HomeMy WebLinkAbout20220118141851477• • • • •• • •
2017 Florida Building Code, Energy Conservation,6th Edition
Jurisdiction:
Permit #:
Job Information
Builder: ti! A� ( t�+"'f' Community: Lot: n t{
��
Address: i,,, ;J i ( Cks.,tll(`r) Ji Unit:
City: T 1(4 State: FL Zip:
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ER/Method.
OPRESCRIPTIVE METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0.2 Inch. w.g. (50 pascals) In Climate Zones 1 and 2:
OPERFORMANCE or ERI METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) Value, as shown on FORM R405-2017 (Performance) or R406 2017{ERI), section labeled as Infiltration, sub -section ACH.
ACH(50) specified on Form R405-2017-Energy Ca/c (Performance) or R406-2617 (ER&
:I x 60 _ (" I 1 = `; (} Method for calculating building volume•
,Li-1
I
CFM(50) BuildmgVolume ACH(50) O Retrieved from architectural plans
[(PASS DFAIL OX Code software calculated
F'jWhen ACH(50) is less than 3, Mechanical Ventilation O Field measured and calculated
installation must be verified by building department.
Testing. Testing shall be conducted in accordance:with ANSI/RESNET/ICC 380 and reported at a�pressure or 0.2 inche w.g. (50:Pascals), Testing
shall be conducted by either individuals as defined in Section553,993(51 or (7). Florida Statues, or individuals licensed as set forth in Section
489.105(3)(f), (g), or (i).oran approved third party. Awritten report of the results of the test shall be signed by the party conducting the test and
provided to the code official, Testing shall be performed at any time after creation of: allpenetrations of the building thermal envelope.
During testing:
1.Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the Intended weatherstripping or other Infiltration `
control measures. -
2.Dampers Including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended Infiltration control
measures. ,:
3,lnterior doors, if installed at the time of the test; shall be open. 4
4.lExterior doorsfor continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5.Heating and cooling systems, If Installed at the time of the test; shall be turned off.
6.Supply and return registers, if installed at the time of the test, shall be fully open. ,-
Testing company
Company Name: LIES, Universal Engineering Sciences Phone: 772-924-3575
1 hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester: Sean Thacker
License/Certification #: 5065970 Issuing Authority: BPI