Loading...
HomeMy WebLinkAboutAir Barrier & Insulation Inspection0 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIAa Projdct Name: Model H4 -51 Paleo 11-24-2021 Builder Name: HQ Construction Street: 5206 Paleo Circle Permit Office: city, IS Zip: Fort Pierce, FL, 34951 Permit Number: Y Owner: HQ Construction Jurisdiction: 0 Design Location: FL, ST LUCIE_CO_INTL County: St. Lucie(Florida Climate Zone 2) _ I U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA Genefal A continuous air barrier shall be installed in the building envelope Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the ai- barrier shall be sealed. The air barrier in any drepped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit Ceiling/attic the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. + Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within comers and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity with sealed. a material having a thermal resistance of R-3 per Knee walls shall be sealed. inch minimum Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (inclutling insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and c ntilevered shall be permitted to be in contact with the top side floors of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered Where provided instead of floor insulation, insulation with a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls Shafi , penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Narrgiro cavities Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Gara a separation Air sealing shall be prov:ded between the garage and conditioned spaces. Recej sed lighting Recessed light fixtures installed in the building thermal Recessed light fixtures installed in the building envelope shall be sealed to the finished surface. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind piping and wiring. Shower/tub The air barrier installed at exterior walls adjacent to showers Exterior walls adjacent to showers and tubs shall on exterior wall and tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box The air barrier shall be installed behind electrical or on exterior walls communication boxes or air -sealed boxes shall be installed. HVA G register boot HVAC supply and returr register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or ceiling penetrated by the boot. Concealed When required to be sealed, concealed fire sprinklers shall only sprinklers be sealed in a manner that is recommended by the manufacturer Caulking or other adhesive sealants shall not be used to fill voids voids between fire sprinkler cover plates and walls or ceilings. a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 11/2 12021 12:29:12 PM EnergyGauge® USA 7.0 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1