Loading...
HomeMy WebLinkAboutFPUA CUSTOMER INVOICEFort Pierce Utilities Authority "Committed To Quality" Water/Wastewater Engineering 206 South 6th Street Ft. Pierce, FL 34950 CUSTOMER INVOICE QUOTE FOR : ALONZO LAW OFFICES PA (EDMOND ALONZO) Phone (772) 466-1600 Fax (772)461-1938 JOB DESCRIPTION: INSTALL 5/8 X 3/4" WATER METER ONLY, NO SEWER I��iLN.qlfr6�EE���I��I�tEFIEE€Y�IIii1E�tIiIIIIFIEEIIEIit��I���IIIIttIIRINEI�i P � �� � ���v�� ����� �� � I��IiEIE�E�IIXIE{i�I�EE9� Itl�Yd1�lE�EEEilI1H�I�iEEItNI.IiEiESl�ll�llid!!II{IEI<!I€!IIIEIEHFIIII�llttll�lElltiillilil.liEER�t�Ilili�������IIEFflN4E�11lIIEEtt�E��I�E�Iti�Il€� ��IEIRfEf� INVOICE NO: LOCATION ID: ADDRESS: ADDITIONAL INFO: Service Order No. SORD00004412211 71192400 2564 NAVAJO AV FORT PIER( PREPARED BY: JOHNSONCH Charges W-CAP IM CHG WATER CAPITAL IMPROVE CHARGE $0.01 $1,850.00 W-CON FEE EXIST WTR CONNECT FEE NEW OUST $0.01 $20.00 W-3/4 MTR U/G WATER 3/4 METER ONLY U/G $250.00 $250.00 Posted Sub Total $Q.11a Unposted Sub total $2,120.00 Service Sub Total $2,12000 Posted Total $0.00 unoosted Total $2,120.00 Grand Total $2,120.00 Customers will be assessed wastewater charges the day they connect to the wastewater system or within 365 days from date wastewater Connection Charge is paid - whichever is first. The cost of the service line from the point of delivery at the property line to the house/building is the responsibility of the customer and is not included in this invoice . State laws require that a permit_ from the Health Department must be obtained prior to initiating a septic tank abandonment. Contact the Health Department at (772) 873-4931. Construction cost estimates are based on current labor, equipment and material prices . Actual costs of construction will be determined at the completion of the project . Should unforeseen circumstances be encountered during construction , including but not limited to adverse weather conditions and construction conflicts , the customer will be responsible for increased costs . Additional costs incurred by the customer shall not exceed fifteen ( 15 ) percent of the total estimated construction costs shown above . Estimated costs paid by the customer that exceed the actual cost of construction will be refunded by Fort Pierce Utilities Authority.All fees are due prior to any construction. Note: Please submit accepted Customer Invoice to Customer Service at 206 South 6th Street, Ft. Pierce, FL 34950 or call (772) 466-1600 to setup account. Customer Signature: Printed Name: Date: PAGE 1 OF 1 PRINTED ON: 01/04/2022 AT 08:19 AM