HomeMy WebLinkAboutATC STRAZULLA_5120_Submittal Memo-EFR_9-21-2021 I
i
►�' CHARLOTTE OFFICE
\1 10700 SIKES PLACE,SUITE 360
CHARLOTTE, NC 2$277
kM T ❑ W E R 980.202,5553
\\ PRoesionRia�s WWW.TEPGROUP.NET
Date: 9/21/2021
To: St. Lucie Building Department
From: Tower Engineering Professionals, Agent for ATC
Site Location: ADVANCED COMMUNICATIONS TECHNOLOGY INC
Site Name/Number: STRAZULLA—5120
Project Scope: WIRELESS ANTENNA UPGRADE & GENERATOR SWAP AT EXISTING CELL TOWER
. ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ .
Please see the attached zoning/building permit submittal items for this project:
• Construction Drawings (plans)
• Structural Analysis
• Permit Application
• Owner Letter of Authorization
• Contractor Power of Attorney
This is an application for modification to an existing site. Under Section 6409 of the Spectrum Act(47 U.S.C. §
1455(a), 47 C.F.R. § 1.6100), this modification qualifies as an eligible facilities request for streamlined review as it
meets the following criteria:
• It is an existing wireless facility.
• The proposed modification:
• Does not propose an increase in height by more than the greater of 10%or the height of an
additional antenna array plus up to 20'of separation from the top of the nearest existing antenna
• Does not involve any new excavation of more than 30'in any direction of the existing site
• Does not propose more than 4 new equipment cabinets
• Does not defeat the concealment elements of the eligible support structure
• Does not violate conditions associated with the prior approval of the tower
Please feel free to contact me with any questions.
Sincerely,
Abby Paul
Permit Specialist
CIVIL I GEOTECHNICAL I SURVEY I INSPECTION I STRUCTURAL I PM&E I ENVIRONMENTAL I CONSTRUCTION I SITE ACQUISITION SERVICES
Nationwide Since 1997