Loading...
HomeMy WebLinkAboutGENERAL INFORMATION SECTION A-B-C }Vy'�L� C ST. LUCIE WORKS ��PIDU. COD L Section Af(General Information) Master Permit No. C�- l OI " �s `-' 1 Process No. 07)PY Contractors Name: License# rrc 153 UY-2 Job Address 146?5 041An1C_ r, DEL fierce �L 3��(Sl ROOF CATEGORY PLow Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles 0 Asphaltic Shingles ❑Metal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE_ ❑ New roof ❑ Repair ❑ Maintenance Reroofing ❑Recovering .ROOF SYSTEM INFORMATION Low Slope Roof Area(SF) CDO Steep Sloped Roof Area (SF) Total (SF) 4-D Section B(Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets. i - A. i I � - � 1 ST. LUCIE WORKS Section C(Low Slope Roof) Surfacing: Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment: manufacturer Zone 1':=" oc @ Lap,#Rows @ ",oc (If a component is not used,identify as"NA") Zone 1;_.._." oc @ Lap,#Rows @ °00 System Manufacturer: .00 (2(a. Zone 2:_" oc @ Lap,#Rows-0 "oc Product Approval No.: Zone 3:_.._." oc @ Lap,#Rows_ ".00 �L 5a2S�_ �.� Number of Fasteners Per Insulation Board: Design Wind Pressures,From RAS 128 Or Calculations: Zone 1 . Zone 1: Zone 2: Zone 3: Zone 1':_Zone 1: Zone 2: Zone 3: Illustrate Components Noted and Details as Applicable: Max. Design Pressure,from the specific product approval Woodblocking, Gutter, Edge Termination, Stripping, system: Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterf lashing,Coping, Etc., Deck: Indicate: Mean Roof Height, Parapet Height, Height of Base Type: ��y(.�0� Flashing,Component Material,Material'Thickness,Fastener Gauge Thickness: f.}, [� Type,Fastener Spacing or Submit Manufacturers Details that --�qe Comply with RAS 111 and Chapter 16.. Slope: i a A Anchor/Base Sheet&No.df Ply(s): (�J� Anchor/Base Sheet Fastener/Bonding Material: FT. Insulation Base Layer: Base Insultation Size and Thickness: Parapet Base Insulation Fastener/Bonding Material: Height Top Insulation Layer: Top Insulation Size and Thickness: FT. Top Insulation Fastener/Bonding Material: 161 S�ee� Mean Base Sheet(s)&No.of Ply(s): I ply Roof Base Sheet Fastener/Bonding Material: Height Ply Sheet(s)'&No.of Ply(s): j�j �6 Ply Sheet Fastener/Bonding Material: �Y`p — Top Ply: ef-c-tle^ 4J- Top Ply11Faastener/Bonding Material: