HomeMy WebLinkAboutEnvelope Leakage Test ReportEnvelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2020 Florida Building Code, Energy Conservation, 7th Edition
Jurisdiction:
Permit #:
1
J6JInforinati0
n
Builder:
HQ Construction
Community: Lot: NA
Address:
5206 Paleo Circle
r
City:
Fort Pierce State: FL Zip: 34951
Air�Leakag@;Test
Results Passing results must meet either the Performance, Prescriptive, orERl Method
C
" PRESCRIPTIVE METHOD -The building or dwelling unit shall be tested_and verified as having an air leakage rate of not exceeding 7 air
-
changes per hour at a pressureof 0.2 inch w.g.: (50 Pascals) in Climate Zones 1 and 2 -
�PERFORMANCE
or ERI METHOD -The buildin or"duvellin und'shall'be tested and verified as having an air leakage rate of not exceedin
." 9 9 g. g... g'
-the
f
selected ACH(50) value, as.shown on Form 4405-2020 (Performarice) or R4&-2020 (ERI), section labeled as'iinfiltratlon; sub -section ACH50.
ACH(50) specifiedon Form R405-2020-Energy Calc fPerfommance) orR406-2020.(ERI) 6.700
w
x 60 _ 15880 — Method for calculating building volume:
CFM(50) Building Volume ACH(50)
O Retrieved from architectural plans
PASS • Code software calculated
When ACH(50) is less than 3, Mechanical Ventilation installation .O Field measured and calculated
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSURESNEDICC 380`and reported at a pressure of 6.2 inch w.g. (50-Pascals)
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or ihdividuals. licensed as setforth in Section
489.i105(3)(f), (g), or (i) or an approved third party. A written report of the'results of the test shall be signed by the party conducting the test and
provided to thecode ofrciat Testing shall be performed at any time after creation of all penetrations of the budding thermal envelope.
During testing;
1 _ Exterior windows and doors, fireplace and stove boors shall be closed, but not sealed, beyond the,intended weatherstripping orother infiltration
co_ntroi measures.
2_ D'ampers including exhaust, intake, makeup air, back.draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
i
measures.
3. Interior doors, if installed at the time of the test; shall be open.
4. Exterior doors for.continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be tumed off.
6. Supply and return` registers, If installed.at the time of the test, shall be fully open.
i ' _ -
Company Name: Phone: -
I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
Issuing Authority:
License/Certification #:
11/24/2021 12:29:25 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1
i