HomeMy WebLinkAboutRoofing Felt Installation Recomendations r� I
i •p x(„ i
File COPY
WARRIORe ROOFING MANUFACTURING
P.O.BOX 40185+TUSCALOOSA.AL 35M+PHONE(205)553.1 34+FAX(205)5W 755
f
193 LEROY ANDERSON ROAD+MONROE,GA 30655+PHONE(770)207-0695+FAX(770)207-0775
. qq
Q4 323 DEVELOPMENT AVENUE+CHAMBERSBURG,PA 17201+PHONE(717)709.0323 i rrFF��,i
FRXYAR709-0027
JA N 1 4I 2022
9f Perr"i.�€ll�rjt�r
r i fiiiia
Roofing Felt Installation Recommendations
Be aware that roofing felt should not be walked upon prior to fastening into position.
Proper safety equipment is recommended for all installations. Also,the roof decking
should be clear of debris and moisture prior to installation of the roofing felt.
Roofing felt should be installed from the bottom of the roof in horizontal layers to
increase the water shedding ability of the felt. The initial layer of felt should be installed
to cover the bottom edge of the decking,from edge to edge. Overhang is not required.
i
Anchor the top corner of the felt after it has been properly positioned and roll the felt out
across the roof. Pay careful attention to roll the felt out smoothly, avoiding'iwrinkles as
you move across the roof. The top edge of the felt should be fastened no less than every
eight inches. The middle and bottom edge should also be fastened no less than every -
eight inches. Fasteners should be applied no less than every eight inches along the eaves.
I
The next.course of felt should also be aligned with the roof edge and should overlap the
previous course two inches(sometimes referred to as head lap). In the event you get to
the end of a roll prior to getting to the opposite edge of the roof,-begin a new roll with a
four inch overlap over the end of the prior roll(sometimes referred to as end lap). The
same fastening pattern used on the middle and bottom of the initial course should be used
for each subsequent course. For the top of each subsequent course,fasten intermittently
to hold the top edge in place until the next course is applied. The fasteners in the bottom
of the next course will hold the top of the previous course securely.
Continue up the roof in this manner. Be sure to firmly fasten the top of the final course if
it terminates at the top edge of the roof. Otherwise,overlap the felt over the ridge and
secure then begin at the bottom of the other side of the ridge and repeat the process.
In valleys,lay a vertical section of roofing felt the length of the valley prior to the
installation of the horizontal runs of roofing felt. If you use more than one section of
roofing felt in a valley,be certain to start at the bottom and overlap;each,subsequent
length a minimum of two inches as you move up the valley jLo,nsue Pate-
shedding•
5W"Cx Yl en •
�VA
f } �Mt
i
i
I
I
In the event some wrinkles are created while fastening down a course of felt,slice the
wrinkles and fasten them flat to the deck. Then seal the cuts with waterproofing cement.
Installation of the primary roof covering(ex. Shingles)is recommended immediately
after felt installation. i
i
NOTE: LOCAL BUILDING CODES MAY REQUIRE A DIFFERENT FASTENING
PATTERN AND/OR SPECIFIC FASTENER TYPES THAN RECOMMENDED BY
THESE INSTRUCTIONS. PLEASE CONTACT YOUR LOCAL BUILDING CODE
ADMINISTRATOR FOR THE EXISTENCE OF REGIONALLY SPECIFIC
FASTENING REQUIREMENTS. {
i
' 1
j
i
I
. i
i
I
j
I
,
• j
j
I
r_a, yn"V.Yr.dt5�ir14
e^}� $+1 a Af'47j•'iY'h'z'1��.,t.d tila trn. '`,?;Z
+
t•' i,... 9z ` 3 lJ. t u`i4
�
.�aoA L�t 6
r: ...` �
j
1
I
r 'r
BCIS Home E Log In User Registration Hot Topics E Submit Surcharge Stats&Facts Publications Contact Us BCIS Site Map Links Search +
C1i1t a
1111 'Product Approval
%USER:Public User E
.4'
I P''
Product pproval Menu>Product or Application Search>eBplication List>Application Detail l
FL# FL2346 R8
Application Type Revision
j
Code Version 2020
Application Status Approved 1
Comments
d
Archived
I
i
Product Manufacturer Warrior Roofing Manufacturing
Address/Phone/Email 3050 Warrior Road i
Tuscaloosa,AL 35404 1
(205) 553-1734 Ext 115 1
Steven@WarriorRoof!n'g'.net
i
i
Authorized Signature Steven Crew
Steven@WarriorRoofing.net
I
i
Technical Representative Steven Crew
Address/Phone/Email 3050 Warrior Road j
Tuscaloosa,AL 35404 1
(205) 553-1734 Ext1024 i
Steven@WarriorRoofing.net I
I
Quality Assurance Representative Steven Crew SS
Address/Phone/Email 3050 Warrior Road 1
Tuscaloosa,AL 35404
(205) 553-1734 Ext 1'024 I
Steven@WarriorRoofing.net i
Category Roofing
Subcategory Underlayments
I
i
Compliance Method Test Report
1
Testing Lab PRI Construction Materials Technologies, LLC
Quality Assurance Entity Keystone Certifications, Inc.
Quality Assurance Contract Expiration Date 12/31/2024
Validated By Jesus Gonzalez, P.E.
Validation Checklist-Hardcopy Received
i
Certificate of Independence FL2346 R8 COI PRI CMT Cert of Indeoendence.g_df
I
I
Referenced Standard and Year(of Standard) Standard ; Year
ASTM D226 j 2009
ASTM D4869 2016
Equivalence of Product Standards
Certified By Approved Testing Lab
FL2346 R8 Equiv FBC'2020 Standards Equivalency_pdf
i
{
!
a ` {
Product Approval Method Method 1 Option B
I
1
I
Date Submitted 07/02/2020
Date Validated 08/11/2020
Date Pending FBC Approval 08/12/2020
Date Approved 10/13/2020
I
i
Summary of Products
FL# Model,Number or Name Description !
2346.1 #15 and #30 roofing.felt ASTM D 226 Tested
Limits of Use Installation Instructions
Approved for use in HVHZ:Yes FL2346 Rd II InstallationInstructions.pdf
Approved for use outside HVHZ:Yes Verified Byi PRI Construction Materials Technologies, LLC
Impact Resistant: N/A Test Reports
Design Pressure: N/A FL2346 R8, TR 15A Test keport.pdf
Other: Primary roof covering should be installed immediately FL2346 R8, TR 30A Test iteport pdf
after felt. Roofing felt is not intended to be an unprotected I
weathering surface.
2346.2 15w and 30w roofing felt ASTM D 4869 Tested
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL2346 118' II Installation Instructions.pdf
Approved for use outside HVHZ:Yes Verified Byt PRI Construction Materials Technologies, LLC
Impact Resistant:N/A Test Reports iI
Design Pressure: N/A FL2346 R8 TR 15w Test Report.pdf
Other: Primary roof covering should be installed Immediately FL2346 118' TR 30w Test Report pdf
after felt. Roofing felt is not intended to be an unprotected
weathering surface.
i
d
Back Nexk
I
Contact Us::2601 Blair Stone Road,Tallahassee FL 32399 Phone:850-487 11824
The State of Florida is an AA/EEO employer.Cop)_right 2007-2013 State of Florida.::Privaty Statement::Accessibility Statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released In response to la public-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1),
Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455 F.S.must provide the Department with an email address If they have one.The emails
provided may be used for official communication with the licensee.However email addresses are polblic record.If you do not wish to supply a personal address,please
provide the Department with an email address which can be made available to the public.To determine If you are a licensee under Chapter 455,F.S.,please click here.
Product Approval Accepts:
{
'GI`et11�5.+ 1`V j
f' safe
1
i
I
I
I
Y
l
1
a
1
i
I
i
i
u
i
i