Loading...
HomeMy WebLinkAboutAPPROVED Signed Energy CodeFORM R405-2020 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2020 Florida Building Code, Energy Conservation via the Residential Simulated Performance Alternative shall include: ❑ This checklist ❑ Form R405-2020 report ❑ Input summary checklist that can be used for field verification (usually four pages/may be greater) ❑ Energy Performance Level (EPL) Display Card (one page) ❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 ❑ Mandatory Requirements (five pages) Required prior to CO: ❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page) ❑ A completed 2020 Envelope Leakage Test Report (usually one page); exception in R402.4 allows dwelling units of R-2 Occupancies and multiple attached single family dwellings to comply with Section C402.5 ❑ If Form R405 duct leakage type indicates anything other than 'default leakage", then a completed 2020 Duct Leakage Test Report - Performance Method (usually one page) 8/10/2021 10:16:11 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 71h Edition (2020) Compliant Software Page 1 of 1 FORM R405-2020 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: 5406 Birch Dr PSL Prop Street: 5406 Birch or City, Stale, Zip: Fort Pierce , FL , 34982 Owner: Key Largo Spec Home (LHF) Design Location: FL, ST_LUCIE_CO_INTL 1. New construction or existing New (From Plans) 2. Single family or multiple family Detached 3. Number of units, if multiple family 1 4. Number of Bedrooms 4 5. Is this a worst case? Yes 6. Conditioned floor area above grade (ft2) Conditioned floor area below grade (ft2) 7. Windows(215.2 sqft.) Description a. U-Factor: Dial, U=0.58 SHGC: SHGC=0.24 b. U-Factor: Dbl, U=0.62 SHGC: SHGC=0.22 a U-Factor: Dbl, U=0.65 SHGC: SHGC=0.21 Area Weighted Average Overhang Depth: Area Weighted Average SHGC: 8. Skylights a U-Factor:(AVG) N/A SHGC(AVG): N/A 9. Floor Types (1801.1 sgft.) Glass/Floor Area: 0.119 Area 128.69 ft2 46.50 ft2 40.00 ff2 3.487 ft. 0.230 Area ft2 Builder Name: PSL Prop Permit Office: Permit Number: Jurisdiction: St. Lucie County: St. Lucie (Florida Climate Zone 2 ) 10. Wall Type>1709.8 sgft.) a. Concrete Block - Exl Insul, Exterior b. Frame - Wood, Adjacent c. N/A d. N/A it. Ceiling Types (1801.0 sgft.) a. Under Attic (Vented) b. N/A c. N/A 12. Ducts a. Sup: Attic, Ret: Attic, AH: Garage 13. Cooling systems a. Central Unit 14. Heating systems a. Electric Strip Heat 15. Hot water systems a. Electric Insulation Area R=0.0 1801.10 ft2 b. Conservation features R= ft2 None R= ft2 16. Credits Total Proposed Modified Loads: 58.46 Total Baseline Loads: 58.90 I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code. PREPARED BY: C / �'zo DATE: 8 012021 I hereby Builder Name: PSL Prop Permit Office: Permit Number: Jurisdiction: St. Lucie County: St. Lucie (Florida Climate Zone 2 ) 10. Wall Type>1709.8 sgft.) a. Concrete Block - Exl Insul, Exterior b. Frame - Wood, Adjacent c. N/A d. N/A it. Ceiling Types (1801.0 sgft.) a. Under Attic (Vented) b. N/A c. N/A 12. Ducts a. Sup: Attic, Ret: Attic, AH: Garage 13. Cooling systems a. Central Unit 14. Heating systems a. Electric Strip Heat 15. Hot water systems a. Electric Insulation Area R=0.0 1801.10 ft2 b. Conservation features R= ft2 None R= ft2 16. Credits Total Proposed Modified Loads: 58.46 Total Baseline Loads: 58.90 I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code. PREPARED BY: C / �'zo DATE: 8 012021 I hereby certify that this building, as sign Is in with the Florida Energy Code. - OWNE DATE: Review of the plans and specifications covered by this calculation indicates compliance with the Florida Energy Code. Before construction is completed this building will be inspected for compliance with Section 553.908 Florida Statutes. BUILDING OFFICIAL: DATE: R Insulation R=4.1 R=11.0 R= R= In R=30.0 R= = Area 1453.30 ft2 256.50 ft2 ft2 ft2 Area 1801.00 ft2 ft2 ft2 R ft2 6 718 kBtu/hr Efficiency 35.0 SEER:16.00 kBiu/hr Efficiency 27.0 COP:1.00 Cap: 50 gallons EF: 0.960 Pstat PASS - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2). 8/10/2021 10:16 AM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7lh Edition (2020) Compliant Software Page 1 of 6 FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: 5406 Birch Dr PSL Prop Bedrooms: 4 Address Type: Street Address Building Type: User Conditioned Area: 1801 Lot # Owner Name: Key Largo Spec Home (LHF) Total Stories: 1 Block/Subdivision: # of Units: 1 Worst Case: Yes PlatBook: Builder Name: PSL Prop Rotate Angle: 0 Street: 5406 Birch Dr Permit Office: Cross Ventilation: No County: St. Lucie Jurisdiction: St. Lucie Whole House Fan: No City, State, Zip: Fort Pierce , Family Type: Detached FL; 34982 New/Existing: New (From Plans) Comment: CLIMATE Design Temp Inl Design Temp Heating Design Daily Temp Design Location TMY Site 97.5 % 2.5 % Winter Summer Degree Days Moisture Range FL, ST_LUCIE_CO_INTL FL_VERO_BEACH_MUNI 39 90 70 75 299 58 Medium BLOCKS Number Name Area Volume 1 Entire House 1801 15774 SPACES Number Name Area Volume Kitchen Occupants Bedrooms Infil ID Finished Cooled Heated 1 Laundry 36 288 No 0 1 Yes Yes Yes 2 Bed 2 136 1088 No 0 1 1 Yes Yes Yes 3 Bath 42 336 No 0 1 Yes Yes Yes 4 Bath 2 51 408 No 0 1 Yes Yes Yes 5 Hall 30 240 No 0 1 Yes Yes Yes 6 Bed 3 153 1224 No 0 1 1 Yes Yes Yes 7 Bed 4 157 1256 No 0 1 1 Yes Yes Yes 8 Foyer GR 426 4047 No 3 1 Yes Yes Yes 9 Pantry 14 112 No 0 1 Yes Yes Yes 10 Kitchen DR 411 3904.5 Yes 2 1 Yes Yes Yes 11 Master Bath 95 760 No 0 1 Yes Yes Yes 12 Hers 20 160 No 0 1 Yes Yes Yes 13 His 9 72 No 0 1 Yes Yes Yes 14 Master Bed 221 1878.5 No 0 1 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab -On -Grade Edge Insulatio Laundry 5.5 ft 0 35.8 ft' ____ 1 0 0 2 Slab -On -Grade Edge Insulatio Bed 2 24 ft 0 135.8 ft' ____ 1 0 0 3 Slab -On -Grade Edge Insulatio Bath 1 ft 0 42 ft' ---- 1 0 0 4 Slab -On -Grade Edge Insulatio Bath 2 6 ft 0 51 ft' ____ 1 0 0 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7lh Edition (2020) Compliant Software Page 2 of 6 onnr; oMn IAIDMEMOI IT CI IMMARV RHF(:KI IRT RPPnRT FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 5 Slab -On -Grade Edge Insulatio Hall 1 It 0 29.8 ft2 ____ 1 0 0 6 Slab -On -Grade Edge Insulatio Bed 3 25.5 ft 0 153.3 ft2 ____ 1 0 0 7 Slab -On -Grade Edge Insulatio Bed 4 21 ft 0 157 ft2 ---- 1 0 0 8 Slab -On -Grade Edge Insulatio Foyer GR 34.5 ft 0 426.3 ft2 ---- 1 0 0 9 Slab -On -Grade Edge Insulatio Pantry 1 ft 0 13.8 ft2 ____ 1 0 0 10SIab-On-Grade Edge Insulatio Kitchen DR 28 ft 0 410.5 It' ____ 1 0 0 11Slab-On-Grade Edge Insulatio Master Bath 19.5 ft 0 94.5 ft2 ____ 1 0 0 12SIab-On-Grade Edge Insulatio Hers 4 ft 0 20 W ____ 1 0 0 13SIab-On-Grade Edge Insulatio His 1 ft 0 8.9 ft2 ---- 1 0 0 14SIab-On-Grade Edge Insulatio Master Bed 31.9 ft 0 222.4 ft2 ____ 1 0 0 ROOF / Roof Gable Roof Red Solar SA Emitt Emitt Deck Pitch V If Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 Hip Metal 2014 ft2 0 ft2 Unfnishe N 0.3 No 0.7 No 0 26.57 ATTIC / V # Type Ventilation Vent Ratio (1 In) Area RBS IRCC 1 Full attic Vented 150 J801 ft2 N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Free Truss Type 1 Under Attic (Vented) Laundry 30 Blown 36 ft2 0.1 Wood 2 Under Attic (Vented) Bed 2 30 Blown 136 ft' 0.1 Wood 3 Under Attic (Vented) Bath 30 Blown 42 ft2 0.1 Wood 4 Under Attic (Vented) Bath 2 30 Blown 51 ft2 0A Wood 5 Under Attic (Vented) Hall 30 Blown 30 R2 0.1 Wood 6 Under Attic (Vented) Bed 3 30 Blown 153 ft2 0.1 Wood 7 Under Attic (Vented) Bed 4 30 Blown 157 ft2 0.1 Wood 8 Under Attic (Vented) Foyer GR 30 Blown 426 ft2 0.1 Wood 9 Under Attic (Vented) Pantry 30 Blown 14 ft2 0.1 Wood 10 Under Attic (Vented) Kitchen DR 30 Blown 411 ft2 0.1 Wood 11 Under Attic (Vented) Master Bath 30 Blown 95 ft2 0.1 Wood 12 Under Attic (Vented) Hers 30 Blown 20 ft2 0.1 Wood 13 Under Attic (Vented) His 30 Blown 9 W 0.1 Wood 14 Under Attic (Vented) Master Bed 30 Blown 221 ft2 0.1 Wood 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7lh Edition (2020) Compliant Software Page 3 of 6 FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT WALLS Adjacent Cavity Width Height Sheathing Framing Solar Below Space _ R-val P Fractia nbsor�Gra 1 SE Garage Frame - Wood Laundry 11 5 6 8 0 44.0 ft' 0 0.25 0.8 0 _ 2 SW Exterior Concrete Block - Ext Insul Bed 2 4.1 10 6 8 0 84.0 W 0 0 0.3 0 3 SE Garage Frame - Wood Bed 2 11 13 6 8 0 108.0 ft' 0 0.25 0.8 0 _ 4 SW Exterior Concrete Block - Ext Insul Bath 2 4.1 6 0 8 0 48.0 ft' 0 0 0.3 0 5 SW Exterior Concrete Block - Ext Insul Bed 3 4.1 13 6 8 0 108.0 ft' 0 0 0.3 0 _ 6 NW Exterior Concrete Block - Ext Insul Bed 3 4.1 12 0 8 0 96.0 ft' 0 0 0.3 0 _ 7 NE Exterior Concrete Block - Ext Insul Bed 4 4.1 8 0 8 0 64.0 ft' 0 0 0.3 0 8 NW Exterior Concrete Block - Ext Insul Bed 4 4.1 13 0 8 0 104.0 ft' 0 0 0.3 0 _ 9 SE Exterior Concrete Block - Ext InsuFoyer GR 4.1 23 6 9 6 223.3 W 0 0 0.3 0 10 SW Garage Frame - Wood Foyer GR 11 11 0 9 6 104.5 ft' 0 0.25 0.8 0 _ 11 NE Exterior Concrete Block - Ext InsJkitchen OR 4.1 7 6 9 6 71.3 ft' 0 0 0.3 0 12 NW Exterior Concrete Block - Ext InsJkitchen DR 4.1 20 6 9 6 194.8 ft' 0 0 0.3 0 13 NE Exterior Concrete Block - Ext InsMaster Bath 4.1 9 0 8 0 72.0 ft' 0 0 0.3 0 14 NW Exterior Concrete Block- Ext InsMaster Bath 4.1 10 6 8 0 84.0 ft' 0 0 0.3 0 15 NE Exterior Concrete Block - Ext Insul Hers 4.1 4 0 8 0 32.0 ft' 0 0 0.3 0 _ 16 NE Exterior Concrete Block - Ext InsMaster Bed 4.1 15 6 8 6 131.8 ft' 0 0 0.3 0 17 SE Exterior Concrete Block - Ext InsMaster Bed 4.1 13 6 8 6 114.8 ft' 0 0 0.3 0 18 SW Exterior Concrete Block - Ext InsMMaster Bed 4.1 3 0 8 6 25.5 ft' 0 0 0.3 0 WINDOWS Orientation shown is the entered orientation => chan ad to Worst Case. / Wall Overhang V # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening 1 SW 2 Metal Low-E Double Yes 0.58 0.24 Y 15.5 ft' 1 ft 0 in 1 ft 0 in Drapes/blinds Exterior 5 2 SW 4 Metal Low-E Double Yes 0.58 0.24 Y 6.5 W 1 ft 0 in 1 ft 0 in Drapes/blinds Exterior 5 3 SW 5 Metal Low-E Double Yes 0.58 0.24 Y 15.5 ft' 1 ft 0 in 1 It 0 in Drapes/blinds Exterior 5 4 NW 6 Metal Low-E Double Yes 0.58 0.24 Y 15.5 ft' 1 ft 0 in 1 ft 0 in Drapes/blinds Exterior 5 5 NW 8 Metal Low-E Double Yes 0.58 0.24 Y 15.5 ft' 1 It 0 in 1 ft 0 in Drapes/blinds Exterior 5 6 SE 9 Metal Low-E Double Yes 0.62 0.22 Y 31.0 W 1 ft 0 in 1 ft 0 in Drapes/blinds Exterior 5 7 SE 9 Metal Low-E Double Yes 0.58 0.24 Y 40.0 ft' 4 ft 8 in 1 ft 0 in Drapes/blinds Exterior 5 8 NW 12 Metal Low-E Double Yes 0.58 0.24 Y 15.5 T 8 ft 0 in 1 It 0 in Drapes/blinds Exterior 5 9 NW 12 Metal Low-E Double Yes 0.65 0.21 Y 40.0 ft' 8 ft 0 in 1 ft 0 in Drapes/blinds Exterior 5 10 NW 14 Metal Low-E Double Yes 0.58 0.24 Y 4.7 ft' 1 ft 0 in 1 ft0 in Drapes/blinds Exterior 5 11 SE 17 Metal Low-E Double Yes 0.62 0.22 Y 15.5 ft' 1 It 0 in 1 ft 0 in Drapes/blinds Exterior 5 GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation 1 382.8 ft' 382.8 ft' 64 it 8 ft 1 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edillon (2020) Compliant Software Page 4 of 6 FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000278 1314.5 72.12 135.39 .0936 5 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Strip Heal/ None COPA 27.04 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/ Split Singl SEER: 16 35 kBtu/hr 1050 cfm 0.85 1 sys#1 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SelPnt Conservation 1 Electric None Garage 0.96 50 gal 62.3 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Cart # Company Name Collector Storage System Model # Collector Model # Area Volume FEF None None ff' DUCTS / # ---- Supply ---- Location R-Value Area ---- Return ---- Air CFM 25 CFM25 Location Area Leakage Type Handler TOT OUT ON RLF HVAC # Heat Cool 1 Attic 6 718 ft' Attic 718 fl' Default Leakage Garage (Default) (Default) i 1 TEMPERATURES Programabl[e jThermostajjt:jjY j Healing I Jan [JC] Feb [X Mar Venting (1 Jan [I 11 Feb (X Mar rNovrXj] j ] Cr[eij]ling Fans: [ ] [ ] [ j (j L 1 Apay [ ] May �Xl Jun EX] Jul [X] Aug lXl Sep Oct [X Nov tnJ Jun 1 Jul L 1 Aug l 1 Sep Dee [ [ ] Dec 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7ih Edition (2020) Compliant Software Page 5 of 6 FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating (WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating (WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ft' 0 ft 0.3 Laundry Default(8 Ibs/sq.ft, ft' ft 0.3 Bed 2 Default(8 lbs/sq.ft. ft' ft 0.3 Bath Default(8 Ibs/sq.ft. ft' ft 0.3 Bath 2 Default(8 lbs/sq.ft, ft2 ft 0.3 Hall Default(8 Ibs/sq.ft. W ft 0.3 Bed 3 Default(8 Ibs/sq.ft. ft' ft 0.3 Bed 4 Default(8 lbs/sq.ft. ft' ft 0.3 Foyer GR Default(8 lbs/sq.ft, ft' it 0.3 Pantry Default(8 Ibs/sq.ft. ft' ft 0.3 Kitchen DR Default(8 Ibs/sq.ft. ft' It 0.3 Master Bath Default(8 lbs/sq.ft. ft' ft 0.3 Hers Default(8 lbs/sq.ft. ft' ft 0.3 His Defaultf8 Ibs/sq.ft. ft' ft _ 0.3 Master Bed 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 6 of 6 FORM R405-2020 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 99 The lower the EnergyPerformance Index, the more efficient the home. 5406 Birch Dr, Fort Pierce, FL, 34982 1. New construction or existing New (From Plans) 10. Wall Type and Insulation Insulation Area 2. Single family or multiple family Detached a. Concrete Block - Insul, Exterior R=4.1 15.0 ft' b. Frame -Wood, Adjacent 2 cent R=11.0 56.50 ft' 3. Number of units, if multiple family 1 c. N/A R= ft' 4. Number of Bedrooms 4 J. N/A R= ft' 11. Ceiling Type and insulation level Insulation Area 5. Is this a worst case? Yes a. Under Attic (Vented) R=30.0 1801.00 ft' 6. Conditioned Floor area (ft') 1801 b. N/A R= ft' c. N/A R= ft' 7. Windows** Description Area a. U-Factor: Dbl, U=0.58 128.69 ft' 12. Duds, location &insulation level R a. Sup: Attic, Ret: Attic, AH: Garage 6 71818 SHGC: SHGC=0.24 b. U-Factor: Dbl, U=0.62 46.50 ft' SHGC: SHGC=0.22 13. Cooling systems kBlu/hr Efficiency c. U-Factor: Dbl, U=0.65 40.00 ft' a. Central Unit 35.0 SEER:16.00 SHGC: SHGC=0.21 d. U-Factor: N/A ft` 14. Heating systems kBtu/hr Efficiency SHGC: a. Electric Strip Heat 27.0 COP:1.00 Area Weighted Average Overhang Depth: 3.487 ft. Area Weighted Average SHGC: 0.230 8. Skylights Description Area 15. Hot water systems Cap: 50 gallons a. U-Faclor(ANG): - N/A ftz a. Electric EF: 0.96 SHGC(AVG): N/A b. Conservation features 9. Floor Types Insulation Area None a. Slab -On -Grade Edge Insulation R=0.0 1801.10 ft° Credits (Performance method) Pstal b. N/A R= ft2 c. N/A R= ft' I certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the above energy saving features which will be installed (or exceeded) n this home before final inspection. he ise, a ne PL Display Card will be completed based on installed Code compli fe es. Builder Signature: ^� Date: � ai Address of New Hom sw(p City/FL Zip: 3�Sa *Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. **Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRe82020 FBC 7th Edition (2020) Compliant Software Page 1 of 1 Florida Building Code, Energy Conservation, 7th Edition (2020) Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods ADDRESS: 5406 Birch Dr Fort Pierce , FL , 34982 Permit Number: MANDATORY REQUIREMENTS - See individual Code Sections for full details. SECTION R401 GENERAL R401.3 Energy Performance Level (EPL) display card (Mandato11 building official shall require that an energy performance level (EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law ❑ (Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components Installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD. SECTION R402 BUILDING THERMAL ENVELOPE ❑ R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.4.1 through R402,4.5. Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to comply with Section C402.5. ❑ R402.4.1 Building thermal envelopeThe building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing methods between dissimilar materials shall allow for differential expansion and contraction. ❑ R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of construction. Where required by the code official, an approved third party shall inspect all components and verify compliance. ❑ R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing buildings in which the new construction is less than 85 percent of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, buf not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if Installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. ❑ R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting Flue dampers or doors, and outdoor combustion air. Where using light -fitting doors on factory -built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed for the fireplace. Where using tight -fitting doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907. ❑ R402.4.3 Fenestration air leakage. Windows, skylights and sliding glass doors shall have an air Infiltration rate of no more than 0.3 cim per square foot (1.5 L/slm2), and swinging doors no more than 0.5 cfm per square fool (2.6 L/s/m2), when tested according to NFRC 400 or AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer. Exception: Site -built windows, skylights and doors. 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 5 MANDATORY REQUIREMENTS - (Continued) R402AA Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8. Exceptions: 1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential. R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not more than 2.0 cfm (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. SECTION R403 SYSTEMS R403A Controls. ❑ R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls that, except during defrost, prevent supplemental heal operation when the heat pump compressor can meet the heating load. R403.3.2 Sealing (Mandatory) All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed in accordance with Section C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. Duct tightness shall be verffed by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes, to be "substantially as free' in accordance with Section R403.3.3. R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of the design airflow rate when tested in accordance with ASHRAE 193. R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods: 1. Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 Inch w.g. (25 Pa) across the system, including the manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test. 2. Postconstruction lest: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire system, including the manufacturers air handler enclosure. Registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. 2. Duct testing is not mandatory for buildings complying by Section 405 of this code. Duct leakage testing is required for Section R405 compliance where credit Is taken for leakage, and a duct air leakage on to the outside of less than 0.080 (where on = duct leakage to the outside In cfm per 100 square feet of conditioned floor area tested at 25 Pascals) is indicated in the compliance report for the proposed design. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums. R403.4 Mechanical system piping Insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41 °C) or below 557 (13°C) shall be insulated to a minimum of R-3. ri R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause degradation of the material. Adhesive tape shall not be permitted. R403.5A Heated water circulation and temperature maintenance systems (Mandatory). If heated water circulation systems are El installed, they shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible. ❑ R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe shall be a dedicated return pipe or a cold water supply pipe. Gravity and lhermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy. The controls shall automatically turn off the pump when the water In the circulation loop is at the desired temperature and when there is no demand for hot water. R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems shall El automatically adjust the energy Input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water Is used in the occupancy. 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7lh Edition (2020) Compliant Software Page 2 of 5 MANDATORY REQUIREMENTS - (Continued) ❑ R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the Inlets and outlets. External heal traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3 % inches (89 mm) in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.5.6 Water heater efficiencies (Mandatory). ❑ R403.5.6.1.1 Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature setting range shall be from 100OF to 140OF (38°C to 60°C). ❑ R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s) of combustion types of service water -heating systems to be turned off. ❑ R403.5.6,2 Water -heating equipment. Water -healing equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1. ❑ R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors, and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar water -heating systems should meet the following criteria: 1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and 2. Be installed at an orientation within 45 degrees of true south. ❑ R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. ❑ R403.6.1 Whole -house mechanical ventilation system fan efficacy.When installed to function as a whole -house mechanical ventilation system, fans shall meet the efficacy requirements of Table R403.6.1. Exception: Where an air handler that is integral to tested and listed HVAC equipment is used to provide whole -house mechanical ventilation, the air handler shall be powered by an electronically commutated motor. ElR403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation shall meet the following criteria: 1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable Indoor Air Quality, shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics, crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10 otherwise. R403.7 Heating and cooling equipment. R403.7.1 Equipment sizing (Mandatory). Heating and cooling equipment shall be sized in accordance with ACCA Manual S based ❑ on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor units (If split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described In Section R302.1, This Code does not allow designer safety factors, provisions for future expansion or other factors that affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems, New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed. TABLE R403.6.1 WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM (CFM) MINIMUM EFFICACY a (CFM/WATT) AIRFLOW RATE MAXIMU (CFM) HRV or ERV Any 1.2 cm/waft Any Range hoods Any 2.8 cfm/watt Any In -line fan Any 2.8 cfm/watt Any Bathroom, utility room 10 1.4 cfm/watt <90 Bathroom, utility room 90 2.8 cfm/watt Any For SI: icfm = 28.3 L/min. a. When tested in accordance with HVI Standard 916 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 3 of 5 MANDATORY REQUIREMENTS - (Continued) ❑ R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section R403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the equipment shall not be less than the calculated latent load. The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturers expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature. Design values for entering wet -bulb and dry-bulb temperatures shall be for the Indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space. Exceptions: 1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by aFlorida-registered engineer, in attached single- and multiple -family units, the capacity of equipment may be sized in accordance with good design practice. R403.7.1.2 Heating equipment capacity. ❑ R403.7.1.2.1 Heat pumps. Heal pump sizing shall be based on the cooling requirements as calculated according to Section R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if the design heating load is 1.15 times greater than the design cooling load. ❑ R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.7.1. R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural dmff atmospheric burners shall not be less than the design load calculated in accordance with Section R403.7.1. ❑ R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or healing system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections ❑ C403 and C404 of the Florida Building Code, Energy Conservation —Commercial Provisions in Ileu of Section R403. ❑ R403.9 Snow melt and ice system controls (Mandatory) Snow- and Ice -melting systems, supplied through energy service to the building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50"F (10°C), and no precipitation Is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40OF (4.8'C). ❑ R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas shall be in accordance with Sections R403.10.1 through R403.10.5. ❑ 11403.10A Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an integral part of the heater mounted on the exterior of the healer, or external to and within 3 feet (914 mm) of the heater. Operation of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the power to the heater. Gas -fired healers shall not be equipped with continuously burning ignition pilots. ❑ R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operation. 2. Pumps that operate solar- and waste -heat -recovery pool heating systems. 3. Where pumps are powered exclusively from on -site renewable generation. 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 4 of 5 R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at Elthe water surface or a liquid cover or other means proven to reduce heat loss. Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered energy, such as from a heal pump or solar energy source, covers or other vapor -retardant means shall not be required. R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal ❑ efficiency of 82 percent for healers manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. ❑R403.10.5 Heat pump pool heaters. as pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard. ❑R403.11 Portable spas (Mandatory). The energy consumption of electric -powered portable spas shall be controlled by the requirements of APSP-14. ❑ R403.73 Dehumidifiers (Mandatory If installed, a dehumidifier shall conform to the following requirements: 1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/ kWh if the total dehumidifier capacity for the house is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifer capacity for the house is greater than or equal to 75 pints/day. 2. The dehumidifier shall be controlled by a sensor that is installed in a location where it Is exposed to mixed house air. 3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated to a minimum of R-2. 4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential. R403.13.1 Ducted dehumidifiers. Ducted dehumidifiers shall, in addition to conforming to the requirements of Section R403.13, conform to the following requirements: 1. If a ducted dehumidifier is configured with return and supply ducts both connected into the supply side of the cooling system, a backdraft damper shall be installed in the supply air duct between the dehumidifier inlet and outlet duct. 2. If a ducted dehumidifier is configured with only its supply duct connected into the supply side of the central heating and cooling system, a backdraft damper shall be installed in the dehumidifier supply duct between the dehumidifier and central supply duct. 3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side upstream from the central cooling evaporator coil. 4. Ductwork associated with a dehumidifier located in unconditioned space shall be insulated to a minimum of R-6. SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS ❑R404.1 Lighting equipment (Mandatory). Not less than 90 percent of the lamps in permanently installed luminaires shall have an efficacy of at least 45 lumens -per -watt or shall utilize lamps with an efficacy of not less than 65 lumens -per -watt. R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights. 8/10/2021 10:16 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 5 of 5 2020 = AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: 5406 Birch Dr PSL Prop Builder Name: PSL Prop Yin Street: 5406 Birch Dr Permit Office: City, Slate, Zip: Fort Pierce , FL , 34982 Permit Number: U Owner: Key Largo Spec Home (LHF) Jurisdiction: St. Lucie w x Design Location: FL, ST_LUCIE_CO_INTL 0 COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. The air barrier In any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit Ceiling/attic the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls Walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall Include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation space walls a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls. Shafts, penetrations Dud shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled by insulation that on Narrow cavities installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as, Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the finished surface. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind tirina an wirina Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 8/10/2021 10:16 AM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2020 Florida Building Code, Energy Conservation, 7th Edition Jurisdiction: St. Lucie Permit #: Job Information Builder: PSL Prop Community: Lot: NA Address: 5406 Birch Dr City: Fort Pierce State: FL Zip: 34982 Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method O PRESCRIPTIVE METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2 Inch w.g. (50 Pascals) in Climate Zones 1 and 2. or O PERFORMANCE or ERI METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50) value, as shown on Form R405-2020 (Performance) or R406-2020 (ERI), section labeled as infiltration, sub -section ACH50. specified on Form R405-2020-Energy Cale (Performance) or R406-2020 (ERI): 5.000 x 60 + 15788 — Method for calculating building volume: CFM(50) Building Volume ACH(5O) Q Retrieved from architectural plans ❑ PASS • Code software calculated When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals) Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section 489.105(3)(f), (g), or (1) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heal recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if Installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: 8/10/2021 10:16:33 AM EnergyGauge® USA 7,0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1 PLANNING & DEVELOPMENT SERVICES DEPARTMENT Building & Code Regulations Division 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982-5652 (772) 462-1553 FILLED LAND AFFIDAVIT I, the undersigned, am the owner of the follGwing described property, 3402-609-0182-000-1, LOT 4 BLOCK 57 INDIAN RIVER ESTATES UNIT 8 Id#/Legal description/Address) for which I have applied to St. Lucie County for a Final Development Permit. In accepting this Final Development Permit, BP Number I acknowledge that as owner of the above described property, and in accordance with Section 7.04.01(D), St. Lucie County Land Development Code, I shall be responsible for assuring adequate drainage so that the immediate community WILL NOT be adversely affected. I further acknowledge that in granting this permit for the development of this property, I. Lucie County is neither obliged nor liable to provide for, or maintain in any form, adequate drainage off my property which will not adversely affect the immediate community. Property Owner Name (Please Prin[) Property Owner STATEOF FLORIDA,COUNTY ACKNOWLEDGED BEFORE ME THIS (D PRODUCED SIGNATURE OF NOTARY PUBLIC COMMISSION NUMBER SLCPDSD Revised 04/11/2011 IAY OF �I ,2U IS PHRSONALLY KNOWN TO ME r-I OR WHO HAS TYPE OR PAINT NOTARY (SEAL) AS H)ENTIFICATION. PLANNING & DEVELOPMENT SERVICES DEPARTMENT BUILDING & CODE REGULATIONS DIVISION Survey Requirements The Board of County Commissioner approved a code change that will require a copy of a current sealed survey when applying for a building permit for a primary structure or a building permit for an accessory structure with a value exceeding $10,000. This became effective July 1, 1993, The guidelines are as follows: No Building Permit shall be issued for development unless a copy of a survey of the property on which the required activity is to be permitted accompanies the application for building permit. All surveys shall demonstrate compliance with the Filled Lands Affidavit signed by the Property Owners (refer to St. Lucie County Land Development Code, Section 7.04.0 I.D.3.) and completely depict the following: I . The location of the proposed development activity. 2. The relationship of the activity under application to all adjacent property lines, and as may be required for the review of the application, all adjacent structures, improvements or natural features, including but not limited to the nearest building corners of all adjacent primary and accessory structures, pools and screened enclosures, fences, sheds, utility easements, wells, septic systems, driveways, culverts and any landscaping or existing vegetation located along the property lines. A minimum of two (2) elevations along each roadway on which the proposed activity borders, the existing ground elevation at the approximate center of the proposed structure, the existing ground elevation along the side property lines adjacent to the proposed structure, and the proposed finished floor elevation of the structure under application and finished grades for any adjacent structures noted above in item 2. The proposed finished floor elevations must be consistent with the approved Health Department On -Site Sewage Disposal System Construction Permit if on -site sewage disposal is proposed. All surveys submitted shall be prepared, signed and sealed by a Florida Registered Land Surveyor, in accordance with the provisions of Chapter 61G17-6, FAC, except those applications for interior modifications or construction, roofing permits not involving any structural alteration or additions to the area covered by the roof surface, or any other permit required activity that does not result in the expansion of any portion of the existing structures shall not be required to submit a survey. Accessory structures with a building value of less than ten thousand dollars ($10,000) shall not be required to submit a survey, but shall instead be required to submit a scaled plot plan indicating the location of the accessory structure and its compliance with minimum setback standards. Copies of original surveys meeting the above requirements may be submitted with any application for building permit, provided that the survey still depicts the accurate location of all structures and other improvements on the property. Per Florida Administrative Code Chapter 61G17-6.006, paragraph 8, additions or deletions to survey drawings by other than the signing party or parties is prohibited without written consent of the signing party or parties. SLCPDSD Rev 06/18/2010 2/9/O6 curl