HomeMy WebLinkAboutGENERAL INFORMATION SECTION A-B-C }Vy'�L� C
ST. LUCIE WORKS ��PIDU.
COD L
Section
Af(General Information)
Master Permit No. C�- l OI " �s `-' 1 Process No.
07)PY
Contractors Name: License# rrc 153 UY-2
Job Address 146?5 041An1C_ r, DEL fierce �L 3��(Sl
ROOF CATEGORY
PLow Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles
0 Asphaltic Shingles ❑Metal Panel/Shingles ❑Wood Shingles/Shakes
❑ Prescriptive BUR-RAS 150
ROOF ROOF TYPE_
❑ New roof ❑ Repair ❑ Maintenance Reroofing ❑Recovering
.ROOF SYSTEM INFORMATION
Low Slope Roof Area(SF) CDO Steep Sloped Roof Area (SF) Total (SF) 4-D
Section B(Roof Plan)
Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains.
Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets.
i -
A.
i
I �
- � 1
ST. LUCIE WORKS
Section C(Low Slope Roof) Surfacing:
Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment:
manufacturer Zone 1':=" oc @ Lap,#Rows @ ",oc
(If a component is not used,identify as"NA") Zone 1;_.._." oc @ Lap,#Rows @ °00
System Manufacturer: .00 (2(a. Zone 2:_" oc @ Lap,#Rows-0 "oc
Product Approval No.:
Zone 3:_.._." oc @ Lap,#Rows_ ".00
�L 5a2S�_ �.�
Number of Fasteners Per Insulation Board:
Design Wind Pressures,From RAS 128 Or Calculations:
Zone 1 . Zone 1: Zone 2: Zone 3:
Zone 1':_Zone 1: Zone 2: Zone 3: Illustrate Components Noted and Details as Applicable:
Max. Design Pressure,from the specific product approval Woodblocking, Gutter, Edge Termination, Stripping,
system: Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterf lashing,Coping, Etc.,
Deck: Indicate: Mean Roof Height, Parapet Height, Height of Base
Type: ��y(.�0� Flashing,Component Material,Material'Thickness,Fastener
Gauge Thickness: f.}, [� Type,Fastener Spacing or Submit Manufacturers Details that
--�qe
Comply with RAS 111 and Chapter 16..
Slope: i a A
Anchor/Base Sheet&No.df Ply(s): (�J�
Anchor/Base Sheet Fastener/Bonding Material: FT.
Insulation Base Layer:
Base Insultation Size and Thickness: Parapet
Base Insulation Fastener/Bonding Material: Height
Top Insulation Layer:
Top Insulation Size and Thickness: FT.
Top Insulation Fastener/Bonding Material: 161
S�ee� Mean
Base Sheet(s)&No.of Ply(s): I ply Roof
Base Sheet Fastener/Bonding Material: Height
Ply Sheet(s)'&No.of Ply(s): j�j �6
Ply Sheet Fastener/Bonding Material: �Y`p —
Top Ply: ef-c-tle^ 4J-
Top Ply11Faastener/Bonding Material: