Loading...
HomeMy WebLinkAboutFire Prevention Plan ReviewST LUCIE COUNTY FIRE DISTRICT BUREAU OF FIRE PREVENTION PLAN REVIEW 2400 Rhode Island Avenue Ft Pierce, FL 34950 (Omew Construction ( )Tenant Improvement Jurisdiction: Occupancy: Address: Contractor Contractor's Address State: Arch itect/Engineer: Building Owner: Occupancy Type: Gross sq ft: Occupant Load: Construction Type: Telephone: 772-462-8306 FAX: 772-462-8466 ( )Addition ( )Renovation/alterations ( )Shell Only SLC Prima Vista Crossing Retail 102 7530 S US 1 Keene Construction 1400 Hope_ Road Florida Tagliarini Architects Mercantile 1,100 1. All revisions must :be in compliance before the finE 2. The Fire Marshal requires 24 hour notice on all in,, 3. The respective Building Department shall schedule 4. Permit fees are required to be paid in full prior to 5. Failed inspections require payment of fee prior to� 6. A copy of the required revision/s have been trans 7. Penetrations through rated assemblies shall be of 8. UL design criteria shall be submitted with the cone NOTE inspection. F.P.B.: Building Dept: Number of stories: Phone # City: Zip Code: Phone # Review Date: Automatic sprinklers: Net sq ft: Based On: SBCCI Type: B-02-255 22070387 1 407-740-6116 Maitland 32751 954-427-3076 8/7/2002 Exisitng all final inspections through the Fire Marshal's Office. ny inspections. escheduling of further inspections. fitted to the Architect () Contractor ( ). proper UL design. truction plans. THE FLORIDA FIRE PREVENTION CODE,2001 EDITION IS CURRENTLY ENFORCED. RE JSIONS REQUIRED ACCESS BOX IS REQUIRED ( ) ACCESS KEY SWITCH REQUIRED ( ) 1. A separate permit is required for alterations/addi 2. Provide portable fire protection. 3. A minimum of one manual pull station and one a This shall[ be connected to the fire alarm system 4. The one hour tenant separation wall shall be seE The drywall shall be cut and follow the deck flute within the limits of the fire caulk. v 5. A smoke test is required for the HVAC system st Reviewed by: -7— to the fire sprinkler system. edible/visual signal is required to initiate an alarm. A separate permit is required. ed with a UL listed fire caulk not tape and drywall mud. The termination of the drywall to the deck shall be utdown were applicable. Date: 8/7/2002