Loading...
HomeMy WebLinkAboutATC STRAZULLA_5120_Submittal Memo-EFR_9-21-2021 I i ►�' CHARLOTTE OFFICE \1 10700 SIKES PLACE,SUITE 360 CHARLOTTE, NC 2$277 kM T ❑ W E R 980.202,5553 \\ PRoesionRia�s WWW.TEPGROUP.NET Date: 9/21/2021 To: St. Lucie Building Department From: Tower Engineering Professionals, Agent for ATC Site Location: ADVANCED COMMUNICATIONS TECHNOLOGY INC Site Name/Number: STRAZULLA—5120 Project Scope: WIRELESS ANTENNA UPGRADE & GENERATOR SWAP AT EXISTING CELL TOWER . ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ . Please see the attached zoning/building permit submittal items for this project: • Construction Drawings (plans) • Structural Analysis • Permit Application • Owner Letter of Authorization • Contractor Power of Attorney This is an application for modification to an existing site. Under Section 6409 of the Spectrum Act(47 U.S.C. § 1455(a), 47 C.F.R. § 1.6100), this modification qualifies as an eligible facilities request for streamlined review as it meets the following criteria: • It is an existing wireless facility. • The proposed modification: • Does not propose an increase in height by more than the greater of 10%or the height of an additional antenna array plus up to 20'of separation from the top of the nearest existing antenna • Does not involve any new excavation of more than 30'in any direction of the existing site • Does not propose more than 4 new equipment cabinets • Does not defeat the concealment elements of the eligible support structure • Does not violate conditions associated with the prior approval of the tower Please feel free to contact me with any questions. Sincerely, Abby Paul Permit Specialist CIVIL I GEOTECHNICAL I SURVEY I INSPECTION I STRUCTURAL I PM&E I ENVIRONMENTAL I CONSTRUCTION I SITE ACQUISITION SERVICES Nationwide Since 1997