Loading...
HomeMy WebLinkAboutFinal Building Inspection;r Chilberg construction company June 27, 2000 Mr. Ray Wazny Head Building Official St. Lucie Community Development Department Building Division Re: Final Building Inspection Blue Beacon Truck Wash I am in need of some help in the matter of the final inspection for the above named project. We have failed several -inspections on our HVAC system. We feel we comply with all codes in effect for this system. Please find the listed concerns of your building inspector Mr. Joe Dan Whitacker. r 1'.) Lack of 12"x12" Fresh air intake on return side, one has been supplied inspector has not acknowledged, venting can be revealed by removing 2 ceiling panels. 2.) 12"X12" Combustible fresh air make up in door has been supplied, concerns addressed about positioning intake in door, is not discouraged or rejected in the S.H.C. 1) There is also an interpretation on the confinement classification of this mechanical room, however we feel we comply for both types of confinement. I would appeal to you to help me resolve these items as soon as possible to allow Blue Beacon to start operations. We pride ourselves in the quality of construction provided by this firm. We feel we have constructed a superior product in your county which will supply St. Lucie County with a good tax base for the future. I would like to resolve these items today ( 6-27-00) so they can at -least start training in this facility. Possibly since the inspector has not signed off on the above.listed items, I could write a letter to St. Lucie County certifying all items addressed will comply with county and state codes by 6-29-00 if the county could grant a conditional certificate of occupancy until then. Thank -you for your time in this matter and am looking forward to'liear from you. Co., Inc. al & Residential Development N-myrr Vem Reach, Alorida .17.9FQ Tel sal .97R1- 0110 Ad MOO N 00 0 a 3 81 [ H tiibergePt ti: l l 0 0 0 Z' 1 Z' u n f v Chilberg aonstrucdon company Building Inspector: Mr. Joe Dan Whitacker 18t. Inspection a) 411 flue needed a 6" clearance from combustible only 1" is needed b) Power Ventilated automatic fresh air intake with automatic shut switch c) Attach flue better d) Supply ceiling with 2 sheets 5/8 " drywall e) Supply specifications for 100,000 btu furnace 2Nd 'a) 12u12" fresh air make up in door not, acceptable b) Mechanical engineer needed to sign off on situation O AL '"------'al & Residential Development 6' d Z Z P' O N:,7nn vem Reach, Plndda 12960 TH 161.978 r, O l i O i S N O O O N 3 81 I H O:ub,,gQN V t t: I 1 0 0 0 Z L Z' U n f t hil978.1707 i ",7as construction company,- Femix Tot Mr. Ray Wazny �¢ From: Steven Chilberg IPMW. 1"8 9e- 2. (P 2- oats: June 27, 2000 Phone: Pages.- 3 Rem Final Inspection for the Blue Beacon CCI Dana Morse 0 Urgent ❑ For 111"aw ❑ Please Comment 0 Please Reply ❑ Please Recycle tcommonts: iA & Residential Develapmene l' d Z Z 9 ti' O Mutt Vern Brach, Florida 32960 Te116I.97B.1 k O I l O N d l S N 0 aN 3 81 I H O.hM,@,W b E V: l l 0 0 0 ZL Z' u n f