Loading...
HomeMy WebLinkAboutSite Plan Boundary Survey:I! FR,•� ri C.B. q, C.B.S. D.E. E.O.W. F.F.E. G.W.A. 3J-E,3LJI M.R.H. P.K. P.O.C. P.O.B. = WOOD POWER POLE = RIGHT—OF—WAY = TOP OF BANK = STREET LIGHT = EXISTING ELEVATION PROP. ELEIt 1, " 'Tlil DRAINAGE FLOT T- --I kN' 4 B 0 U�1\1 -DA R y UR vl-j Y I. 2. 3. 4. 5. 6. 7. SUBJECT TO APPLICABLE EASEMENTS, RIGHTS OF WAY, OR OTHER OR OTHER RESTRICTIONS OF' RECORD THE LANDS SHOWN A SEARCH OF THE PUBLIC RECORDS HAS NOT BEEN MADE BY THIS OFFICE BEARINGS SHOWN HEREON ARE 113ASED ON THE NORTH LINE OF LOT 6 #lHCH BEARS S 67020'54!' W ALL BEARINGS ARE RELATIVE THERETO ELEVATIONS SROWN HEREON AIRE BASED ON N.A.V.D. OF 1988. DESCRIPTION PROVIDED BY CLIENT OR CLIENT'S REPRESENTATIVE. PROPERTY LINS IN FLOOD ZONE 'T' AS SHOWN ON FEMA MAP 12111CGa,292 J, DATED 2/16/2012 CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL SITE PLAN INFORMATION 9 mElommaml Rim 0