HomeMy WebLinkAboutEnergy Efficiency CodeC
W; ilding Performance Method for Commercial Buildings
ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Community Affairs
FLA/COM-97 Version 2.2
PROJECT NAME_BLUE,BEACON TRUCK WASH
ADDRESS: _ORANGE AVE & OLD D.IXIE HWY_
_FT.. PIERCE, FL 33490
OWNER: _BLUE BEACON INTERNATIONAL_
AGENT:
Form 40OA797
PERMITTING OFFICE:
_ST_ LUCIE COUNTY
CLIMATE ZONE: 6.
PERMIT NO:--
JURISDICTION NO: 661000
BUILDING TYPE: Service Establishments.
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: 880
MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 5
COMPLIANCE CALCULATION:
NUMBER OF ZONES: 1
METHOD A
DESIGN
CRITERIA
RESULT
A. WHOLE BUILDING
38.92
100.00
PASSES
PRESCRIPTIVE REQUIREMENTS:
:'..
LIGHTING
EXTERIOR LIGHTING
75.00� `.
400.-00
PASSES
LIGHTING CONTROL REQUIREMENTS
PASSES
HVAC EQUIPMENT
COOLING EQUIPMENT
.1. SEER
11.00 -
10.00
PASSES
HEATING.EQUIPMENT
1. Et
10.00
N/A
AIR DISTRIBUTION SYSTEM INSULATION
REQUIREMENTSs
1. With Insulated Roof
7.00
4_20
PASSES
REHEAT SYSTEM TYPES USED
ci
NO REHEAT SYSTEM is USED
WATER,HEATING EQUIPMENT
1. EF
18.30
0.92
PASSES
PIPING INSULATION REQUIREMENTS
1. Non -Circulating
2.00
1.00
PASSES
-----=------------ ---------- 7---------------------------------------------
COMPL'IANCE CERT IC TION:
I hereby cer t the plans and
Review of
the plans and
specifica-
_
specificati s red by this calcu-
tions covered
by this
calculation
lation ar -in ith the
indicates
compliance
with the
.Florida er "i Code.
Florida -Energy
Efficiency
Code.
PREPARE
Before construction
is
completed,
DATE: //L
this building
will be
inspected
for compliance in accordance with
I hereby certify that this building is Section 553.908, Florida Statutes.
in compliance with the Florida Energy BUILDING OFFICIAL:
Efficiency Code. DATE:
OWNER/AGENT: