HomeMy WebLinkAboutAPPROVED, soil report 2Subsoil Investigation Report
prepared by:
0 ederal
itingineering
esting, Inc.
Client: Mel-Ry Construction, Inc.
Contact: Kathy Gannon
Address: 10967 S. Ocean Drive
Jensen Beach, FL 34957
Project: Proposed Single Family Home
Address: 160 Nettles Blvd
Jensen Beach, FL 34957
Date: Tuesday, November 17, 2020
laterials Testing j Inspections I Environmental
Dederal Phone: 954-784-2941
E-Fax: 954-784-7875
ngineering adminofed-eng.com
www.fed-eng.com
4QUesting, Inc. -
Table of Contents
Client Information ----------------- ---------------------------------------------------------- pg. 1
Project Information-------------------------------------------------------------------------pg. I
General Soil Descriptions ---------- ----------------------------------------------------- pg. I
Foundation Recommendations ----------- —----------------------------------------------- pg. 2
Excavations-----------------------------------------------------------------------------------pg. 3
Grading--------------------------------------------------------------------------------------.pg. 3
Appendices------------------------------------------------------------------------------------- pg. 4
Soil Boring Log(s)
Laboratory Test(s)
Project Location
Soil Boring Location(s)
Soil Classifications
Sampling Procedures
Limitations of Liability
For Your Information
Our findings in this report are based on soil conditions encountered in the test bore locations only, proposed structure to
be built, (if available at this stage), Florida Building Code requirements and standard engineering practices. If your
report is preliminary (i.e. vacant Iand or building to be demolished) additional borings are required within the foot print
of the proposed structure once the location & layout of the proposed structure is known.
Please read this report in its entirety and follow all recommendations. Failure to do so may result in the permitting
agency (Building Department, etc.) withholding the Certificate of Occupancy. This will cause delays and additional
costs. The Permitting Agency will require a final certification or signing off of the project prior to issuing the Certificate
of Occupancy. All of our recommendations need to be followed to receive a final certification from F.E.T., including
densities on each lift, demucking verification, piling inspection, etc., whichever recommendation applies to your
project.
Please schedule us at least 24 hours in advance for all tests and inspections. If you choose to use another Engineering
Firm, you must verify they will provide you with the proper certification in writing, as outlined in our report. Our firm
will only provide a certification letter if it has verified all work as recommended in our report.
337o'NE 5th Avenue t Qakland Park Florida33334
MIAM
CMEC •
CWiNtt
Dederal Phone: 954-784-2941
E-Fax: 954-784-7875
$ngineering admin@fed-eng.com
www.fed-eng.com
� esting, Inc. _ -
Tuesday, November 17, 2020
Mel-Ry Construction, Inc.
10967 S. Ocean Drive
Jensen Beach, FL 34957
Attn.: Kathy Gannon
RE: Subsoil Investigation
Proposed Single Family Home
160 Nettles Blvd
Jensen Beach, FL 34957
Dear Sirs:
Job Order Number 20SB 1134
Pursuant to your request, Federal Engineering & Testing, Inc. has completed a subsoil investigation on 11-14-2020 at the
above referenced site. The purpose of our investigation was to verify subsoil conditions relative to foundation
preparation and design.
A total of one (1) SPT boring was performed according to ASTM D-1586 drilled down to a depth of thirty feet (30) and
one (1) DCP boring was performed according to ASTM D-6951 drilled down to a depth of fifteen feet (15) below the
existing ground surface_ (See attached field sketch for locations). The following is a general description of soil stratas for
the subject site:
Depth To
From
B-1 Description of Soils
0"
3"
Slab Cement
3"
3'
Brown Sand
3'
30'
B]uish Gray Silty Sand with Traces of Shell
Depth
From To
B-2 Description of Soils
0"
6"
Topsoil & Vegetation
6"
3'
Gray Sand with Traces of Shell
3'
15'
113rown Silty Sand with Organics & Traces of Shell
Groundwater table elevation was measured immediately at the completion of each boring and was found at an average
depth of three (3) feet below existing ground surface. Fluctuation in water level should be anticipated due to seasonal
variations and run off as well as varying ground elevation, construction dewatering and pumping activities in the area.
Site contractor must familiarize himself with site conditions in the event groundwater controls and dewatering is needed.
Surface flooding may result under hurricane conditions and should be taken into consideration in the design of the
project. The contractor shall make sure that groundwater levels on adjacent properties are not affected by the contractors
dewatering activities. Specialty groundwater contractors shall be consulted for all work below the groundwater level_
The boring log(s) attached present a detailed description of the soils encountered at each location. The soil stratification
shown on the boring log(s) is based on the examination of the recovered soil samples and interpretation of the driller's
field log. It indicates only the approximate boundaries between soil types. The actual transitions between adjacent soil
types may be gradual.
Tuesday, Novernber 17, 2020
160 Nettles Blvd
Jensen Beach, FL 34957
Page 2
Xderal
nineering
ating, Inc.
Based on our understanding of the proposed structure and the information obtained from our field boring logs; it is
evident that deep foundation systems are needed to support the proposed new structure without detrimental settlement to
the structure.
Per the Florida Building Code FBC 2020, Chapter 18; deep foundation systems shall consist of one of the following
alternatives:
Alternatives
Approximate Depth
Size
Allowable
Comnression Pile
Allowable Tension
Pile Canacitv in
Allowable Lateral
Pin Piles/ Push Piers
Helical Piles
Auger Cast Piles
Auger Cast Piles
Driven
30' or Refusal
30' or Refusal
f 30' BIMLS
30' BELS
4 Inch
3 Inch
12 Inch
14 Inch
Capacity in Tons
5 Tons
12 Tons
25 Tons
35 Tons
Tons
1 Ton
6 Tons
12 Tons
17 Tons
Capacity In Tons
NIA
N/A
1 Ton
2 Tons
*BELS - Below Existing Land Surface*
Estimated Lateral Load for a Pile Top Deflection of 1/4 inch. Proposed pile length based on the existing ground
elevations at the time of drilling. Pile length may vary depending on proposed grade beam elevations and inconsistent
soil profiles. In the case of pin, helical and precast piles a minimum of four (4) test piles shall be driven to determine
production pile length. All work shall be in accordance with the local Building Code and Coastal Zone Construction
Requirements (if required).
Helical pile bearing capacity is dependent on helix numbers, size and spacing. The foundation contractor will be able to
provide the most cost effective combination of helix designs. The above depths are the minimum depths required to
achieve design capacities_ Predrilling might be required to achieve design depths.
All slabs for the subject structure shall be designed as structural slabs spanning between supports and designed by a
Florida Registered Structural Engineer and placed under the supervision of a Geotechnical Engineer. All work shall be
conducted by an experienced Florida Licensed Specialty Piling Contractor. All piles shall be designed by a professional
engineer and shall be placed under the supervision of our Geotechnical Engineer to verify compliance with our
recommendations_ If the pile is not reinforced over the entire length, we recommend a single #7 reinforcing steel bar be
placed the full length of the pile to verify pile continuity.
In case of existing structures in the vicinity of the pile driving operation, care shall be taken not to create excessive
vibration. Vibration levels shall be monitored to verify compliance with county regulations. Steps must be taken to
prevent excessive vibrations. In the event excessive vibrations are experienced during construction, alternative driving
methods shall be implemented (i.e_: predrilling, jetting, hydraulic push, etc ... )-
The minimum center to center spacing of piles or adjacent foundations shall be not less than twice the average diameter
for round piles or 1-3/4 times the diagonal dimensions of rectangular piles, but in no case less than 30 inches. The
installation of adjacent piles (located within 4 feet of each other) on the same working day is not recommended. We
recommend that adjacent piles not be installed until the initial grouted pile has set overnight.
The grout used in the pile installation shall develop a minimum compressive strength of 4000 PSI at 28 days.
Tuesday, November 17, 2020
160 Nettles Blvd
Jensen Beach, FL 34957
Page 3
An9
ederal
ineering
esting, Inc.
Any underground structures such as grease traps, septic systems, etc. must be supported on pile foundations, unless the
deleterious material (i.e.: silt, muck, peat, etc...) is excavated in its entirety and replaced with compacted washed gravel
such as pea rock or #57 stone below the water table elevations and clean granular materials above the water table.
Excavations shall not extend within one (1) foot of the angle of repose next to existing footings or structures unless
underpinned. Trenching shall be in compliance with the Florida Building Code, OSHA and Trench Safety Act
requirements. Shorings shall be designed and inspected by a Florida licensed professional engineer.
Provisions shall be made by the architect, engineer of record and contractor to address differential settlements when
tying in new to existing structures. Mixing of different foundation types shall not be used unless provided with
expansion joints to address differential settlement.
All outside ground surfaces must be sloped away from the structure to avoid water accumulation and ponding. All rain
waters shall be discharged away from all building foundations. Verify all water, sewer, plumbing, sprinkler and drainage
Iines are properly functioning with no leaks in the vicinity of the foundation.
Regardless of the thoroughness of a geotechnical exploration, there is always the possibility that conditions may be
different from those of the test locations; therefore, Federal Engineering & Testing, Inc. does not guarantee any subsoil
condition between the bore test holes. A site plan showing the location of the proposed structure was not provided at the
time the soil borings were performed. Once plans and specifications have been finalized and drawn, Federal Engineering
& Testing, Inc. shall be provided a copy of the finalized plans and specifications for review. For a more accurate
portrayal of subsurface conditions, the site contractor should perform test pits. If different conditions are encountered,
Federal Engineering & Testing Inc., shall be notified to review the findings and make any recommendations as needed.
In accepting this report the client understands that all data from the soil borings is intended for foundation analysis only
and is not to be used for excavating, backfilling or pricing estimates. The site contractor must familiarize themselves
with the job site conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. For Environmental
due diligence, a Phase I and/or Phase lI Environmental Site Assessment is recommended.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of
clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
Federal Engineering & Testing, Inc. appreciates the opportunity to be of service to you at this phase of your project.
Please feel free to contact us,ifl W�&ppM4 ' be of further service to you.
♦����+� ,� � f i f it P+,`���
Sincerely, 9"
.59394
Keith LeBlanc, P1,
Federal Engineeri"Tes Jmg, `=
Florida Reg. No. 5�i A� Q R
Certificate of Authori��Zj*i(g j�4 �l
���rFrrllil4Yl�t�,
Tuesday, November 17, 2020
160 Nettles Blvd
Jensen Beach, FL 34957
Page 4
Appendices
cgikh
ederal
Agineering
esting, Inc.
"ederaI Phone: 954-784-2941
E-Fax: 954-784-7875
(Aesting,
gineering admin@ied-eng.com
www.fed-eng.com
Inc. �_
SPT Test Boring Report
Client: Mel-Ry Construction, Inc. Date of Test: November 14, 2020
Project: Proposed Single Family Horne Hole No.: B-1
Address: 160 Nettles Blvd Location: See Attached Drawing
Jensen Beach, FL 34957
[Depth (FT)
Soil Descriptions
Hammer Blows
"N"
1
0" 3" Slab Cement
1 4
2
3" - 3' Brown Sand
7 8
11
3
8 9
4
10 11
19
5
9 10
6
11 7
21
7
10 14
8
10 11
24
9
12 9
10
9 8
18
11
A A
12
A A
A
13
A A
14
A A
A
15
7 8
16
3'- 30' Bluish Gray Silty Sand with Traces of Shell
9 9
17
17
A A
18
A A
A
19
A A
20
A A
A
21
t0 11
22
12 10
23
23
A A
24
A A
A
25
A A
26
A A
A
27
12 14
?$
10 14
24
29
A A
30
A A
A
Water Level: 313"
A = Auger
Below Land Surface
Dederal Phone: 954-784-2941
E-Fax: 954-784-7875
0
ngineering admin@fed-eng.com -31,www.fed-eng.com
Woesting, Inc. R .. ...
Test Boring Report
Client: Mel-Ry Construction, Inc. Date of Test: November 14, 2020
Project: Proposed Single Family Home
Address: 160 Nettles Blvd
Jensen Beach, FL 34957
Hole No.: B-2
Location: See Attached Drawing
Depth (FT)
Soil Descriptions
Hammer Blows
"N"
1
0" - 6" Topsoil & Vegetation
10 11
2
6" - 3' Gray Sand with Traces of Shell
15 15
26
3
14 8
15
4
7 9
5
10 8
6
7 8
15
7
9 10
21
8
3' 15' Brown Silty Sand with Organics & Traces of Shell
11 12
9
(6.2% Organics & 56.82% Passing 200 Wash)
10 9
17
10
8 7
11
8 9
12
10 11
19
13
12 10
19
14
9 8
15
10 10
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Water Level: 3'2"
A = Auger
Below Land Surface
Oederal
Q ngineering
U& Oesting, Inc.
Report of Organic Content ASTM-D 2974
Date: Saturday, November 14, 2020
Mel-Ry Construction, Inc.
10967 S. Ocean Drive
Jensen Beach, FL 34957
Attn.: Kathy Gannon
RE: Proposed Geotechnical Services
Proposed Single Family Home
160 Nettles Blvd
Jensen Beach, FL 34957
I
Phone: 954-784.2941
E-Fax: 954-784-7875
admin@fed-eng.com
www.fed-eng.com
Job Order Number 20SB 1134
Results of Test
Sampled by: TS Reported To: Client
Sample Location: See Location on Subsoil Drawing
Material Description: Brown Silty Sand with Organics & Traces of Shell
Sample Location and Depth
Organic Content Percentage
B 1
N/A
N/A
B2
T - 15'
6.2%
B3
N/A
N/A
B 4
NIA
N/A
B5
N/A
N/A
Tested By: Si
Checked By: KL
IL
3370 NE 5th.Avenue I Oakland PPE fforida 33334
/� • MI�� F007
AppravM Laoaraeary
Dederal Phone: 954-784-2941
£-Fax. 954-784-7875
engineering admin@fed-eng.com
www.fed-eng.com
V%resting, Inc. 3370 NE 5th Avenue Oakland Park, Fforida
Date: Saturday, November 14, 2020
Me]-Ry Construction, Inc.
10967 S. Ocean Drive
Jensen Beach, FL 34957
Attu.: Kathy Gannon
RE: Proposed Geotechnical Services
Proposed Single Family Home
160 Nettles Blvd
Jensen Beach, FL 34957
Sampled by:
Sample Location:
Material Description:
Sieve Start Weight:
No. 200 Wash Sieve Analysis
Job Order Number 20SB1134
Results of Test
TS Sample Date: I V14/2020
B-2 (3' - 15') Sample Number: B-2 (3' - IT)
Brown Silty Sand with Organics & Traces of Shell
145.91g
Sieve Size
Cumulative Weight
Retained
Cumulative %
Passing
Cumulative %
Retained
#200 (0.075 mm)
63
56.82
43.18
Pan
-
-
-
Tested By: Si
Checked By: KL
* 333Q°5th Avenue Oakland Park, FtMir. a 3334
'�MIAM
w
GMEC • ■
[QUIiS11 GrT
An9ederal
ng
esting, Inc.
0 t
Soil Boring Location Map
Federal Engineering & Testing Inc. 3370 NE 5th Avenue, Oakland Park, FL 33334
Client: Mel-Ry Construction, Inc. Project: Proposed Single Family Home
Test: Subsoil Investigation Project Address: 160 Nettles Blvd
(site map is not to scale) Jensen Beach, FL 34957
784-2941
Angederal
ineering
esting, Inc.
Soil Classifications
Correlation of Penetration Resistance with Relative Density and Consistency
Sands
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Hamner Blows
Relative Density
0 -10
0-4
Very Loose
11 - 25
5 - 10
Loose
26 - 45
11 - 20
Firm
45 - 75
21 - 30
Very Firm
76 -120
31 - 50
Dense
> 120
> 50
Very Dense
Silts & Clay
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Hammer Blows
Relative Density
0-6
0-2
Very Soft
7-15
3-5
Soft
16-30
6-10
Firm
31 - 45
11 - 15
Stiff
46 - 90
16 - 30
Very Stiff
91 - 150
31 - 50
Hard
Rock Hardness Description
Soft
Rock core crumbles when handled
Medium
Can break core with your hands
Moderately Hard
Thin edges of rock core can be broken with fingers
Hard
Thin edges of rock core cannot be broken with fingers
Very Hard
Rock core rings when struck with a hammer
Sand Quantity Modifiers
Very Slight Trace
0 - 2 %
Slight Trace
2 - 5 %
Trace
5 - 10 %
Little Trace
10 - 15 %
Some
15 - 30 %
With
> 30 %
Silt - Clay Quantity Modifiers
Slightly Silty /Clayey
0 - 5 %
Silty / Clayey
5 - 30 %
Very Silty / Clayey
30 - 50 %
Particle Size
Boulder
> 12 in
Cobble
3 - 12 in
Gravel
4.76 mm - 3 in
Sand
0.074 mm - 4.76 mm
Silt
0.005 mm - 0.074 mm
Clay
< 0.005 mm
Anederal
gineering
eating, Inc.
Drilling & Sampling Procedures
The soil borings were installed in accordance with Standard Penetration Tests procedures as set forth in ASTM D-1586.
Representative samples were collected utilizing spilt -barrel techniques in accordance with the procedures set forth in
"Penetration Tests and Spilt -Barrel Sampling of Soil in ASTM D-1586. The following field tests, measurements and
laboratory analysis were performed/collected during the installation of each soil boring_
Penetration Tests
During the sampling procedures, Standard Penetration Tests were performed at five (5) foot intervals to obtain the
standard penetration value (N) of the subsurface soil. The standard penetration value (N) is identified as the number of
blows of a 140-pound hammer falling thirty (30) inches, required to advance the spilt -barrel sampler one (1) foot into the
subsurface soil. The sampler was lower into the bottom of the previously cleaned drill hole and advanced by blows from
the hammer. The number of blows was recorded for each of the three (3) successive increments of six (6) inches
penetration. The "N" value is obtained by adding the second and third incremental numbers.
Water Level Measurements
Water Level depths were obtained during the test boring operations. In relatively pervious soils, such as sandy soils, the
indicated depths are usually reliable groundwater levels. Seasonal variations, tidal conditions, temperature, land -use and
recent rainfall conditions may influence the depths to groundwater levels.
Soil Properties / Classification
All samples collected were classified in accordance with the Unified Soil Classification System criteria to determined
soil material properties and compared with published literature of the USDA Soil Conservation Survey.
Ground Surface Elevations
Ground surface elevations have not been provided for the proposed boring locations. Therefore, all references to depth
of the various strata and materials encountered were from existing grade at the time of the drilling operations.
Limitations of Liability
Warranty
We warrant that the services performed by Federal Engineering and Testing,
Inc. (F.E.T.) are conducted in a manner consistent with the level of skill and
care ordinarily exercised by members of the profession currently practicing
under similar conditions. No other warranties, expressed or implied, are
made. While the services of F.E.T. are an integral and valuable part of the
design and construction process, we do not warrant, guarantee, or insure the
quality or completeness of services or satisfactory performance provided by
other members of the construction process and/or the construction plans and
specifications which we have not prepared, nor the ultimate performance of
building site materials. As mutual protection to clients, the public and
ourselves, all reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval. Reports are
not intended for 3rd party use.
Subsurface Exploration
Subsurface exploration is normally accomplished by test borings. The soil
boring log includes sampling information, description of the materials
recovered, approximate depths of boundaries between soil and rock strata and
groundwater data. The log represents conditions specifically at the location
and time the boring was made. The boundaries between different soil strata
are indicated at specific depths; however, these depths are in fact approximate
and dependent upon the frequency of sampling. The transitions between soil
stratum are often gradual. Water level readings are made at the time the
boring was performed and can change with time, precipitation, canal levels,
local well drawdown, and other factors. Regardless of the thoroughness of a
Geotechnical exploration there is always a possibility that conditions may be
different from those of the test locations; therefore F.E.T. does not guarantee
any subsoil condition surrounding the bore test holes. For a more accurate
portrayal of subsurface conditions, the site contractor should perform tests
pits. If different conditions are encountered, F.E.T. shall be notified to review
the findings and make any recommendations as needed.
Laboratory and Field Tests
Tests are performed in accordance with specific ASTM Standards unless
otherwise indicated. All criteria included in a given ASTM Standard are not
always required and performed. Each test report indicates the measurements
and determinations actually made.
Ownership of Tests I Reports
All test results and/or reports prepared by F.E.T. pursuant to this agreement
and/or Addendum(s) thereto, shall remain the property of F.E.T. until all
monies due and owing to F.E.T. under this Agreement and/or Addendun(s)
thereto, are paid in full.
Analysis and Recommendations
The Geotechnical report is prepared primarily to aid in the design of site work
and structural foundations. Although the information in the report is expected
to be sufficient for these purposes, it is not intended to determine the cost of
construction or to stand alone as construction specifications.
® ederal
[a ngineering
& besting, Inc.
Analysis and Recommendations cunt.
In accepting this report the client understands that all data from the soil boring
is intended for foundation analysis only and is not to be used for excavating,
backfilling or pricing estimates. In accepting this report the client understands
that all data from the soil boring is intended for foundation analysis only and
is not to be used for excavating, backtilling or pricing estimates. The site
contractor must familiarize themselves with the job site conditions. Soil
boring(s) on unmarked vacant property or existing structure(s) to be
demolished is considered preliminary with further boring(s) to be performed
after proposed building pad is staked out. Report recommendations are based
primarily on data from test borings made at the locations shown on the test
boring reports. Soil variations may exist between borings and may not
become evident until construction. If variations are then noted, F.E.T. must
be contacted so that field conditions can be examined and recommendations
revised if necessary. The Geotechnical report states our understanding as to
the location, dimensions, and structural features proposed of the site. Any
significant changes in the nature, design, or location of the site improvements
must be communicated to F.E.T. so that the Geotechnical analysis,
conclusions, and recommendations can be appropriately adjusted.
Construction Observations
Construction observation and testing is an important element of Geotechnical
services. The Geotechnical Engineer's Field Representative (Field Rep.) is the
"owner's representative" observing the work of the contractor, performing
tests, and reporting data from such tests and observations. The Geotechnical
Engineer's Field Representative does not direct the contractor's construction
means, methods, operations, or personnel. The Field Rep. does not interfere
with the relationship between the owner and the contractor, and except as an
observer, does not become a substitute owner on site. The Field Rep. is only
collecting data for our Engineer to review. The Field Rep. is responsible for
his/her safety only, but has no responsibility for the safety of other personnel
and/or the general public at the site. If the Field Rep. does not feel that the
site is offering a safe environment for him/her, the Field Rep. will stop his/her
observation/ testing until he/she deems the site is safe. The Field Rep. is an
important member of a team whose responsibility is to observe the test and
work being done and report to the client whether that work is being carried
out in general conformance with the plans and specifications.
Limitations ofReport
Federal Engineering & Testing, Inc. shall have no liability, in contract, tort or
otherwise, for any inaccuracy, defect, or omission in interpreting this report
and shall not in any event have any liability for lost profits or any other
indirect, special, incidental, consequential, exemplary or punitive damages. In
the event of future conflict between owners and contractors the following
applies: F.E.T.(s) legal and/or company representation and preparation for
representation fees will be billed on an hourly rate, i.e_ deposition, expert
witness, etc. F.E.T. has no obligation to amend its conclusions or
recommendations after the date of this report. Any alterations or changes in
the location of the project should be brought to our attention at the earliest
convenience for review and applicability of this report.
Dederal Phone: 954-784-2941
E-Fax: 954-784-7875
,ongineering admin@fed-eng.com
www.fed-eng.com
Vesting, Inc. ,
Soil / Aggregate Tests
Soil Borings
Density Compaction Tests
Grain Size Analysis
Moisture Contents
Soil Classifications
Limerock Bearing Ratios
Florida Bearing Values
Specific Gravity
Carbonate Analysis
Hydraulic Conductivity
Organic Contents
L.A. Abrasion
FDOT Inspections
QC Management
Earthwork Inspections
QC Concrete Inspections
QC Asphalt Inspections
Partial List of Services
Geotechnical Engineering Services
Field Inspection Services
Fill & Quality Control Inspections
Demucking Inspections
Building Inspections
Pile Driving Inspections
Pile Load Tests
Steel Inspection
Threshold Inspection
Bolt Inspection
Weld Inspection
Vibration Monitoring
Geotechnical Engineering
Foundation Engineering
Foundation Design & Recommendation
Subsoil Investigation
Pile Load Calculations
Piling Installation Monitoring
Asphalt Services
Backscatter Density Tests
Extractions & Gradations
Marshall Limits
Hulk Specific Gravity
Cores for Thickness Determination
Asphalt Pavement Monitoring
Asphalt Assessment
Concrete Tests
Concrete Strength Testing
Slump Tests
Windsor Probe Testing
Schmidt Hammer Testing
Core Testing
Air Content
Concrete Unit Weight
Flexual Strength Testing
Environmental Engineering Services
Phase I Site Assessments Phase II Site Assessments Lead Base Paint Surveys
Site Inspections Phase I Follow up on Contaminated Sites Report and Analysis
Research of Property Records Installation of Monitoring Wells Air Monitoring
Soil Borings
Soil and Ground Water Analysis
Roof Testing 8
TAS 105 Field Fastener Withdrawal Test
TAS 106 Tile Uplift Test
TAS 124 Bell Chamber / Bonded Pull Test
TAS 126 Moisture Survey
Windload Calculation
Drainage Calculations
Lightweight Concrete placement Inspection
Roof Assessment / Evaluation
Cap Sheet Inspection
Fastener Spacing Inspection
Tile/ Shingle/ Standing Seam Inspection
Base Sheet Installation Inspection
Insurance Mitigation
Retrofit Mitigation/ Certification
Roof Drainage Calculations
3370441751hAVenue:l Oakland Park. Florida 33334.:
MIAMI
racraw = -Z1 FDqTk)
i�: T resexxrwuau: ..I� App,mW L.b..L.ly -o.� —