HomeMy WebLinkAboutCreekside Lot 128 Code 133 011122.pdfi
OF
r' y
A Universal
�
Engineering
Y
Sciences
�ana^'r
Company
Inspection Date: ®J — ) I —2Z
Project: ✓ )- ,m,�,,b-1,C)0 D
tyCN
Address: _[ctr- >
Check one:
W Regular Inspection:
INSPECTION RESULTS
Permit No. 2-10 - C->9 90
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
p
ng
Op $Lyk
Re -inspection _
Final Building
Other Inspection Type:
Area Inspected/Code: _
ELECTRICAL
Floor
Wail I
Protection
Final Electrical
(V-Q.Q-�-Sl I&.Q-
�i l��
191-I►-22
PLUMBING
h-InRough-In
ng & TestStack
Piping & Test
WMECHAMNICALCALUnderground
& TestWater
Piping & Test
g & Testaas
Piping & Test
g & Testitorm
Piping & Test
:fixtures
Wall & Ceiline
Final
Inspection Results: If AP -Approved ❑ AE-Approved with Exceptions
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments
1.
2.
3.
4.
S.
6.
7.
Final Mechanical
❑ DA-Disallowed
C1—
Inspector's Name: _ Lic.k:
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 - (772) 924-3575 • (772) 924.3580 (fax)
www.teamefa.com