঞm]ķ_b]_|u-mvlbvvbomķѴo‰buomķ|;lr;u;7]Ѵ-vvmo7bŒ;7Ѵ†lbm†lѴѴo‹ѵѶƐƕƔѵ*ƐƏƒƖ*ƒƔllƓllƑŐ &őƐƑ)ķƒƖĺƒƕbmĺŐƐƑƏƏllő);b]_|-0Ѵ;;m]|_ m1-rv†Ѵ-m|ƓƔĺƐƖѴ0vĺŐƑƏĺƔh]őƐƑƏƏll Aptos Solar Technology reserves the right to make specification changes without notice120TMDNaptos solar technologyTM35mm1039mm1756mm800mm1471mmDNA-120-MF26-360WDNA-120-MF26-355WDNA-120-MF26-350WI-V Curve ƏƑƓ6ѶƐƏƐƑƐƏƑƏƒƏƓƏƔƏƒѵƏ);uঞC1-ঞomvUL61730-1, UL61730-23535 Tech BriefSolar Is Not Always SunnyOver their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, but the worst storms in 40 years. High winds capable of ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails are the structural backbone preventing these results. They resist uplift, protect DJDLQVWEXFNOLQJDQGVDIHO\DQGHIÀFLHQWO\transfer loads into the building structure. Their superior spanning capability requires fewer roof attachments, reducing the number of roof penetrations and the amount of installation time.XR Rail FamilyForce-Stabilizing CurveSloped roofs generate both vertical and lateral forces on mounting rails which can cause them to bend and twist. The curved shape of XR Rails is specially designed to increase strength in both directions while resisting the twisting. This unique feature ensures greater security during extreme weather and a longer system lifetime.Compatible with Flat & Pitched RoofsRoof Mount utilizes XR Rails, along with optional all-in-one attachments, WRVHFXUHV\VWHPVÁXVKagainst residential roofs.Roof Mount utilizes XRRails, along with optionalall-in-one attachments,WRVHFXUHV\VWHPVÁXVKagainst residential roofs.Corrosion-Resistant MaterialsXR Rails are compatible with FlashFoot and other pitched roof attachments.IronRidge offers a range of tilt leg RSWLRQVIRUÁDWroof mounting applications.All XR Rails are made of 6000-series aluminum alloy, then protected with an DQRGL]HGÀQLVK$QRGL]LQJSUHYHQWVVXUIDFHand structural corrosion, while also providing a more attractive appearance. XR Rail Family7KH;55DLO)DPLO\RIIHUVWKHVWUHQJWKRIDFXUYHGUDLOLQWKUHHWDUJHWHGVL]HV(DFKVL]HVXSSRUWVVSHFLÀFdesign loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. © 2020 IronRidge, Inc. All rights reserved. Visit www.ironridge.com or call 1-800-227-9523 for more information. Version 1.20Tech BriefRail SelectionThe table below was prepared in compliance with applicable engineering codes and standards.* Values are based on the following criteria: ASCE 7-16, Gable Roof Flush Mount, Roof Zones 1 & 2e, Exposure B, Roof 6ORSHRIWRGHJUHHVDQG0HDQ%XLOGLQJ+HLJKWRIIW9LVLW,URQ5LGJHFRPIRUGHWDLOHGFHUWLÀFDWLRQOHWWHUVLoadRail SpanSnow (PSF) Wind (MPH) 4’ 5’ 4” 6’ 8’ 10’ 12’None90120140XR10 XR100 XR100016020901201401603090160409016080 160120 160XR100XR100 is the ultimate residential mounting rail. It supports a range of wind and snow conditions, while also maximizing spans up to 10 feet.• ·VSDQQLQJFDSDELOLW\• Heavy load capability• &OHDU EODFNDQRGL]HGÀQLVK• Internal splices availableXR10;5LVDVOHHNORZSURÀOHPRXQWLQJrail, designed for regions with light or no snow. It achieves spans up to 6 feet, while remaining light and economical.• ·VSDQQLQJFDSDELOLW\• Moderate load capability• &OHDU EODFNDQRGL]HGÀQLVK• Internal splices availableXR1000XR1000 is a heavyweight among VRODUPRXQWLQJUDLOV,W·VEXLOWWRKDQGOHextreme climates and spans up to 12 feet for commercial applications.• ·VSDQQLQJFDSDELOLW\• Extreme load capability• &OHDUDQRGL]HGÀQLVK• Internal splices available;HISLPZTLHU[[VILHZPTWSPÄLKZWHUJOHY[MVYJVU]L`PUNNLULYHSYHPSJHWHIPSP[PLZ<ZLHWWYV]LKJLY[PÄJH[PVUSL[[LYZMVYHJ[\HSKLZPNUN\PKHUJL GODWIN ENGINEERING AND DESIGN, LLC 8378 Foxtail Loop, Pensacola, FL 32526 | (850)712-4219 | chad@godwineng.com January 6, 2022 To: St. Lucie County Building Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Re: June – Residential PV Roof Mount Installation 8612 Cobblestone Dr. Fort Pierce, FL 34945 Plan Reviewer, This letter is regarding the installation of a new roof mounted Solar PV System on the existing residential structure at the address above. I have reviewed the attachment plan and have determined that the roof mounted PV system is in compliance with the applicable sections of the following Codes as amended and adopted by the jurisdiction: 2020 Florida Building Code 7th Edition, FBC ASCE 7 Min. Design Loads for Buildings & Other Structures Per 2020 FBC, the Roof Mounted PV system will be subject to the following design criteria: Design Wind Speed(Vult) - 160mph 3sec gust, Exposure Category – B The PV System consist of the modules, railing, and connection hardware. The system will add a dead load of approximately 3 psf to the roof. The existing roof covering is Asphalt Shingle with min. ½” plywood decking and 2” x 4” roof trusses 24” O.C. The roofing, decking, and roof trusses are in good condition. The existing structure will be adequate for supporting the additional PV dead load and wind loads. The securement method of the PV system is to be flush mounted to the asphalt shingle roof with the Ironridge railing and flashings/attachments. The attachments can be attached up to 72” apart in roof zones 1, 2e, 2r, & 3. The mounts should be staggered, where possible, to allow distribution of the design loads evenly to the structure. The mounts shall be installed with a min. 5/16” lag screw with minimum 2-5/16” thread length. Please see attached documents and contact me should you have any questions. Sincerely, D. Chad Godwin, PE 81360 Exp. 02/28/2023 Risk Category II Table 1.5-1 Wind Speed (asd)124 mph FRC R301.2.1.3 Basic Wind Speed (Ult)160 mph Figure 26.5-1B Effective Wind Area 19.66 ft2 26.20 Roof Angle Wind Directionality Kd 0.85 Table 26.6-1 Roof Type Hip Topographic factor Kzt 1.00 26.8 or 26.8.2 Exposure Cat.B,C, or D B Section 26.7 Ground Elevation Factor Ke 1.00 Table 26.9-1 Mean Roof Height h 15.00 ft Velocity Exposure Coefficient Kz 0.70 Table 26.10-1 Roof attachment Array Edge Factor gE 1.50 29.4.4 *Modules are considered Exposed Rafter/Truss Spacing 24 in O.C.Solar Panel Equalization Factor ga 0.68 Fig. 29.4-8 No. of Rails 2 Velocity Pressure qh 23.40 psf qh=0.00256 KzKztKdKeV2 No. of Modules - Portrait 24 Added Safety Factor 1.2 No. of Modules - Landscape 0 Allowable Pullout per mount 859.2 lbs Module Model Number 0.4h or 0.6h 6.00 ft Flat - 0.6h, Gable, Hip - 0.4h bldg. least horizontal dim (typ.)360 in 10% of least horizontal dim 3.00 ft Elevation <1000 ft Roof Zone Set Back a 3.00 ft Est. # of attachment points 34 h2 5 in Not > 10in(panel height above roof) 2h2 10 in *min distance array shall be from the roof edge, Gable Ridge, or hip ridge 24 0.25 in min gap between all panels but not > 6.7ft Wmod 45 lbs 3.41 ft d1 1.00 ft Horizontal distance orthogonal to panel edge Wmods 1085 lbs 5.76 ft d2 0.25 ft Horizontal distance from edge of one panel to the nearest edge in the next row Wmic 96 lbs 19.66 ft2 0.5h 7.50 ft *modules are considered exposed that are within 1.5Lp from roof edge WPV rail 18 lbs Wtotal 1198 lbs Ultimate Allowable AT 471.93 ft2 113.4 75.6 Eq.1 Point Load = Roof Zone psf * TA DPV 2.54 psf -113.4 -75.6 Eq.2 TA = (Module Length /2) * Max Span Weight/attachment 35.2 lbs Eq.3 *Max span Equation, SF = Allowable pullout / Point Load Eq.4 Max Span = Allowable Pullout / (SF * Roof Zone psf * L/2) 1 2e 2r 3 0 0 a) GCp - Uplift -1.3 -1.8 -1.8 -1.8 #N/A #N/A GCp - Down 0.7 0.7 0.7 0.7 #N/A #N/A b)Allowable Module load ratings are determined by SF = 1.5 p = qh(GCp)(gE)(γa)-28.6 -40.6 -40.6 -40.6 #N/A #N/A psf 29.4-7 p = qh(GCp)(gE)(γa)16.8 16.8 16.8 16.8 #N/A #N/A psf 29.4-7 Max Allowable Span 6 6 6 6 #N/A #N/A ft *notes Max Cantilever (in)24 24 24 24 #N/A #N/A Max span * 33% (in) ASCE 7-16 CHAPTER 29 WIND LOADS - Rooftop Solar Panels Minimum Design Loads - Part 1: Enclosed(Gable,Hip,Flat h<60ft, 0°<θ<45°) Notes PV Attachment - Results Total Weight Total Area Dead Load Array Width Micro/optimizer Length PV Rail Module Area PV Dead Load Module and Racking Specs # of Modules The Max span between attachment points must not exceed the rail spans provided by racking manufacture. Wind Load Paramaters 21° to 27° DNA-120-MF26 Roof Zones - Hip 21° to 27° 10% of least hor. Dim. Or 0.4h, whichever is smaller, but not less than either 4% of Least hor. Or 3ft. (flat roof - 0.6h) Module Dimensions, LxWxH (in) Load Rating - Snow(psf) Load Rating - Wind(psf) Wind Load Parameters - Inputs 5/16" x 4.75" Lag Screw 69.13 x 40.9 x 1.37 Module load ratings