Loading...
HomeMy WebLinkAboutEnergy Efficiency CodeC W; ilding Performance Method for Commercial Buildings ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs FLA/COM-97 Version 2.2 PROJECT NAME_BLUE,BEACON TRUCK WASH ADDRESS: _ORANGE AVE & OLD D.IXIE HWY_ _FT.. PIERCE, FL 33490 OWNER: _BLUE BEACON INTERNATIONAL_ AGENT: Form 40OA797 PERMITTING OFFICE: _ST_ LUCIE COUNTY CLIMATE ZONE: 6. PERMIT NO:-- JURISDICTION ­NO: 661000 BUILDING TYPE: Service Establishments. CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: _Finished Building CONDITIONED FLOOR AREA: 880 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 5 COMPLIANCE CALCULATION: NUMBER OF ZONES: 1 METHOD A DESIGN CRITERIA RESULT A. WHOLE BUILDING 38.92 100.00 PASSES PRESCRIPTIVE REQUIREMENTS: :'.. LIGHTING EXTERIOR LIGHTING 75.00� `. 400.-00 PASSES LIGHTING CONTROL REQUIREMENTS PASSES HVAC EQUIPMENT COOLING EQUIPMENT .1. SEER 11.00 - 10.00 PASSES HEATING.EQUIPMENT 1. Et 10.00 N/A AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTSs 1. With Insulated Roof 7.00 4_20 PASSES REHEAT SYSTEM TYPES USED ci NO REHEAT SYSTEM is USED WATER,HEATING EQUIPMENT 1. EF 18.30 0.92 PASSES PIPING INSULATION REQUIREMENTS 1. Non -Circulating 2.00 1.00 PASSES -----=------------ ---------- 7--------------------------------------------- COMPL'IANCE CERT IC TION: I hereby cer t the plans and Review of the plans and specifica- _ specificati s red by this calcu- tions covered by this calculation lation ar -in ith the indicates compliance with the .Florida er "i Code. Florida -Energy Efficiency Code. PREPARE Before construction is completed, DATE: //L this building will be inspected for compliance in accordance with I hereby certify that this building is Section 553.908, Florida Statutes. in compliance with the Florida Energy BUILDING OFFICIAL: Efficiency Code. DATE: OWNER/AGENT: